PERMIT
Pursuant to Minnesota Statutes Chapter 103D, and on the basis of statements and
information contained in the permit application, correspondence, plans, maps, and
all other supporting data submitted by the applicant, all of which are made a
part hereof by reference, PERMISSION IS HEREBY GRANTED to the applicant named
below for use and development of land in the Minnehaha Creek Watershed District.
Issued to: Orono Independent School Permit No. 94-59
District No. 278
Location: City of Orono, T118, R23, Sec. 28, SE 1/4
Purpose: Stormwater management plan and stream crossing involving
construction of road and two ball fields.
Date of Issuance: Date of Expiration:
April 14, 1994 April 14, 1995
By Order of the Board of Managers
Ellen B. Sones
District Administrator
This permit is not transferable, and is valid to the date of expiration. No
activity is authorized beyond the expiration date. If the permittee requires
more time to complete the project, and application for renewal of the permit is
required.
The applicant is responsible for compliance with all District rules and for the
actions of their representatives, contractors, and employees.
(Statement concerning fees for inspections, violations, etc. on back of permit. )
R
Inspection/Analysis/Monitoring Fees
A site inspection and monitoring by District staff will be
performed where the activity involves:
• a commercial/ industrial/multi-family
residential development.
• a single family residential development
greater than 5 acres or of any size if within
the Minnehaha Creek subwatershed.
• any alteration of a floodplain or wetland.
• dredging within the beds, banks or shores of
any protected water or wetland.
• a violation.
• any project which in the judgement of District
staff should be inspected due to project
location, scope, or construction techniques.
In these cases, the applicant shall pay to the District a fee
equal to the actual costs of field inspection of the work,
including investigation of the area affected by the work, analysis
of the work, and any subsequent monitoring of the work, which in
the case of a violation shall be at least $35.
Standard Fee Schedule (hourly rate) *
District Engineer: $115
District Counsel: 125
District Coordinator: 40
*As of March 1, 1993, subject to change