Loading...
HomeMy WebLinkAbout2006-P10508 - mechanical PERMIT CITY OF ORONO 2750 Kelley Parkway - PO Box 66 Permit Number: P10508 Crystal Bay, Minnesota 55323 Permit Type: Mechanical Permits (952) 249-4600 Date Issued: 11/15/2006 SITE ADDRESS: 795 Old Crystal Bay Rd N Unit# Long Lake,MN 55356 PID: 28-118-23-34-0003 DESCRIPTION: Proposed Use: Institutional-Schools Permit Class: General Permit Type: Mechanical Permits Permit Sub-type(s): Mechanical Undefined DETAILS: Approved per resolution#: Separate permits required: NOTICES/REMARKS: Keyed in under PID 28-118-23-34-0003 FEE SUMMARY: Permit Fee: $ 437.50 Valuation: $ 35,000.00 State Surcharge Fee: $ 17.50 TOTAL FEE: $ 455.00 APPLICANT: Rink Tec International,Inc. OWNER: Orono School Dist No.278 310 E County Rd.D 795 Old Crystal Bay Rd N Little Canada,MN 55117 Long Lake MN 55356 THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE THE REAL IMPROVEMENTS SPECIFIED AND AGREES TO DO ALL WORK IN STRICT COMPLIANCE WITH ALL CITY OF ORONO ORDINANCES AND STATE OF MINNESOTA BUILDING CODE REQUIREMENTS. � r _40011.411.0e1111111.9r7_ Cjf ! APP AT S'+ ISSUED BY SIGN TURE Copies: 1-File(Signatures Required), 1-Applicant, 1-Monthly Reports, 1-Assessing,(If Septic, 1-Septic) Page 1 C toe // 2-a6 ^y FOR CITY USE ONLY ,,,,c44--\ City of Orono P.O.Box 66 Date Received: I O 12-� (,Permit# 41 co-. oa , G'�I 2750 Kelley Parkway /I U0 ': '"4, Crystal Bay,MN 55323 Approved By: ,P, -- Amount S: 7A55 (952)249-4600 /0.3/-x° _:l,- CITY OF ORONO—MECHANICAL PERMIT (All Commercial permits must be approved by the Building Official or Inspector and/or Fire Marshall) GENERAL INFORMATION 1. You may apply for mechanical permits by mail or in person at the City offices. Applications will be reviewed and a permit will be issued within two working days. 2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT VALID UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS POSTED ON THE JOB SITE. 3. Mechanical Designs—Complete calculations,details and specifications are required for each heating,ventilation,humidification-dehumidification,and air conditioning installation including heat loss/heat gain calculation,design temperatures,equipment ratings and identification as to type,manufacturer and model. Data shall be presented on form provided. 4. When any new construction or remodeling is involved,a separate building permit must be obtained. 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code requirements. 6. All work must be inspected(rough-in and final). Call(952)249-4600. (24-48 hour notice required) 7. House Heating Test Record must be submitted before final. TYPE OF PERMIT (Check All That Apply) ❑ Residential 0 Commercial(Approval Required) ❑New ❑Additional 0 Repairs 0 Replace Job Site/Owner Information: Site Address: Orono Ice Arena {P Z D-4- , 8- 11S--. 