HomeMy WebLinkAbout2006-P10508 - mechanical PERMIT
CITY OF ORONO
2750 Kelley Parkway - PO Box 66 Permit Number: P10508
Crystal Bay, Minnesota 55323 Permit Type: Mechanical Permits
(952) 249-4600 Date Issued: 11/15/2006
SITE ADDRESS: 795 Old Crystal Bay Rd N Unit#
Long Lake,MN 55356
PID: 28-118-23-34-0003
DESCRIPTION:
Proposed Use: Institutional-Schools
Permit Class: General
Permit Type:
Mechanical Permits Permit Sub-type(s): Mechanical Undefined
DETAILS:
Approved per resolution#:
Separate permits required:
NOTICES/REMARKS:
Keyed in under PID 28-118-23-34-0003
FEE SUMMARY: Permit Fee: $ 437.50 Valuation: $ 35,000.00
State Surcharge Fee: $ 17.50
TOTAL FEE: $ 455.00
APPLICANT: Rink Tec International,Inc. OWNER: Orono School Dist No.278
310 E County Rd.D 795 Old Crystal Bay Rd N
Little Canada,MN 55117 Long Lake MN 55356
THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE THE REAL IMPROVEMENTS SPECIFIED
AND AGREES TO DO ALL WORK IN STRICT COMPLIANCE WITH ALL CITY OF ORONO ORDINANCES AND STATE OF
MINNESOTA BUILDING CODE REQUIREMENTS.
� r
_40011.411.0e1111111.9r7_
Cjf !
APP AT S'+ ISSUED BY SIGN TURE
Copies: 1-File(Signatures Required), 1-Applicant, 1-Monthly Reports, 1-Assessing,(If Septic, 1-Septic) Page 1
C toe // 2-a6
^y
FOR CITY USE ONLY
,,,,c44--\ City of Orono
P.O.Box 66 Date Received: I O 12-� (,Permit# 41 co-. oa
, G'�I 2750 Kelley Parkway /I U0
': '"4, Crystal Bay,MN 55323 Approved By: ,P, -- Amount S: 7A55
(952)249-4600 /0.3/-x°
_:l,-
CITY OF ORONO—MECHANICAL PERMIT
(All Commercial permits must be approved by the Building Official or Inspector and/or Fire Marshall)
GENERAL INFORMATION
1. You may apply for mechanical permits by mail or in person at the City offices. Applications will
be reviewed and a permit will be issued within two working days.
2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT
VALID UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE
PERMIT CARD IS POSTED ON THE JOB SITE.
3. Mechanical Designs—Complete calculations,details and specifications are required for each
heating,ventilation,humidification-dehumidification,and air conditioning installation including
heat loss/heat gain calculation,design temperatures,equipment ratings and identification as to
type,manufacturer and model. Data shall be presented on form provided.
4. When any new construction or remodeling is involved,a separate building permit must be
obtained.
5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code
requirements.
6. All work must be inspected(rough-in and final). Call(952)249-4600.
(24-48 hour notice required)
