Loading...
HomeMy WebLinkAboutRe: COO 1. 0.-‘1,. o o A iy I CITYof ORONO r A,,, Municipal Offices \<9ittl i . Street Address: Mailing Address: •g li�4— 2750 Kelley Parkway P.O. Box 66 Orono, MN 55356 Crystal Bay, MN 55323-0066 6 July 2009 Scott & Michelle Miller 85 Old Crystal Bay Rd S Long Lake, MN 55356 Re: 85 Old Crystal Bay Rd S Certificate of Occupancy Building Permit P09168 In May of 2006 the City issued a building permit to construct a new residence on your property at 85 Old Crystal Bay Road South. On May 26, 2006 you entered into an agreement with the City to allow your existing home to remain on the property during the construction of the new residence. A copy of this agreement is enclosed herein. According to the agreement, the existing home was allowed to remain during the construction of the new residence provided you applied for a Conditional Use Permit in order to utilize the existing home as a guest house once the new residence was completed. This agreement instructed you to make the application for the guest house within 60 days of the issuance of the building permit. This did not take place. Therefore according to the agreement, you are to remove the existing home and detached garage from the property. A permit for the demolition of the existing home and detached garage must be obtained prior to issuance of a Temporary Certificate of Occupancy for the new residence. Further the existing home and detached garage must be removed from the property prior to the issuance of a final Certificate of Occupancy. The Certificate of Occupancy will not be issued for the new home without the removal of the existing structures. Please note, occupation of the new residence without a Certificate of Occupancy from the City of Orono is a violation of City Code Your attention to this matter is appreciated. Please contact me at 952.249.4627 or by email at mcurtiscc'�i_ci.orono.mn.us by Wednesday, July 15th to discuss your options. Sincerely, City of Orono r Ovoi Melanie Curtis Planning & Zoning Coordinator c: Lyle Oman, Building Official Telephone(952)249-4600 • Fax(952)249-4616 www.ci.orono.mn.us TEMPORARY CERTIFICATE OF OCCUPANCY City of Orono Building and Zoning Department DATE APPROVED: 6/26/2009 SITE ADDRESS 85 Old Crystal Bay Rd. S. P.LD. 0411723210004 OWNER Scott & Michelle Miller BUILDER Scott & Michelle er MAILIN. DDRESS 85 Old Crystal Bay Rd. S. BUILDING PERMIT: NO. P09168 D E ISSUED 05/26/06 THE FOLLOWING •%: NOTED AS INCOMPLETE OR MISSING.THES UST BE CORRECTED OR COMPLETED AND RE \SPECTED WITHIN 78 DAYS OR THIS CE' IFICATE WILL BE VOID. Failure to correct these : iciencies will cause occupan violation citiations to be issued. Exterior of house and Landscaping to be finished . Sept. 1 , 2009 Call for inspection I hereby agree to make the above correc ons and to call for reinsp ction within the time allowed: Owner/Contractor Date START BILLING FOR: Ci Sewer Building Official Monday,June 29,2009 White:Owner/Builder Green:Billing Clerk Yellow:File TEMPORARY CERTIFICATE OF OCCUPANCY City of Orono Building and Zoning Department 1 DATE APPROVED: 12/29/2009 SITE ADliRESS 85Old Crystal Bay Rd. S. P.I.D. 0111723210004 OWNER Scott & Michelle Miller BUILDER Scott& Michelle Miller MAILING,ADDRF_SS 85 Old Crystal Bay Rd. S. BUILDING PERMIT: NO. P09168 DATE ISSUED 05/26/06 THE FOLLOWING ARE NOTED AS INCOMPLETE OR MISSING.THESE MUST BE CORRECTED OR COMPITETED AND REINSPECTED WITHIN 60 DAYS OR THIS CERTIFICATE WILL BE VOID. Failure to correct these deficiencies will cause occupancy violation citiations to be issued. By March 1, 2010 Existing Ho'ase Must Be Removed I I hereby agree to make the above corrections and to call for reinspection within the time allowed: 119E l Owner/Contractor , � !� Date 1 j1��� START BILLING FOR: J4q,, '< V L'Vh_ Building Official Tuesday,Decembe'r 29,2009 White:Owner/Builder Green:Billing Clerk Yellow:File Melanie Curtis From: Scott Miller[scottm@waysinc.com] Sent: Wednesday, July 15, 2009 3:58 PM To: Melanie Curtis Cc: Lyle Oman; 'Michelle Miller' Subject: Response Melanie; We have received your letter regarding the old house and garage on our property. We have had recent conversations with Lyle Oman about the plans for removal of the buildings and we are in the process of checking all options. Please see Lyle about the details of those conversations. Thank you in advance for your patience in working with us on this issue. We will continue to work this towards the conclusion. Our resources have been greatly affected over the last 9-15 months by changes in our business and the severe hit we have taken in the marketplace due to the economy. But, we are working very hard to keep things rolling and we will—it is just taking more time which I hope you can understand. We do intend to keep the time frame we had discussed with Lyle. Regards, Scott Miller 1 #14:).4OCity of Orono 2750 Kelley Parkway `.;;a. \„, P.O. Box 66 I7!