3- 3(4 -OcO3 1) 1025 Old Crystal BayRd - %h Owner: �"r' "' S`4"/ ms's '',i c Mailing Address: ry City: Long Lake . Zip: 55356 74 (952)449-6090 s�O� Home Phone: Alternate Phone: Contractor Information: Rink Tec International,Inc Jennifer Bintner Contractor: Contact Person: K 3 Address: 310E County Rd D State Bond#: GRMN-21441A Little Canada 55117 08/18/07 City: Zip: Expiration Date: Phone: (651)481-I190 Alternate Phone: (612)282-6485 ❑ 08/03/07 Insurance—Current: 1 MECHANICAL.SYSTEMS BENG INSTALLED P.47 um, o► 1 Ft c c.. c J`�S 7'e iy1 Quantity: Make: I e / C C / S ,/,./ /75 L/Yt / Model: a �'7 G h� / /S ti 1 ' .1— 40,-7 / l Fuel: Flue Size: SPG // ‘c e c( jam'�f Input BTUs: Output BTUs: v Y4, I 19 CFM: ,&C 1A-or/ tr-1,-7--, / / i COOLING SYSTEMS Quantity: Make: Model: Tons: H.Power FIREPLACES ❑ Gas Factory Fireplace ❑ Wood Burning Fireplace ❑ Wood Stove ❑ Wood Stove With Flue Brand Name: Model No.: VENTILATION ❑ No. Kitchen Exhaust duct recirculating cfm ❑ No. Bath Exhaust(must have duct outside) cfm ❑ No. Other Fans: Locations cfm FUEL STORAGE(MUST BE APPROVED BY FIRE MARSHALL) ❑ Installation 0 Removal Fuel Oil: gallons ❑ Underground 0 Inside 0 Outside LP Gas: gallons Other: GAS LINE ONLY ❑ Outdoor Grill 0 Other I List What&Where: 2 xo M ,, 3 i Mh .. , �A c ,z of 1 0 Yes,this section applies The replacement of a Residential fixture or appliance that meets all three of the following requirements: 1. Does not require modification to electrical or gas service. 2. Has a total cost of$500.00 or less;excluding the cost of the fixture or appliance:and 3. Is improved,installed or replaced by the homeowner or licensed contractor. Skip next section,if this applies; Cost of Permit $ 15.00 State Surcharge $ .50 Mail-In Fee(If Applicable) $ 1.50 Total Permit Fee $ PERMIT FEE CALCULATI0/4(S)—JOBS OVER S$00.00 "j If above does not apply;follow guidelines below: 1. CONTRACT PRICE *is 1.25%of contract price with a(Minimum Fee of$35.00) 35,000.00 x.0125$ 437.50 (contract price) (minimum$35.00) 2. STATE SURCHARGE **Add the State Bldg Code Div.Surcharge(Minimum Fee of$.50) 35,000.00 x.0005 $ 17.50 (contract price) (minimum$ .50) 3. POSTAGE&HANDLING(Only on Mail-In Applications) $ 1.50 455.00 4. TOTAL PERMIT FEE(Add Lines 1-3 Above) $ • * CONTRACT PRICE or JOB COST means the actual or estimated dollar amount charged for the permitted work including materials,labor,profit,and other fixed costs. It is the amount to be charged to the customer for the work done. If any material, equipment, labor or installations are furnished by the owner,tenant or any other party,the reasonable market value of such items must be added to the estimated cost or contract price for permit fee purposes. In the event that there is a dispute on the amount of the job cost, the City may request the submission