7. House Heating Test Record must be submitted before final.
TYPE OF PERMIT
(Check All That Apply)
❑ Residential 0 Commercial(Approval Required)
❑New ❑Additional 0 Repairs 0 Replace
Job Site/Owner Information:
Site Address: Orono Ice Arena {P Z D-4- , 8- 11S--. 3- 3(4 -OcO3
1)
1025 Old Crystal BayRd - %h
Owner: �"r' "' S`4"/ ms's '',i c Mailing Address: ry
City: Long Lake . Zip: 55356 74
(952)449-6090 s�O�
Home Phone: Alternate Phone:
Contractor Information:
Rink Tec International,Inc Jennifer Bintner
Contractor: Contact Person: K 3
Address: 310E County Rd D State Bond#: GRMN-21441A
Little Canada 55117 08/18/07
City: Zip: Expiration Date:
Phone: (651)481-I190 Alternate Phone: (612)282-6485
❑ 08/03/07
Insurance—Current:
1
MECHANICAL.SYSTEMS BENG INSTALLED
P.47 um, o► 1 Ft c c.. c J`�S 7'e iy1
Quantity:
Make: I e / C C / S ,/,./ /75 L/Yt /
Model: a �'7 G h� / /S ti 1 ' .1— 40,-7 / l
Fuel:
Flue Size: SPG // ‘c e c( jam'�f
Input BTUs:
Output BTUs: v Y4,
I 19
CFM: ,&C 1A-or/ tr-1,-7--, / / i
COOLING SYSTEMS
Quantity:
Make:
Model:
Tons:
H.Power
FIREPLACES
❑ Gas Factory Fireplace
❑ Wood Burning Fireplace
❑ Wood Stove
❑ Wood Stove With Flue
Brand Name: Model No.:
VENTILATION
❑ No. Kitchen Exhaust duct recirculating cfm
❑ No. Bath Exhaust(must have duct outside) cfm
❑ No. Other Fans: Locations cfm
FUEL STORAGE(MUST BE APPROVED BY FIRE MARSHALL)
❑ Installation 0 Removal
Fuel Oil: gallons ❑ Underground 0 Inside 0 Outside
LP Gas: gallons
Other:
GAS LINE ONLY
❑ Outdoor Grill 0 Other I List What&Where:
2
xo
M ,, 3 i Mh .. , �A c ,z of 1
0 Yes,this section applies
The replacement of a Residential fixture or appliance that meets all three of the following requirements:
1. Does not require modification to electrical or gas service.
2. Has a total cost of$500.00 or less;excluding the cost of the fixture or appliance:and
3. Is improved,installed or replaced by the homeowner or licensed contractor.
Skip next section,if this applies; Cost of Permit $ 15.00
State Surcharge $ .50
Mail-In Fee(If Applicable) $ 1.50
Total Permit Fee $
PERMIT FEE CALCULATI0/4(S)—JOBS OVER S$00.00 "j
If above does not apply;follow guidelines below:
1. CONTRACT PRICE *is 1.25%of contract price with a(Minimum Fee of$35.00)
35,000.00 x.0125$ 437.50
(contract price) (minimum$35.00)
2. STATE SURCHARGE **Add the State Bldg Code Div.Surcharge(Minimum Fee of$.50)
35,000.00 x.0005 $ 17.50
(contract price) (minimum$ .50)
3. POSTAGE&HANDLING(Only on Mail-In Applications) $ 1.50
455.00
4. TOTAL PERMIT FEE(Add Lines 1-3 Above) $
• * CONTRACT PRICE or JOB COST means the actual or estimated dollar amount charged for the
permitted work including materials,labor,profit,and other fixed costs. It is the amount to be charged
to the customer for the work done. If any material, equipment, labor or installations are furnished by
the owner,tenant or any other party,the reasonable market value of such items must be added to the
estimated cost or contract price for permit fee purposes. In the event that there is a dispute on the
amount of the job cost, the City may request the submission of a signed copy of the actual contract.
• **The STATE SURCHARGE is.0005 of the Building Department at(952)249-4600 for the price.
IsdECHANJCAL PERMIT APPL/CATIOI4 AGREEMENT 1
The undersigned hereby applies to the City for issuance of a Mechanical Permit, agrees to do all
work in strict accordance with the ordinances of the City and the regulations of the State of
Minnesota, and certifies that all statements made on this pplication are complete, true and
correct.
X
Applicant's Signature: Date: /0/,. 6
/e, ‘
Resat Fon
3
. .
. .
ORONO
BRR Technologies, Inc.
• 4915 Arendell St. #313
Morehead City, NC 28557
TECHNiliiOLOGIES Ph: 252-727-0994 Fax: 252-727-0996
Engineering Data
Project: Orono Ice Arena, Long Lake, MN
BRR Technologies, Inc. Job #GZ1144
Date: August 22, 2006
All contractors and suppliers are asked to study these drawings and follow them in the
installation of this project. If errors are noted, or revisions are recommended, please
contact Tom Backman at BRR Technologies, Inc.
It is our intent to execute this project with a focus on DO IT RIGHT THE FIRST TIME.
We intend to install this system with ZERO DEFECTS in order to deliver an HONEST
VALUE to our customer.
