Loading...
HomeMy WebLinkAbout1996-008509 - furn/ac/vent PERMIT CITY OF ORONO PERMIT TYPE: 2750 Kelley Parkway- P.O. Box 66 MECHANICAL Permit Number: Crystal Bay, Minnesota 55323 tjC1,_5i)l (612)473-7357 Date Issued: 10/22/9A SITE ADDRESS: 850 OLD CRYSTAL BAY RD 53 LSV P. I . N. . 09-117-23-12-0005 DESCRIPTION: FURN/AC/VENT 1 HEATING SYSTEMS FLUE IE 3" FUEL NATURAL GAS MAKE CARRIER MODEL MS8X OUTPUT 100,000 INPUT 120,000 1 AIR CONDITIONING MAKE CARRIER TON=: 4 1 VENTILATION MAKE 1 KIT/4 BATH REMARKS: FEE SUMMARY: VALUATION $9;'975 Base Fee $124 . 69 Surcharge Total Fee $129. 68 CONTRACTOR: - Applicant - OWNER: K:I NU'E:WAY PLUMBING ; 47q=,71 S HALE MR. 6250 HWY 12 850 OLD CRYSTAL BAY RD S MAPLE PLAIN MN AS:-.:Sq ORONO MN SS:::91 (5,12) 479-6715 THE UNDERSIGNED HEREBY REQU ESTS PERMISSION .T MAKE TME-REAL R SPECIFIED AND AGREES TO DO ;,ALL WaRK IDIµ STR r; „r N E ` TH L 'CITU ORi:iN0 ORDINANC:ES AND ESTATE OF MINNESOTA BUILDING ° 'ODE REQUIRE,ATS APPI ICA ITEE SIGNATURE ISSUED BY:SIGNATURE CITY OF ORONO APPLICATION FOR MECHANICAL PERMIT Box 66 (2750 Kelley Parkway) Crystal Bay, MN 55323 GENERAL INFORMATION 1. You may apply for mechanical permits by mail or in person at the City offices. Applications will be reviewed and a permit will be issued within 2 working days. 2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT VALID UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS POSTED ON THE JOB SITE. 3. Mechanical Designs - Complete calculations, details and specifications are required for each heating, ventilation, humidification-dehumidification, and air conditioning installation including heat loss/heat gain calculation, design temperatures, equipment ratings and identification as to type, manufacturer and model. Data shall be presented on form provided. Identification of and specifications for water heating equipment shall also be provided. 4. When any new construction or remodeling is involved, a separate building permit must be obtained. 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code requirements. 6. All work must be inspected (rough-in and final). Call 473-7357. 24-hour notice required. 7. House Heating Test Record must be submitted before final. Instructions Complete all items on this application. Compute the permit fee. Sign and date the certification. INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED. If you have questions, call 473-7357. 2()Please check one: New Addition Repair Replace Residential Commercial JOB SITE:_ 3 cL- a e s-7,;1742,4-7 e( Zip: Owner's Name: l��y�� _ Telephone Number: Mailing Address: City: Zip: Contractor'sName: w ` - , / Tellephone ber: '-,<7 s-'7. Mailing Address: 2 �2 City: Zip: 5S3 SYSTEM DESCRIPTION HEATING SYSTEMS Quantity: / Make: �ra ✓z.2 /6_ Model: Fuel: Flue Size: 3 y Input BTUs: /20, oao _ Output BTUs: CFM: COOLING SYSTEMS Quantity: l— �%�i2 �.