of a signed copy of the actual contract. • **The STATE SURCHARGE is.0005 of the Building Department at(952)249-4600 for the price. IsdECHANJCAL PERMIT APPL/CATIOI4 AGREEMENT 1 The undersigned hereby applies to the City for issuance of a Mechanical Permit, agrees to do all work in strict accordance with the ordinances of the City and the regulations of the State of Minnesota, and certifies that all statements made on this pplication are complete, true and correct. X Applicant's Signature: Date: /0/,. 6 /e, ‘ Resat Fon 3 . . . . ORONO BRR Technologies, Inc. • 4915 Arendell St. #313 Morehead City, NC 28557 TECHNiliiOLOGIES Ph: 252-727-0994 Fax: 252-727-0996 Engineering Data Project: Orono Ice Arena, Long Lake, MN BRR Technologies, Inc. Job #GZ1144 Date: August 22, 2006 All contractors and suppliers are asked to study these drawings and follow them in the installation of this project. If errors are noted, or revisions are recommended, please contact Tom Backman at BRR Technologies, Inc. It is our intent to execute this project with a focus on DO IT RIGHT THE FIRST TIME. We intend to install this system with ZERO DEFECTS in order to deliver an HONEST VALUE to our customer. 04"-- CITY OF ORONO BUILDING PE: I% IT LAN REVIEW INSPECTOR DATE/o-3 i•ole-----F;;i`,ii T NO. 0 APPROVED; .::�L:,: , L,1R APPRovf_:D`‘,ii N CC •"_cT ,;^AS NOTED ..a4(i0 dag0 `1 '..' I. .:::''.:f- !{:I:4 zr,��ing Cada. ,a i r: i acsth au i� _; ,..,,i PL AN$ TON$ITE ATeALL.TIMES (nuc " Seoc l si 6e A Lis TED *" "T-c-----5re- D�c,9� — P�.J1,2a. C.A.s r t' q.s.r .a — ink,"b it - 1 01/4rS TA-c.(. (1-0-,v 4& -1-E1? is o F 1-1-f eI K L 15 T 1n _ piLe ,/).-e seRwk1�_ Is,..„0S Roo ux ,,,,a 6.(u ) UNI I -- 0 0 C /fl..)5 r N° r a6k,at_ Se" " ki24.a. ((-,,i,2 r BRR NO GIES BRR Technologies Dehumidification Schedule Project: GZ1144,long Lake,MN / Orono Ice Arena Revision Date: 8/22/2006 Pump Data 460/3/60 Flow Feet Description Qty. Fluid Size Amps GPM Head Supplied By Installed By Cold Coil Pump 1 35%Ethylene Glycol 5 HP estimated 150 80 ft.hd. Rink-Tec Rink-Tec Suction&Discharge Gages 2 35%Ethylene Glycol 2"to 4"dial Rink-Tec Rink-Tec Pump Notes:Mount cold coil pump intake pipes on supply side of rink floor pump. Mount return side of cold coils 12"to 20"down stream of the intake pipes that feed the cold coil pump. Piping,Valve,and Component Data 120/1/60 Flow Pressure Description Qty. Fluid Size Amps Drop Supplied By Installed By Sporlan Solenoid Valve with Coil 2 R22 ME42 x 2 1/8" 0.2 600 mbh 4 psig BRR Technologies Rink-Tec _ Parker A82BL with Coil 2 R22 2 5/8"Conn x 2"port 0.2 35 tons 5 psig BRR Technologies Rink-Tec Hot Gas Check Valve 4 R22 2"port,or larger N/A 600 mbh 1 psig Rink-Tec Rink-Tec Triple Duty Valves to be mounted on each pump discharge. Bell&Gosset Size to pump Triple Duty Valve 2 35%EG connections. 