04"--
CITY OF ORONO
BUILDING PE: I% IT LAN REVIEW
INSPECTOR
DATE/o-3 i•ole-----F;;i`,ii T NO.
0 APPROVED; .::�L:,: ,
L,1R APPRovf_:D`‘,ii N CC •"_cT ,;^AS NOTED
..a4(i0 dag0
`1 '..' I. .:::''.:f- !{:I:4 zr,��ing Cada.
,a i r: i acsth au i�
_; ,..,,i PL AN$ TON$ITE ATeALL.TIMES
(nuc " Seoc l si 6e A Lis TED *" "T-c-----5re- D�c,9�
— P�.J1,2a. C.A.s r t' q.s.r .a
— ink,"b it - 1 01/4rS TA-c.(. (1-0-,v 4& -1-E1? is o F 1-1-f eI K L 15 T 1n
_ piLe ,/).-e seRwk1�_ Is,..„0S Roo ux ,,,,a 6.(u ) UNI I
-- 0 0 C /fl..)5 r N° r a6k,at_ Se" " ki24.a. ((-,,i,2 r
BRR
NO
GIES
BRR Technologies Dehumidification Schedule
Project: GZ1144,long Lake,MN / Orono Ice Arena Revision Date: 8/22/2006
Pump Data
460/3/60 Flow Feet
Description Qty. Fluid Size Amps GPM Head Supplied By Installed By
Cold Coil Pump 1 35%Ethylene Glycol 5 HP estimated 150 80 ft.hd. Rink-Tec Rink-Tec
Suction&Discharge Gages 2 35%Ethylene Glycol 2"to 4"dial Rink-Tec Rink-Tec
Pump Notes:Mount cold coil pump intake pipes on supply side of rink floor pump. Mount return side of cold coils 12"to 20"down stream of the intake pipes that feed the cold coil pump.
Piping,Valve,and Component Data
120/1/60 Flow Pressure
Description Qty. Fluid Size Amps Drop Supplied By Installed By
Sporlan Solenoid Valve with Coil 2 R22 ME42 x 2 1/8" 0.2 600 mbh 4 psig BRR Technologies Rink-Tec _
Parker A82BL with Coil 2 R22 2 5/8"Conn x 2"port 0.2 35 tons 5 psig BRR Technologies Rink-Tec
Hot Gas Check Valve 4 R22 2"port,or larger N/A 600 mbh 1 psig Rink-Tec Rink-Tec
Triple Duty Valves to be
mounted on each pump
discharge.
Bell&Gosset Size to pump
Triple Duty Valve 2 35%EG connections.
150 gpm 4 ft.hd. Rink-Tec Rink-Tec
All shut off valves All Rink-Tec Rink-Tec
All Piping&Insulation All 1"thick on cold piping Rink-Tec Rink-Tec
All Fluids All R22 and 35%EG Fluids need to be added to system Rink-Tec Rink-Tec
All conensation Drains All All traps to be built down 6",then up 2",for a 4"stem height.Trap All drain Connectioi Rink-Tec Rink-Tec
Note: All piping that is inside the arena is to be inulated and is to have White PVC cover jackets over the insulation. Rink-Tec Rink-Tec
Subcooler Data
120/1/60 Pressure
Description Qty. Fluid Size Amps Drop Supplied By Installed By
Sporlan 3 Way Solenoid Valve
&Coil 2 R22 16D17C-2"Port 2 psig BRR Technologies Rink-Tec _
3 Way Solenoid Valve 2 Hot Gas Pilot Line Suction Pilot Line 2 psig Rink-Tec Rink-Tec
3 Way Solenoid Valve 2 Wiring _ Solenoid Coil Wiring 0.5 2 psig Rink-Tec Rink-Tec
Air Handler Data
•
Air Flow Motor MCA MOPD .
