HomeMy WebLinkAboutabove ground piping info f GENERAL INFORMATION 13-9 CONTRACTOR'S MATERIAL&TEST CERTIFICATE FOR ABOVEGROUND PIPING PROCEDURE Upon completion d work Inspection and tests shall be mads by Ahs contractors repre.entattw and witnessed by an owners repreunlallvs.All defects Mall be corn ectad and system leh In service Delors contractors personnel finally leave the lob. A cenllkals shal be filled out and signed by both reprsasntallves.Coples Oa!ba prepared be approving aulhorn les,owner,and contractor.h is urn.ntood Ma owners r.p- localatn.s signatureIn no way preludloes any dam agahal contractor for lauay rnaerul,poor workmanship,or Imlure to conpfy wall approving autnaeys rquirertnnI$or local aAnanps. PROPERTY NAME D� I�(J,© �j�� ��6.... l DATE / 8 PROPERTY ADDRESS 795 06_0 GrT'/3T.96_. / A4) ACCEPTED BY APPROVING AUTHORITIES(NAMES) /17/ Ofr. ADDRESS C)AJ0 PLANS INSTALLATION CONFORMS TO ACCEPTED PLANS EQUIPMENT USED IS APPROVED 'YES ONO ' IF NO,EXPLAIN DEVIATIONS 61'YES ONO VIAS PERSON IN CHARGE OF FIRE EQUIPMENT BEEN INSTRUCTED AS TO LOCATION /` /1(YES ONO OF CONTROL VALVES AND CARE AND MAINTENANCE OF RIAS NEW EQUIPMENT? IF NO,EXPLAIN INSTRUCTIONS HAVE COPIES OF THE FOLLOWING BEEN LEFT ON THE PREMISES: �y i. SYSTEM COMPONENTS INSTRUCTIONS yr.YES ONO 2 CARE ANO MAINTENANCE INSTRUCTIONS 'AYES ONO 3. NEPA 13A YES ONO LOCATION 9�YES ONO OF SYSTEM SUPPLIES BUILDINGS g,( ?T/,� L/ 3 fYJ fit/ e,":31,2,(.....6 fr .. ,G)S YEAR OF ORIFICE TEMPERATURE MAKE MODEL MANUFACTURE SIZE ' SIZE QUANTITY I RATING I /GAS SPRINKLERS -31//'v _ J • _ PIPE Alto Type of Pp. ./6 i ec:7- � FITTINGS lyp.of Finings T2!4 N ' lp r� E • i li l— -rR DOCT/L _.i c_NN ALARM ALARM DEVICE MAXIMUM TIME TO OPERATE VALVE TYPE THROUGH TEST COtTNEG:ION OR FLOW MAKE MODEL MIN. SEC. INDICATOR �w yv.7,A,roic./rc�e Agree. - Vs,,:_7-f • DRY VALVE 0.0.0. MARE MODEL SERIAL NO. MAKE MODEL SERIAL NO. TIME TO TRIP T11RU TEST WATER TIME WATER ALARM DRY EAIR TRIP POINT REACHED OPERATED CONNECTION' PRESSURE PRESSURE AIR PRESSURE TEST CUTLET' PROPERLY OPER MG MIN. SEC. PSI 1 T _ PSI PSI MIN. I SEC. YES NO Without Q.O.D. With O.Q.D. IF HO.EXPLAIN 'MEASURED FROM TIME INSPECTORS LEST CONNECTION IS OPENED. OSA(1X00) PRINTED IN U.S.A. (OVER) Figure I-10.1(a) Contractor's Material and Test Certificate for Aboveground Piping. 1989 Edition 13-10 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS OPERATION 0 PNEUMATIC 0 ELECTRIC 0 HYDRAULIC PIPING SUPERVISED 0 YES O NO i DETECTING MEDIA SUPERVISED DOES VALVE OPERATE FROM THE MANUAL TRIP ANOrOR REMOTE CONTROL STATIONS 0 YES 0 NO DELI) & IS THERE AN ACCESSIBLE FACILITY IN EACH CIRCUIT FOR TESTING IF NO,EXPLAIN OYES ONO PR TON IVES 0 YES ONO DOES EACH CIRCUIT OPERATE DOES EACH CIRCUIT MAXIMUM TIME TO