150 gpm 4 ft.hd. Rink-Tec Rink-Tec All shut off valves All Rink-Tec Rink-Tec All Piping&Insulation All 1"thick on cold piping Rink-Tec Rink-Tec All Fluids All R22 and 35%EG Fluids need to be added to system Rink-Tec Rink-Tec All conensation Drains All All traps to be built down 6",then up 2",for a 4"stem height.Trap All drain Connectioi Rink-Tec Rink-Tec Note: All piping that is inside the arena is to be inulated and is to have White PVC cover jackets over the insulation. Rink-Tec Rink-Tec Subcooler Data 120/1/60 Pressure Description Qty. Fluid Size Amps Drop Supplied By Installed By Sporlan 3 Way Solenoid Valve &Coil 2 R22 16D17C-2"Port 2 psig BRR Technologies Rink-Tec _ 3 Way Solenoid Valve 2 Hot Gas Pilot Line Suction Pilot Line 2 psig Rink-Tec Rink-Tec 3 Way Solenoid Valve 2 Wiring _ Solenoid Coil Wiring 0.5 2 psig Rink-Tec Rink-Tec Air Handler Data • Air Flow Motor MCA MOPD . Description SCFM Location Size ESP 460/3/60 460/3/60 Supplied By Installed By DHU#1 Heatcraft AHU 20,000 Indoor 10 HP 1.75"w.g. 16.5 amps 30 BRR Technologies Rink-Tec DHU#1 Electrical Indoor 10 HP 1.75"w.q. 16.5 amps 30 Rink-Tec Rink-Tec DHU#1 Rigging _ Indoor Crane Pick Rink-Tec Rink-Tec DHU#1 Heatcraft AHU Paint Air Handler to Match the building wall paint. Rink-Tec Rink-Tec Ductwork Data Description Qty. Manufacturer Model Number Notes Supplied By Installed By Sheet Metal Ductwork All Supply=36"round,Return=1000 sfp Extreme Heating and Cooling Extreme Heating and Cooling Duct Sox Special Part# Duct,needs 3"holes every 2 ft.,blowing at an angle toward the ceiling in order to"wash"over the rin Extreme Heating and Cooling Extreme Heating and Cooling Fabric Dctwork 200 ft @ 36" Duct Sox or approved equal Includes hanging wire Extreme Heating and Cooling Extreme Heating and Cooling Motorized Damper Outdoor Air Minimum outdoor air=0 scfm Maximum outdoor air=3,500 scfm Extreme Heating and Cooling Extreme Heating and Cooling Damper Motors 1 Belimo NF24SR-modulating 0/A Damper Motor EMC Controls Extreme Heating and Cooling Manual Balancing Dampers 4 One on each Supply and One on each Return Rink A and Rink B Extreme Heating and Cooling Extreme Heating and Cooling ElectricaL Data Control Power Description Qty. Voltage Voltage Supplied By Installed By Solenoid Power Wiring 6 120/1/60 N/A Rink-Tec Rink-Tec Pump Power Wiring 1 120/1/60 480/3/60 Rink-Tec Rink-Tec All other power wiring 120/1/60 N/A Rink-Tec Rink-Tec Controller Data Input Inputs Output Description Qty. %RH Temp. Supplied By Installed By Electronic Controller 1 %RH Valves and pumps yes yes EMC Controls EMC Controls 1 CO2 Motorized Damper by Mech Contractor, EMC Controls EMC Controls Multiple temperature Valves and pumps EMC Controls EMC Controls Note:Cold Coil Sensors The Cold Coil Sensors MUST be mounted in the coil fins,2"up from the