Description SCFM Location Size ESP 460/3/60 460/3/60 Supplied By Installed By
DHU#1 Heatcraft AHU 20,000 Indoor 10 HP 1.75"w.g. 16.5 amps 30 BRR Technologies Rink-Tec
DHU#1 Electrical Indoor 10 HP 1.75"w.q. 16.5 amps 30 Rink-Tec Rink-Tec
DHU#1 Rigging _ Indoor Crane Pick Rink-Tec Rink-Tec
DHU#1 Heatcraft AHU Paint Air Handler to Match the building wall paint. Rink-Tec Rink-Tec
Ductwork Data
Description Qty. Manufacturer Model Number Notes Supplied By Installed By
Sheet Metal Ductwork All Supply=36"round,Return=1000 sfp Extreme Heating and Cooling Extreme Heating and Cooling
Duct Sox Special Part# Duct,needs 3"holes every 2 ft.,blowing at an angle toward the ceiling in order to"wash"over the rin Extreme Heating and Cooling Extreme Heating and Cooling
Fabric Dctwork 200 ft @ 36" Duct Sox or approved equal Includes hanging wire Extreme Heating and Cooling Extreme Heating and Cooling
Motorized Damper Outdoor Air Minimum outdoor air=0 scfm Maximum outdoor air=3,500 scfm Extreme Heating and Cooling Extreme Heating and Cooling
Damper Motors 1 Belimo NF24SR-modulating 0/A Damper Motor EMC Controls Extreme Heating and Cooling
Manual Balancing Dampers 4 One on each Supply and One on each Return Rink A and Rink B Extreme Heating and Cooling Extreme Heating and Cooling
ElectricaL Data
Control Power
Description Qty. Voltage Voltage Supplied By Installed By
Solenoid Power Wiring 6 120/1/60 N/A Rink-Tec Rink-Tec
Pump Power Wiring 1 120/1/60 480/3/60 Rink-Tec Rink-Tec
All other power wiring 120/1/60 N/A Rink-Tec Rink-Tec
Controller Data
Input Inputs Output
Description Qty. %RH Temp. Supplied By Installed By
Electronic Controller 1 %RH Valves and pumps yes yes EMC Controls EMC Controls
1 CO2 Motorized Damper by Mech Contractor, EMC Controls EMC Controls
Multiple temperature Valves and pumps EMC Controls EMC Controls
Note:Cold Coil Sensors The Cold Coil Sensors MUST be mounted in the coil fins,2"up from the bottom of the coil. EMC Controls EMC Controls
Other Features 1 Modem Interface EMC Controls EMC Controls
Sensor Wiring
Rink-Tec Rink-Tec
Control wiring Rink-Tec Rink-Tec
Start-up support 3 to 4 days Start-up support Rink-Tec,with asistance from BRR Rink-Tec
Analog Phone Line 1 Dedicated to Dehumidifier Controls Owner to provide phone line
Notes:
The discharge line must have an inverted trap,or a check valve before the HR coil.
The discharge check valve should be mounted on a horizontal run to avoid stacking liquid above the check vale.
The heat reclaim coil will condense hot gas into liquid. The piping design must account for that.
BRR
TECHNOLOGIES
VENT
Top --♦
CW Coil
DRAIN
Triple
Duty
Valve
From Rink
To Chiller
12" TO 20"
SPACE
BETWEEN
COLD COIL
SUPPLY PIPES
AND
COLD COIL
RETURN PIPES
ALL PIPING INSIDE THE ARENA IS
TO HAVE INSULATION AND WHITE
PVC COVER JACKETS
OVER THE INSULTATION.
U.S. PATENT # TITLE: COLD COILS PIPING
6,321,551 PROJECT: LONG LAKE, MN / ORONO RINK
6,694,757 DATE: 8-22-06
6,935,131,
OTHER US PATENTS PENDING BRR TECHNOLOGIES, INC.
4915 ARENDELL ST., MOREHEAD CITY, NC 28557
CANADIAN PATENT # 2,369,330 PH: 252-727-0994, FAX: 252-727-0996
DRAWN BY: TOM BACKMAN
THIS DRAWING IS NOT TO SCALE.
Ik 1
TECHNOLOGIES
Sporlan
3 Way Valve
with suction {
and C-e.144,1
discharge R-22 ReceiveF,
pilot
lines
eftairlif
A \
U
I /
at)i
.! i ---J
m
0
0
To CHILLER IN BUILDING
co \id '1A •
INSULATE SUB-COOLED LIQUID LINES
ALL PIPING INSIDE THE ARENA IS
TO HAVE INSULATION AND WHITE
PVC COVER JACKETS
OVER THE INSULTATION.