� Make: ��o Model: _ Tons: 7 o t H. Power WOOD BURNING EQUIPMENT Wood stove with flue Wood combination or add-on Factory fireplace with flue Factory Fireplace (s) Freestanding Masonry Wood Stove (s) Franklin, other Brand Name Model No. Mfgr's Min., Clearances, side , rear , min. flue dia. VENTILATION No. / Kitchen Exhaust ducted recirculating cfm No. v Bath Exhaust (must be ducted outside) cfm No. Other Fans: Locations cfm FUEL STORAGE (MUST BE APPROVED BY FIRE MARSHAL) Installation Removal Fuel oil: gallons underground inside _ outside LP Gas: gallons Other Gas opening PERMIT FEE CALCULATION 1. 1.25% of Contract Price* or Minimum Fee ($35.00) ( c'`-) x .0125 $ (contract price) 2. State Surcharge. ** Add the State Building Code Division Surcharge to each permit. x .0005 $ or $.50, whichever is greater (contract price) 3. Postage and Handling (Only mail-in applications) $ 1.50 4. TOTAL PERMIT FEE (Add lines 1-3 above) $ * CONTRACT PRICE or JOB COST means the actual or estimated dollar amount charged for the permitted work including materials, labor, profit, and other fixed costs. It is the amount to be charged to the customer for the work done. If any material, equipment, labor, or installation are furnished by the owner, tenant or any other party the reasonable market value of such items must be added to the estimated cost or contract price for permit fee purposes. In the event that there is a dispute on the amount of the job cost, the City may request the submission of a signed copy of the actual contract. ** The STATE SURCHARGE is .0005 of the contract price under $1,000,000 or $.50 - whichever is greater. For valuations over $1,000,000 call the Department of Inspectional Services for the price. The undersigned hereby applies to the City for issuance of a Mechanical Permit, agrees to do all work in strict accordance with the ordinances of the City and the regulations of the Minnesota State Building Code, and c- ifies t .t all statements made on this application are complete, true and correct. Applicant's Signatu -: �� Date: b-16 6--T, Approved By: Date: /0 --;2-9 • 10-21-96 60601903 .15 DETAILED REPORT FOR ENTIRE HOUSE Prepared For: Prepared By: RAY HALE LOUIS KING 0 KINGSWAY MECH. ORONO , MN 0 Job Name: HEAT & COOL LOADS *************************************************************************** EXPOSURE GLASS NORTH SOUTH EAST WEST NE/NW SE/SW HORZ . TOTAL AREA 162 327 158 44 0 0 48 739 COOLING 2, 300 7, 259 6, 984 1, 945 0 0 6, 778 25, 266 HEATING 6, 648 13,420 6,484 1, 806 0 0 2, 873 31, 231 BELOW WALLS NORTH SOUTH EAST WEST NE/NW SE/SW GRADE TOTAL AREA 770 975 580 322 0 0 0 2, 647 COOLING 631 799 475 264 0 0 0 2, 169 HEATING 3, 053 3, 866 2, 300 1, 277 0 0 0 10,495 DOORS NORTH SOUTH EAST WEST NE/NW SE/SW TOTAL AREA 0 21 0 0 0 0 21 COOLING 0 230 0 0 0 0 230 HEATING 0 1, 115 0 0 0 0 1, 115 FLOOR AREA COOLING HEATING 4324 1 0 I 5,448 CEILING AREA COOLING HEATING 4324 1 2, 124 I 4, 901 MISCELLANEOUS COOLING LOADS People Sensible Load 900 Latent Load 11,521 Lights & Appl . Load 3,413 Latent