bottom of the coil. EMC Controls EMC Controls Other Features 1 Modem Interface EMC Controls EMC Controls Sensor Wiring Rink-Tec Rink-Tec Control wiring Rink-Tec Rink-Tec Start-up support 3 to 4 days Start-up support Rink-Tec,with asistance from BRR Rink-Tec Analog Phone Line 1 Dedicated to Dehumidifier Controls Owner to provide phone line Notes: The discharge line must have an inverted trap,or a check valve before the HR coil. The discharge check valve should be mounted on a horizontal run to avoid stacking liquid above the check vale. The heat reclaim coil will condense hot gas into liquid. The piping design must account for that. BRR TECHNOLOGIES VENT Top --♦ CW Coil DRAIN Triple Duty Valve From Rink To Chiller 12" TO 20" SPACE BETWEEN COLD COIL SUPPLY PIPES AND COLD COIL RETURN PIPES ALL PIPING INSIDE THE ARENA IS TO HAVE INSULATION AND WHITE PVC COVER JACKETS OVER THE INSULTATION. U.S. PATENT # TITLE: COLD COILS PIPING 6,321,551 PROJECT: LONG LAKE, MN / ORONO RINK 6,694,757 DATE: 8-22-06 6,935,131, OTHER US PATENTS PENDING BRR TECHNOLOGIES, INC. 4915 ARENDELL ST., MOREHEAD CITY, NC 28557 CANADIAN PATENT # 2,369,330 PH: 252-727-0994, FAX: 252-727-0996 DRAWN BY: TOM BACKMAN THIS DRAWING IS NOT TO SCALE. Ik 1 TECHNOLOGIES Sporlan 3 Way Valve with suction { and C-e.144,1 discharge R-22 ReceiveF, pilot lines eftairlif A \ U I / at)i .! i ---J m 0 0 To CHILLER IN BUILDING co \id '1A • INSULATE SUB-COOLED LIQUID LINES ALL PIPING INSIDE THE ARENA IS TO HAVE INSULATION AND WHITE PVC COVER JACKETS OVER THE INSULTATION. U.S. PATENT # TITLE: SUBCOOLING COIL PIPING 6,321,551 TYPICAL OF 2 CIRCUITS 6,694,757 PROJECT: LONG LAKE, MN / ORONO RINK 6,935,131, DATE: 8-22-06 OTHER US PATENTS PENDING BRR TECHNOLOGIES, INC. CANADIAN PATENT # 2,369,330 4915 ARENDELL ST., MOREHEAD CITY, NC 28557 PH: 252-727-0994, FAx: 252-727-0996 DRAWN BY: TOM BACKMAN THIS DRAWING IS NOT TO SCALE. PIT? TECHNOLOGIES REHEAT COIL I- SPORLAN CHECK ME 42 VALVE SOLENOID VALVE To CONDENSER MINIMUM INVERTED TRAP A82BL CHECK REGULATOR VALVE ELECTRIC WIDE OPEN ALL PIPING INSIDE THE ARENA IS FROM TO HAVE INSULATION AND WHITE COMPRESSORS PVC COVER JACKETS AFTER OVER THE INSULTATION. OIL SEPARATORS U.S. PATENT # TITLE: HOT GAS PIPING - TYPICAL OF 2 CIRCUITS 6,321,551 PROJECT: LONG LAKE, MN / ORONO RINK 6,694,757 6,935,131, DATE: 8-22-06 OTHER US PATENTS PENDING BRR TECHNOLOGIES, INC. CANADIAN PATENT # 2,369,330 4915 ARENDELL ST., MOREHEAD CITY, NC 28557 PH: 252-727-0994, FAX: 252-727-0996 DRAWN BY: TOM BACKMAN 1114-01 GIES • 4" MINIMUM STEM HEIGHT )v DOWN 6" 1 UP 2" DOWN 6 INCHES, UP 2 INCHES ON THE TRAP DESIGN ALL DRAIN PORTS ON THE AIR HANDLER MUST BE TRAPPED. ALL TRAPS MUST BE THE SAME DIAMETER AS THE DRAIN PORT. THE AIR HANDLER MAY NEED TO BE RAISED ABOVE THE SLAB TO ACCOMMODATE THE DRAIN TRAPS. U.S. PATENT # TITLE: CONDENSATION DRAIN TRAP 6,321,551 PROJECT: LONG LAKE, MN / ORONO RINK 6,694,757 6,935,131, DATE: 8-22-06 OTHER US PATENTS PENDING BRR TECHNOLOGIES, INC. CANADIAN PATENT # 2,369,330 4915 ARENDELL ST., MOREHEAD CITY, NC 28557 PH: 252-727-0994, FAx: 252-727-0996 DRAWN BY: TOM BACKMAN BRR OUTDOOR X 20 MOTORIZED AIR INTAKE TECHNOLOGIES THROUGH WINDOW OPENEING DUCTED BELOW BOTTOM OF RAISE CONDENSER 10 FEET CONDENSER. 