\ '` �, Crystal Bay, MN 55323 �' �M� �G~ (952) 249-4600 e riillio� Fax: (952) 249-4616 FAX TRANSMISSION COVER SHEET Date: 21 September 2005 To: Scott & Michelle Miller Fax: 952.404.7224 Re: Building Permit letter Sender: Melanie Curtis, City Planner YOU SHOULD RECEIVE 7 PAGE(S), INCLUDING THIS COVER SHEET. IF YOU DO NOT RECEIVE ALL THE PAGES, PLEASE CALL 952.249.4627. This letter will follow in the mail. Please contact me at 952.249.4627 if you have any questions. CITY of ORONO A, Municipal Offices C.) Address: Mailing Address: 9kesno* 2750 Kelley Parkway P.O. Box 66 Orono, MN 55356 Crystal Bay, MN 55323-0066 September 21, 2005 Scott & Michelle Miller 85 Old Crystal Bay Rd S Long Lake, MN 55356 Re: 85 Old Crystal Bay Rd S Building Permit Application The City is in receipt of your building permit application which was received by this office on September 14, 2005. The following items must be submitted or revised in order for your application to be considered complete and for the plan review to continue: Certificate of Survey. Please provide a revised copy of the survey indicating the following: 1. The location of the proposed septic system including the primary and alternate treatment areas as designed by Rusty Olson's Percolation and Septic Testing, as well as the location of the existing septic system for the existing house. 2. The proposed driveway located outside of the 25' wetland buffer. The driveway may be located within the 20' buffer setback; however encroachment of the required buffer is not permitted. 3. Calculation of the total dry buildable area vs. wetland for the entire property. Wetland Buffer Requirement. The plan submitted to the watershed district indicates a proposal for vegetative restoration/establishment of the wetland buffer. The buffer vegetation as proposed does not meet the standards set forth within the City of Orono's Wetland Protection Ordinance Section 78-1605. I have attached a copy of this Ordinance for your reference. Please revise and submit a buffer vegetation plan meeting the requirements within Section 78-1605. Request to keep the existing home. Please review, sign and notarize the attached agreement in order to keep the existing home during the construction of your new home. This agreement is required by the City prior to the issuance of a building permit. Should a conditional use permit for a guest house and/or variances for accessory structures located closer to the front lot line than the principal structure be granted for your property prior to the completion of the new home this agreement will be released. The Certificate of Occupancy will not be issued for the new home without the removal of the existing structures absent variance and/or conditional use permit approval. Telephone(952)249-4600 Fax(952)249-4616 www.ci.orono.mn.us Page 2 85 Old Crystal Bay Rd S Please feel free to contact me at 952.249.4627 or by email at mcurtis@ci.orono.mn.us if you have any questions. Sincerely, City of Orono al661 Melanie Curtis City Planner c: Lyle Oman, Building Official Michael P. Gaffron, Planning Director Agreement for Removal of Accessory Structures Right-of-Entry THIS AGREEMENT,made and entered into this day of 20 , by Scott Miller and Michelle Miller (husband and wife), (hereinafter referred to as "Applicants")and the City of Orono, a Minnesota municipal corporation(hereinafter referred to as the "City"). WITNESSETH: WHEREAS, Applicants have made application to the City for demolition of the principal residence structure on the property located at 85 Old Crystal Bay Road S within the City of Orono, Hennepin County, State of Minnesota, such property legally described as: Lot 9, Auditors Subdivision No. 230 (hereinafter referred to as "Subject Property"); and WHEREAS,the Applicants are the owners of