Safety Btuh 1, 152 Ventilation Load 2, 063 Duct Heat Gain 0 Infiltration Load 2, 240 Sensible Safety Btuh 3, 840 TOTAL SENSIBLE LOAD 42, 245 TOTAL LATENT LOAD 12, 674 Summer ACH 0 .25 Temp. Swing Mult. 1 .00 *** Total Cooling Load 54, 919 BTUH Or 4 .58 Tons *** MISCELLANEOUS HEATING LOADS Infiltration Load 26, 883 Ventilation Load 12, 375 Duct Heat Loss 0 Safety Btuh 9, 245 Winter ACH 0 .49 *** Total Heating Load101, 694 BTUH *** 6W 10-21-96 60601903 . 15 DETAILED REPORT FOR BASEMENT Prepared For: Prepared By: RAY HALE LOUIS KING 0 KINGSWAY MECH. ORONO , MN 0 Job Name: HEAT & COOL LOADS *************************************************************************** EXPOSURE GLASS NORTH SOUTH EAST WEST NE/NW SE/SW HORZ . TOTAL AREA 0 170 51 8 0 0 0 229 COOLING 0 3, 774 2, 254 354 0 0 0 6, 382 HEATING 0 6, 977 2, 093 328 0 0 0 9, 398 BELOW WALLS NORTH SOUTH EAST WEST NE/NW SE/SW GRADE TOTAL AREA 77 496 309 142 0 0 0 1, 024 COOLING 63 406 253 116 0 0 0 839 HEATING 305 1, 967 1, 225 563 0 0 0 4, 060 DOORS NORTH SOUTH EAST WEST NE/NW SE/SW TOTAL AREA 0 0 0 0 0 0 0 COOLING 0 0 0 0 0 0 0 HEATING 0 0 0 0 0 0 0 FLOOR AREA COOLING HEATING 2162 1 0 I 5, 448 CEILING AREA COOLING HEATING 2162 1 0 I 0 MISCELLANEOUS COOLING LOADS People Sensible Load 0 Lights & Appl . Load 0 Ventilation Load 0 Duct Heat Gain 0 Infiltration Load 929 Sensible Safety Btuh 815 TOTAL SENSIBLE LOAD 8, 965 Summer ACH 0 .25 MISCELLANEOUS HEATING LOADS Infiltration Load 11, 148 Ventilation Load 0 Duct Heat Loss 0 Safety Btuh 3, 005 Winter ACH 0 .50 *** Total Heating Load 33, 060 BTUH *** 10-21-96 60601903 .15 DETAILED REPORT FOR MAIN Prepared For: Prepared By: RAY HALE LOUIS KING 0 KINGSWAY MECH. ORONO , MN 0 Job Name: HEAT & COOL LOADS *************************************************************************** EXPOSURE GLASS NORTH SOUTH EAST WEST NE/NW SE/SW HORZ. TOTAL AREA 162 157 107 36 0 0 48 510 COOLING 2, 300 3,485 4, 729 1, 591 0 0 6, 778 18, 884 HEATING 6, 648 6, 443 4, 391 1,477 0 0 2, 873 21, 833 BELOW WALLS NORTH SOUTH EAST WEST NE/NW SE/SW GRADE TOTAL AREA 693 479 271 180 0 0 0 1, 623 COOLING 568 392 222 147 0 0 0 1, 330 HEATING 2, 748 1, 899 1, 074 714 0 0 0 6,435 DOORS NORTH SOUTH EAST WEST NE/NW SE/SW TOTAL AREA 0 21 0 0 0 0 21 COOLING 0 230 0 0 0 0 230 HEATING 0 1, 115 0 0 0 0 1 1, 115 FLOOR AREA COOLING HEATING 2162 1 0 I 0 CEILING AREA COOLING HEATING 2162 1 2, 124 I 4, 901 MISCELLANEOUS COOLING LOADS People Sensible Load 900 Lights & Appl . Load 3,413 Ventilation Load 2, 063 Duct Heat Gain 0 Infiltration Load 1, 311 Sensible Safety Btuh 3, 025 TOTAL SENSIBLE LOAD 33, 280 Summer ACH 0 .25 MISCELLANEOUS HEATING LOADS Infiltration Load 15, 735 Ventilation Load 12, 375 Duct Heat Loss 0 Safety Btuh 6, 239 Winter ACH 0 .49 *** Total Heating Load 68, 634 BTUH *** 10-21-96 60601903 .15 SUMMARY REPORT Prepared For: Prepared By: RAY HALE LOUIS KING 0 KINGSWAY MECH. ORONO , MN 0 Job Name: HEAT & COOL LOADS *************************************************************************** DESIGN CONDITIONS for ORONO OUTDOOR INDOOR SUMMER WINTER SUMMER WINTER Dry Bulb 90 -20 75 70 Wet Bulb 75 62 Daily Range 21 Daily Swing 3 .0 Latitude 44 Elevation 822 Safety Factor (%) 10 Latent Factor (%) 30 *************************************************************************** Sensible Room Heating Heating Cooling Cooling Name BTUH CFM BTUH CFM BASEMENT 33, 060 462 8, 965 453 MAIN 68, 634 960 33, 280 1, 681 101, 694 1, 422 42, 245 2, 134 HEATING DELTA T 65 .0 COOLING DELTA T 18 .0 NOTE: *** Calculated Airflow is based upon load requirements . Verify that airflow calculated is compatible with selected equipment requirements . *** DATE TIME CITY OF ORONO p CALLED IN /O INSPECTION NOTICE3 SCHEDULED /' .tx /GS; O PERMIT NO. 7s-a if COMPLETED ADDRESS 6j€/ ( y2 25 /Zai—S OWN ER /Let—Q- CONTR. eZilc�-GC 7 �� TELEPHONE NO. y 9 _ 7/C 0 0 DESCRIPTIONLLJ 01 FOOTINGECHANICAL Rte, 18 EXCAV/GRADING/FIWNG Le) 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION = 05 FINAL 14 SEWER HOOK-UO 06 PROGRESS 07 DEMO SITE 27 SEPTIC MAINT. 21 COMPLAINT • 07 DEMO—FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL J 10 PLUMBING FINAL 36 FOUNDATION REMOVAL • OWNER/CONTRACTOR TO MEET YOU:_YES_NO o COMMENTS: 0; W Q. cc 0 0: 0 W CC W W CC j ORK SATISFACTORY:PROCEED E PROJECT COMPLETE 0; L CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY • ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY 0 BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. INSPECTOR WILL RETURN ❑ PHOTO TAKEN ❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance.473-7357 OwnerlContracts t : Inspector. White Copyllnspector's File Canary Copy/Site Notice q DATE TIME CITY OF ORONO CALLED IN INSPECTION NOTICE SCHEDULED /a– i07. 9 .3 d PERMIT NO. COMPLETED < ADDRESS )/6-el jI .v ->° Ea-4/ OWNER CONTR. `Lc'^u¢a TELEPHONE NO. `--/7 y' 6 7 /-5 DESCRIPTION 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILUNG LL (/) 02 FRAMING 34 MECHANICAL FINAi �� 19 LAKESHORE/WETLANDS O 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL • 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q = 05 FINAL 14 SEWER HOOK-UO 06 PROGRESS I` 07 DEMO—SITE 27 SEPTIC MAINT. 21 COMPLAINT Q 07 DEMO—FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP = 09 PLUMBING RI 0-7 23 SEPTIC FINAL 35 HARD COVER REMOVAL J 0 PLUMBING FINAL 4 36 FOUNDATION REMOVAL • OWNER/C NTRACTOR TO MEET YOU:_YES_NO oCOMMENTS: cc w 0 cc O Cc O W CC Q W W WORK SATISFACTORY:PROCEED PROJECT COMPLETE W • ❑CORRECT WORK&PROCEED i= ISSUE CERTIFICATE OF OCCUPANCY O CI CORRECT WORK,CALL FOR REINSPECTION TEMPORARY 0 BEFORE COVERING PERMANENT C]CORRECT UNSAFE CONDITION WITHIN HOURS. PHOTO TAKEN INSPECTOR WILL RETURN Cl STOP ORDER POSTED.CALL INSPECTOR CITATION ISSUED C] INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inslpection 24 hours in advance.473-7357 OwnerlContrac rPO Inspector. L 1 White Copy/Inspector's File Canary Copy/Site Notice