MAKE MOOEL SUPERVISION LOSS ALARM OPERATE VALVE RELEASE OPERATE RELEASE YES I NO YES I NO MIN. SEC. of 150 psi HYfROSTAT1c.,Hydrostatic tests shall be made at not Mss than 200 psi(13.8 bars)for two hours or 50 psi(3.4 bars)above static pressure in excess ITEST shall n(1 bars)for two hours.Differential dry-pipe valve daggers shall be left open dump test to prevent damage.All aboveground piping leakageDESCRIPTION PNEJ IMATI:;Establish 40 psl(2.7 bars)air pressure and measure drop which shall not exceed 1-12 psi(0.1 bars)In 24 hours.Test pressure tanks at normal water level and air pressure and measure air pressure drop which shall not exceed 1-12 psi(0.1 bars)h 24 hours. ALL PIPING HYDROSTATICALLY TESTED AT ZOO PSI FOR Z HRS. IF NO.STATE REASON DRY PIPING PNEUMATICALLY TESTED OYES ONO EQUIPMENT OPERATES PROPERLY 'E YES O NO . CO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT ADDITIVES ANO CORROSIVE CHEMICALS.SODIUM SILICATE OR DERIVATIVES OF SODIUM( SILICATE.BRINE.OR OTHER CORROSIVE CHEMICALS WERE NOT USED FOR TESTING SYSTEMS OR • TESTS STOPPING LEAKS? LYES 0 NO DRAINI READING OF GAGE LOCATED NEAR WATER ` RESIDUAL PRESSURE WITH VALVE IN TEST TEST SUPPLY TEST CONNECTION: PSI CONNECTION OPEN WIDE PSI UNDERGROUND MAINS AND LEAD IN CONNECTIONS TO SYSTEM RISERS FLUSHED BEFORE CONNECTION MADE TO SPRINKLER PIPING. VERIFIED BY COPY OF THE U FORM NO.858 O YES 0 NO OTHER FLUSHED BY INSTALLER OF UNDER- GROUND EXPLAIN SPRINKLER PIPING 0 YES 0 NO BLA II EIS NUMBER USED I LOCATIONS 111 NUMBER REMOVED WELDED PIPING 1ii,.YEs 0 NO IF YES... • DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING PROCEDURES COMPLY WITH THE REOUIREMENTS OF AT LEAST AWS D10.9.LEVEL AR-3 YES ONO WELDING DO YOU CERTIFY THAT THE WELDING WAS PERFORMED BY WELDERS QUALIFIED IN COMPLIANCE WITH THE REQUIREMENTS OF AT LEAST AWS 010.9.LEVEL AR-3 .YES ONO DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A DOCUMENTED OUALITY CONTROL PROCEDURE TO INSURE THAT ALL DISCS ARE RETRIEVED.THAT OPENINGS IN PIPING ARE SMOOTH.THAT SLAG ANO OTHER WELDING RESIDUE ARE REMOVED.AND THAT THE INTERNAL DIAMETERS OF PIPING ARE NOT PENETRATED CUTOUTS DO YOU CERTIFY THAT YOU HAVE A CONTROL FEATURE TO ENSURE THAT ALL YES ONO (DISCS) CUTOUTS(DISCS)ARE RETRIEVED? HYDRAUUC NAME PLATE PROVIDED '1;.YES ONO DATA IF NO,EXPLAIN NAMEPLATE ' 'J/Es O NO DATE LEFT IN SERVICE WITH ALL CONTROL VALVES OPEN: REMARKS NAME OF SPRINKLER C TRACTOR /71 /4? / //`1E' / OT?j/cdAi TESTS WITNESSED BY SIGNATURES FOR E WNER(SIGNED) TITLE../fir of—FICA DATE 7Sd%(A/le I • D — ICA It �r1-'31� `- ' FOR INKL CONTRACTOR(SIGNED) TITLE DATE ADDITIONAL EXPLANATION AND NOTES I I 85A BACK Figure 1-10.1(a)(continued) Contractor's Material and Test Certificate for Aboveground Piping. 1989 Edition