the Subject Property; and WHEREAS, the Subject Property contains an existing principal residence structure and a conforming detached garage shown on the survey attached hereto as Exhibit B; and WHEREAS, the Applicants intend to construct a new principal structure on the Subject Property; and WHEREAS,the Applicants are aware that according to Orono Municipal Zoning Code Section 78-1368, only one principal structure is permitted per lot; and WHEREAS, the Applicants are aware that according to Orono Municipal Zoning Code Section 78-1435, once the new principal structure is constructed the existing home and existing detached garage will be located nearer to the front lot line than the principal structure, requiring variances; and WHEREAS, the Applicants intend to, upon completion of the new principal structure, immediately apply for a conditional use permit and/or variances to allow the existing structures to remain on the property in a location closer to the front lot line than the new principal structure. WHEREAS,the City intends to allow the existing home and accessory structure(s) to remain on the Subject Property during construction of the new principal residence structure with the expectation that said existing home and accessory structure(s) will become conforming with the approval of a guest house conditional use permit and/or variance to be closer to the front lot line than the new principal structure as soon as construction of the new principal residence is completed. 1 NOW, THEREFORE, THE PARTIES TO THIS AGREEMENT AGREE TO THE FOLLOWING: 1. Applicants may retain the existing home and the existing accessory structure, subject to the following conditions: A) Applicants agree to apply for a land use application pertaining to the existing home and existing detached garage within 60 days of issuance of a building permit for the new principal structure;to begin construction on the new residence within 120 days of the issuance of a building permit; and to complete all exterior work within 1 year of building permit issuance and interior work within 2 years of building permit issuance. B) In the event that any activity described in item A has not been accomplished within the defined timeframe or the land use application(s) is denied, the Applicants shall remove the existing home and existing detached garage at the Applicants' expense, or the Applicants shall apply for an extension of this Agreement. C) If one of the item A events occurs and the Applicants fail to perform their removal obligations per item B, the Applicants hereby agree as follows: 1. The City may enter upon the property and remove the existing home and accessory building(s). 2. The City may assess the costs of removal to the property. 3. This Agreement shall be binding upon current and future owners of Subject Property, and shall be filed within the chain of title of the Subject Property. 4. Fee owner(s)of the Subject Property, if not the Applicants, consent to the execution of this Agreement and to its terms, as shown by their signature(s)upon this document. 5. Applicants shall indemnify and hold harmless the City, the City Council, and the agents and employees of the City from and against all claims, damages, losses or expenses, including attorney fees,which the City, City Council and agents and employees of the City may suffer or for which it may be held liable, arising out of or resulting from the assertion against them of any claims, debts or obligations in consequence of the performance of the terms of this agreement. 2 CITY OF ORONO: By: Its Mayor By: Its City Clerk ACKNOWLEDGEMENT STATE OF MINNESOTA ) ) ss. COUNTY OF HENNEPIN ) The foregoing instrument was acknowledged before me this day of , 20 , by and , the and of the City of Orono on behalf of the municipal corporation. Notary Public 3 APPLICANT(S): By: By: ACKNOWLEDGEMENT (APPLICANTS) STATE OF MINNESOTA ) ) ss. COUNTY OF HENNEPIN ) The foregoing instrument was acknowledged before me this day of , 20 , by and (husband and wife)as their free act and deed/on behalf of the corporation. Notary Public FEE OWNER(S): By: By: ACKNOWLEDGEMENT(FEE OWNERS) STATE OF MINNESOTA ) ) ss. COUNTY OF HENNEPIN ) The foregoing instrument was acknowledged before me this day of , 20 , by and (husband and wife)as their free act and deed/on behalf of the corporation. Notary Public 4