U.S. PATENT # TITLE: SUBCOOLING COIL PIPING
6,321,551 TYPICAL OF 2 CIRCUITS
6,694,757 PROJECT: LONG LAKE, MN / ORONO RINK
6,935,131, DATE: 8-22-06
OTHER US PATENTS PENDING
BRR TECHNOLOGIES, INC.
CANADIAN PATENT # 2,369,330
4915 ARENDELL ST., MOREHEAD CITY, NC 28557
PH: 252-727-0994, FAx: 252-727-0996
DRAWN BY: TOM BACKMAN
THIS DRAWING IS NOT TO SCALE.
PIT?
TECHNOLOGIES
REHEAT
COIL
I- SPORLAN
CHECK ME 42
VALVE SOLENOID
VALVE
To
CONDENSER MINIMUM
INVERTED
TRAP
A82BL CHECK
REGULATOR VALVE
ELECTRIC
WIDE OPEN
ALL PIPING INSIDE THE ARENA IS FROM
TO HAVE INSULATION AND WHITE COMPRESSORS
PVC COVER JACKETS AFTER
OVER THE INSULTATION. OIL
SEPARATORS
U.S. PATENT # TITLE: HOT GAS PIPING - TYPICAL OF 2 CIRCUITS
6,321,551 PROJECT: LONG LAKE, MN / ORONO RINK
6,694,757
6,935,131, DATE: 8-22-06
OTHER US PATENTS PENDING
BRR TECHNOLOGIES, INC.
CANADIAN PATENT # 2,369,330 4915 ARENDELL ST., MOREHEAD CITY, NC 28557
PH: 252-727-0994, FAX: 252-727-0996
DRAWN BY: TOM BACKMAN
1114-01
GIES
•
4" MINIMUM
STEM
HEIGHT
)v
DOWN 6"
1
UP 2"
DOWN 6 INCHES, UP 2 INCHES ON THE TRAP DESIGN
ALL DRAIN PORTS ON THE AIR HANDLER MUST BE TRAPPED.
ALL TRAPS MUST BE THE SAME DIAMETER AS THE DRAIN PORT.
THE AIR HANDLER MAY NEED TO BE RAISED ABOVE THE SLAB TO ACCOMMODATE THE DRAIN TRAPS.
U.S. PATENT # TITLE: CONDENSATION DRAIN TRAP
6,321,551 PROJECT: LONG LAKE, MN / ORONO RINK
6,694,757
6,935,131, DATE: 8-22-06
OTHER US PATENTS PENDING
BRR TECHNOLOGIES, INC.
CANADIAN PATENT # 2,369,330
4915 ARENDELL ST., MOREHEAD CITY, NC 28557
PH: 252-727-0994, FAx: 252-727-0996
DRAWN BY: TOM BACKMAN
BRR OUTDOOR X 20 MOTORIZED
AIR INTAKE
TECHNOLOGIES THROUGH WINDOW OPENEING
DUCTED BELOW BOTTOM OF
RAISE CONDENSER 10 FEET CONDENSER.
20 SQUARE FOOT
RETURN AIR INTAKE
GRILL BELOW TOP OF
CONDENSER DASHER BOARD GLASS
L
40" RETURN AIR PLENUM
FULL SIZE OF REAR COMPRESOR
AIR HANDLER INTAKE ROOM
FLANGE
AHU
MOUNT AHU ON BASE FRAME UP FROM FLOOR.
PAINT AHU TO MATCH WALL COLORS.
200 FT. FABRIC DUCT
36" HOLES EVERY 2 FT.
AIR TO BLOW UP AND OUT AT
A 45° ANGLE TOWARD THE
CEILING OVER THE ICE.
MOUNT FABRIC SUPPLY DUCT
HIGH AND ABOVE ABOVE THE BANNERS.
