March 20, 2015
Scott & Michelle Miller
85 Old Crystal Bay Road S
Long Lake, MN 55356
RE: Open Permit Numbers 2011-01360 &2012-01221
In the process of closing out completed permit project files, I note that we have not completed
the final inspections or received an as-built survey for driveway, garden and planting areas.
Please note, the City continues to hold an escrow of $2,700 in conjunction with the above
projects. Once the weather permits, please have an as-built survey prepared by a registered
land surveyor showing the improvements and submit to us. Your escrow can be refunded once
we are able to determine the property conforms to the approved permit plans, wetland buffer
plantings, approved grading plan, etc. Please see attached City Code Section 86-68 regarding
survey requirements.
Please contact me at 952-249-4620 or at cmattson@ci.orono.mn.us if you have any questions.
Sincerely,
CITY OF ORONO
Christine Mattson
Planning Assistant
Attachment
Qrono, MN Code of Ordinances Page 1 of 1
Sec. 86-68. -Permit application; information required.
(a) The application for a construction permit shall include such information as may be required by the
city,which may vary between types of construction projects.
(b) Surveys required:
(1) Initial survey. Any building or general permit application for construction of a new structure or
expansion of an existing structure shall be accompanied by a certificate of survey prepared by
a Minnesota Registered Land Surveyor unless the building official determines the construction
project is exempt from this section. The certificate of survey shall conform to the standards on
file in the office of the building official.
(2) Foundation survey.A foundation survey shall be submitted to the city for review and approval,
unless exempted by the building official, upon completion of the foundation work for all
buildings and all additions to buildings.The foundation survey, prepared by a Minnesota
Registered Land Surveyor, shall certify the lot dimensions;front, side, rear, lakeshore, and
wetland setbacks; and foundation elevation.A foundation survey must be submitted before
proceeding with framing or further construction. In lieu of a survey a letter prepared by a
Minnesota Registered Land Surveyor containing the same information as a foundation survey
may be submitted.
(3) As-built survey. An as-built survey, prepared by a Minnesota Registered Land Surveyor, shall be
submitted to the city for review and approval upon the completion of all buildings and all
additions to buildings, unless exempted by the building official.The as-built survey shall certify
the final topography of the site;verify drainage patterns;and provide hardcover calculations
for lots in the Shoreland Overlay District.An as-built survey must be approved before the
issuance of a certificate of occupancy. In the event that weather or other conditions prevent
the completion of an as-built survey at the time the Certificate of Occupancy is requested,
applicant shall provide a sufficient financial guarantee and establish an escrow agreement to
ensure completion of the as-built survey.
(Code 1984, § 12.02; Ord. No.49 3rd series, § 1, 9-8-2008)