20 SQUARE FOOT RETURN AIR INTAKE GRILL BELOW TOP OF CONDENSER DASHER BOARD GLASS L 40" RETURN AIR PLENUM FULL SIZE OF REAR COMPRESOR AIR HANDLER INTAKE ROOM FLANGE AHU MOUNT AHU ON BASE FRAME UP FROM FLOOR. PAINT AHU TO MATCH WALL COLORS. 200 FT. FABRIC DUCT 36" HOLES EVERY 2 FT. AIR TO BLOW UP AND OUT AT A 45° ANGLE TOWARD THE CEILING OVER THE ICE. MOUNT FABRIC SUPPLY DUCT HIGH AND ABOVE ABOVE THE BANNERS. 1---- U.S. PATENT # TITLE: DUCTWORK AND AIR HANDLER LAYOUT 6,321,551 PROJECT: LONG LAKE, MN / ORONO RINK 6,69/4,757 6,935,131, DATE: 8-22-06 OTHER US PATENTS PENDING BRR TECHNOLOGIES, INC. CANADIAN PATENT # 2,369,330 4915 ARENDELL ST., MOREHEAD CITY, NC 28557 PH: 252-727-0994, FAX: 252-727-0996 DRAWN BY: TOM BACKMAN 08/22/2006 08: 19 FAX 217 446 5265 HEATCRAFT MODEL HCL HEATCRAFT Fe frigpld:i D.'7 Pw li U:t. SIZE 26FC BOHN DISCHARGE #2, FAN SECTION 2" 1-27-1/4"--1 COIL COIL SECTION SECTION i ----, ----1 ----7 i i z / ,,‘ ii R C 0 `` i H1 0 w 1 ` E Q' E' L CO ` i Tv� O S W �� T 47 G .� c D Di c h u- O , 0 C '— .'. O ' IN 3„ , Lo: LP`, �1 u- // ,I 14" 18" iv II--- I II I ' a I HINGED, FAN SECTION 1-1/4"F.-.T Drain ACCESS DOOR (BOTH SIDES) . 44" ----yr/ 6" 22-114" / 44-5/8" 116-7/8" ► 115" 1" 43-7/8" –i— 27-1/4" –t- 43-718" T MI R.H. COIL FRONT CONN. LOC. it I ---►1 1.--- 2-1/2" L.H. MOTOR LOC. NOTES: Motor and coil connecton locations (R.H. or L.H.) determined when facing the front of the unit. HEATCRAFT REFRIGERATION HEATCRAFT inc. AIR HANDLER Danville Operation /Refrigeration Products Division _ SUBMITTAL DATA Phone: 800-537-7775 Ext. 6437 Fax: 217-446-5265 Project ORONO ARENA - LONG LAKE, MN Arch./Engr. Date 8-21-2006 to: TOM BACKMAN DATE: 8-21-2006 Customer B R R TECHNOLOGIES from: Bill Bays cc: GEORGE BAER MODEL HCL26FC QUANTITY (1) ONE TAG AHU-1-GZ1144 subject: AIR HANDLER QUOTE FAN DATA FAN DISCHARGE ARRANGEMENT ORONO ARENA - LONG LAKE, MN Total CFM 10000 Ext S. P.in W.G. 1.85 Draw Thru Arrangement 2 Fan Type: Total S. P. in W.G. 3.10 VERTICAL We are pleased to quote you on the items described below. ® Forward Curve B.H.P 7.9 E] Airfoil Fan RPM 856 MOTOR DATA DRIVE DATA UNIT SIZE HCL26FC Motor H.P. 10 Volts 460-3-60 Adjustable® Fixed❑ Left Right C.F.M. 10000 Full Load Amps 13.2 MCA 16.5 MFS 30 120%(Std.)