1----
U.S. PATENT # TITLE: DUCTWORK AND AIR HANDLER LAYOUT
6,321,551 PROJECT: LONG LAKE, MN / ORONO RINK
6,69/4,757
6,935,131, DATE: 8-22-06
OTHER US PATENTS PENDING
BRR TECHNOLOGIES, INC.
CANADIAN PATENT # 2,369,330 4915 ARENDELL ST., MOREHEAD CITY, NC 28557
PH: 252-727-0994, FAX: 252-727-0996
DRAWN BY: TOM BACKMAN
08/22/2006 08: 19 FAX 217 446 5265 HEATCRAFT
MODEL HCL HEATCRAFT
Fe frigpld:i D.'7 Pw li U:t.
SIZE 26FC
BOHN
DISCHARGE #2,
FAN SECTION
2" 1-27-1/4"--1 COIL COIL
SECTION SECTION
i ----, ----1 ----7
i
i z
/ ,,‘ ii R C 0
`` i H1 0 w
1 ` E Q' E' L CO
` i Tv� O S W
�� T
47 G .�
c D Di c h u-
O , 0 C '—
.'. O
' IN
3„ , Lo: LP`, �1 u-
// ,I 14" 18" iv
II--- I
II I ' a
I HINGED, FAN SECTION 1-1/4"F.-.T Drain
ACCESS DOOR (BOTH SIDES)
. 44" ----yr/ 6"
22-114" / 44-5/8"
116-7/8" ►
115"
1" 43-7/8" –i— 27-1/4" –t- 43-718"
T MI
R.H. COIL
FRONT CONN. LOC.
it
I
---►1 1.--- 2-1/2"
L.H. MOTOR LOC.
NOTES:
Motor and coil connecton locations (R.H. or L.H.) determined when
facing the front of the unit.
HEATCRAFT REFRIGERATION HEATCRAFT inc. AIR HANDLER
Danville Operation /Refrigeration Products Division _ SUBMITTAL DATA
Phone: 800-537-7775 Ext. 6437
Fax: 217-446-5265 Project ORONO ARENA - LONG LAKE, MN
Arch./Engr. Date 8-21-2006
to: TOM BACKMAN DATE: 8-21-2006 Customer B R R TECHNOLOGIES
from: Bill Bays cc: GEORGE BAER MODEL HCL26FC QUANTITY (1) ONE TAG AHU-1-GZ1144
subject: AIR HANDLER QUOTE FAN DATA FAN DISCHARGE ARRANGEMENT
ORONO ARENA - LONG LAKE, MN Total CFM 10000 Ext S. P.in W.G. 1.85 Draw Thru Arrangement 2
Fan Type: Total S. P. in W.G. 3.10 VERTICAL
We are pleased to quote you on the items described below. ® Forward Curve B.H.P 7.9
E] Airfoil Fan RPM 856
MOTOR DATA DRIVE DATA
UNIT SIZE HCL26FC
Motor H.P. 10 Volts 460-3-60 Adjustable® Fixed❑ Left Right
C.F.M. 10000 Full Load Amps 13.2 MCA 16.5 MFS 30 120%(Std.)® 150%❑ Hand Hand
MOTOR OPEN 10 H.P.
Motor RPM 1800 NOM, Drive Location:
Type OPEN SINGLE SPEED(EPA EFF.) Left❑ Right❑ Fron
DRIVE ADJUSTABLE
COMB. MOTOR STARTER DEFINITE PURPOSE/N.E.M.A. 1 Rfor Motor Protection FILTER SECTION PRE-FILTER SECTION FINAL FILTER DATA
ISOLATION INTERNAL SPRINGS Flat® Type 2" - 30%EFFICIENT Sq. Ft. 31.11 Type
COOLING COIL 5/8" O.D. 12 ROW/4 FPI ETHYLENE Face Velocity 321.4 APD 0.14 Eff. Sq.Ft.
SUB COOLER 2 ROW/ 12 FPI R22 'gyp 6Q 044 C t 1 "OM High Efficient❑ ( 4 ) 16x20x2 ( ) 20x25x2 Face Velocity APD
COIL MODULE Bag ( ) 16x25x2 ( ) 12x24x2 ( ) 12x24x12
REHEAT COIL 1/2" O.D. 4 ROW/10 FPI R22 `' -‘A)C) Vic(. C\ U l7S ( 8 ) 20x20x2 (__- ) 24x24x2 ( ) 24x24x12
FILTER SECTION FLAT UNIT ACCESSORIES
PREFILTER 2"- 30% EFF. Variable Inlet Vanes: ...❑
DOUBLE WALL ACCESS DOORS IN FAN & COIL SECTION External Vibration Isolators: RIS 0 Spring 0
COIL SECTION ACCESS DOOR D. WALL Floor Mounted 0 Suspended❑
INSULATION 2"- 1-1/2 lb. FIBERGLASS IN FAN & COIL SECTION Internal Spring Isolation(Fan&Motor): M-4—
COILS
J 4COILS PREHEAT COIL COOLING COIL SUB COOLER COIL REHEAT COIL
Model -Size 5WM0412C 36 x 102 4CF1202C 37.5 x 102 4CF1004C 37.5 x 102
Rows/Fin Series 12 I 4 12 I 2 4 I 10
CFM Thru Coil 10000 10000 10000
L.. .4. N\ CTOR FAA Sq. Ft./Face Velocity 25.5 I 39Z2 26.6 / 376.5 26.6 / 376.5
Ent Air-°F(DB&WB)
Lvg.Air-°F(DB&WB)
` ii - NK,
CONNEL:CIOWSTotal BTUH
Sensible BTUH _ - --
Evap.Temp./Ref.Type
Water Temp. °F,EWT/LWT
Air Press. Drop(in.water) 0.73 I 0.14 _ 0.24 I
Fluid P.D. (Ft.water)I /
COIL CONNECTION SIZE&LOCATION COILS- Std Construction- Cu. Tube, Alum Fins
(Coil And motor hand determined when Additional Comments:
Facing the front of the unit) 1) Minimum 14"Space Between Coil Fin Packs
COOLING SINGLE CIRCUIT 2) Combination Fused Disconnect&Motor Starte
Inlet (1) 2-1/2"M.P.T. in a N.E.M.A. 1 enclosure with Control Power
Outlet (1) 2-1/2"M.P.T. COOLING Transformer 460 Primary-120 Volt secondary
REHEAT SUB COOLER TWO CIRCUITS REHEAT 3) Insulation is 2"-1-1/2 lb.Density-Foil Faced
Inlet (2) 2-1/8"O.D.S. REHEAT Fiberglass In lieu of standard 1"-3/4 lb.Fiberglass
Outlet (2)2-1/8"O.D.S. 4) All Access Doors Double Wall Construction
REHEAT R22 TWO CIRCUITS FRONT 5) Access Door Between Coils
r
Inlet (2)2-1/8"O.D.S. I 1 6) Gasketed&Sealed Panels
Outlet (2) 2-1/8"O.D.S. UNIT WEIGHT = 3662 lbs.
MODEL HCL HEATCRAFT ..
Acf:itci..f:0PrdC:
SIZE 26FC BOHN
Nu_OD c0
�' N
MOUNTING LOCATIONS C N
g Fl w
1,. 1., 1., in
a
1f 1 s O a) N - .4- 'it
1 C
i \= q o `h —
m - M if• w " t 0 0 o 0
co II) in
c o COIL COIL 2"FLAT m p 0
c o FAN SECTION SECTION SECTION FILTER
118" . 3 SECTION 0
IS 0
°. 0 0 W
co
T ]Ji ILI • J
in _Ltil 11-
0 u_
10 g = O
- 44" . 22-1/4" -*�- 44-5/8" g" -- m o 0
All mounting holes are 5/8" diameter. Em in
"' z
MOUNTING
W
Z
,� 1
:,. 2-W`
DETAIL 0 "'
:v:y M1:ii''+�:: re
. ,_ 3"
• 0 0
\ 1 11� . 0 0 0 0
3-7/8"-I AIR
t
N-
i:o �'�RN. � N ui M —► .—!
..-. ..,...,-
OVERALL t...... - cn
,�
DIMENSIONS 120" 116-7/8" o