® 150%❑ Hand Hand MOTOR OPEN 10 H.P. Motor RPM 1800 NOM, Drive Location: Type OPEN SINGLE SPEED(EPA EFF.) Left❑ Right❑ Fron DRIVE ADJUSTABLE COMB. MOTOR STARTER DEFINITE PURPOSE/N.E.M.A. 1 Rfor Motor Protection FILTER SECTION PRE-FILTER SECTION FINAL FILTER DATA ISOLATION INTERNAL SPRINGS Flat® Type 2" - 30%EFFICIENT Sq. Ft. 31.11 Type COOLING COIL 5/8" O.D. 12 ROW/4 FPI ETHYLENE Face Velocity 321.4 APD 0.14 Eff. Sq.Ft. SUB COOLER 2 ROW/ 12 FPI R22 'gyp 6Q 044 C t 1 "OM High Efficient❑ ( 4 ) 16x20x2 ( ) 20x25x2 Face Velocity APD COIL MODULE Bag ( ) 16x25x2 ( ) 12x24x2 ( ) 12x24x12 REHEAT COIL 1/2" O.D. 4 ROW/10 FPI R22 `' -‘A)C) Vic(. C\ U l7S ( 8 ) 20x20x2 (__- ) 24x24x2 ( ) 24x24x12 FILTER SECTION FLAT UNIT ACCESSORIES PREFILTER 2"- 30% EFF. Variable Inlet Vanes: ...❑ DOUBLE WALL ACCESS DOORS IN FAN & COIL SECTION External Vibration Isolators: RIS 0 Spring 0 COIL SECTION ACCESS DOOR D. WALL Floor Mounted 0 Suspended❑ INSULATION 2"- 1-1/2 lb. FIBERGLASS IN FAN & COIL SECTION Internal Spring Isolation(Fan&Motor): M-4— COILS J 4COILS PREHEAT COIL COOLING COIL SUB COOLER COIL REHEAT COIL Model -Size 5WM0412C 36 x 102 4CF1202C 37.5 x 102 4CF1004C 37.5 x 102 Rows/Fin Series 12 I 4 12 I 2 4 I 10 CFM Thru Coil 10000 10000 10000 L.. .4. N\ CTOR FAA Sq. Ft./Face Velocity 25.5 I 39Z2 26.6 / 376.5 26.6 / 376.5 Ent Air-°F(DB&WB) Lvg.Air-°F(DB&WB) ` ii - NK, CONNEL:CIOWSTotal BTUH Sensible BTUH _ - -- Evap.Temp./Ref.Type Water Temp. °F,EWT/LWT Air Press. Drop(in.water) 0.73 I 0.14 _ 0.24 I Fluid P.D. (Ft.water)I / COIL CONNECTION SIZE&LOCATION COILS- Std Construction- Cu. Tube, Alum Fins (Coil And motor hand determined when Additional Comments: Facing the front of the unit) 1) Minimum 14"Space Between Coil Fin Packs COOLING SINGLE CIRCUIT 2) Combination Fused Disconnect&Motor Starte Inlet (1) 2-1/2"M.P.T. in a N.E.M.A. 1 enclosure with Control Power Outlet (1) 2-1/2"M.P.T. COOLING Transformer 460 Primary-120 Volt secondary REHEAT SUB COOLER TWO CIRCUITS REHEAT 3) Insulation is 2"-1-1/2 lb.Density-Foil Faced Inlet (2) 2-1/8"O.D.S. REHEAT Fiberglass In lieu of standard 1"-3/4 lb.Fiberglass Outlet (2)2-1/8"O.D.S. 4) All Access Doors Double Wall Construction REHEAT R22 TWO CIRCUITS FRONT 5) Access Door Between Coils r Inlet (2)2-1/8"O.D.S. I 1 6) Gasketed&Sealed Panels Outlet (2) 2-1/8"O.D.S. UNIT WEIGHT = 3662 lbs. MODEL HCL HEATCRAFT .. Acf:itci..f:0PrdC: SIZE 26FC BOHN Nu_OD c0 �' N MOUNTING LOCATIONS C N g Fl w 1,. 1., 1., in a 1f 1 s O a) N - .4- 'it 1 C i \= q o `h — m - M if• w " t 0 0 o 0 co II) in c o COIL COIL 2"FLAT m p 0 c o FAN SECTION SECTION SECTION FILTER 118" . 3 SECTION 0 IS 0 °. 0 0 W co T ]Ji ILI • J in _Ltil 11- 0 u_ 10 g = O - 44" . 22-1/4" -*�- 44-5/8" g" -- m o 0 All mounting holes are 5/8" diameter. Em in "' z MOUNTING W Z ,� 1 :,. 2-W` DETAIL 0 "' :v:y M1:ii''+�:: re . ,_ 3" • 0 0 \ 1 11� . 0 0 0 0 3-7/8"-I AIR t N- i:o �'�RN. � N ui M —► .—! ..-. ..,...,- OVERALL t...... - cn ,� DIMENSIONS 120" 116-7/8" o