Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2003-P06501 - addn/remodel/repair
PERMIT CITI� Off' ORONO permit Number: 2750 Kelley Parkway- PO Box 66 P06501 Crystal Bay, Minnesota 55323 Permit Type: Addition/Remodel/Repair (952) 249-4600 Date Issued: 7/23/2003 SITE ADDRESS: 2535 Old Beach Rd Wayzata,MN 55391 PID: 21-117-23-22-0019 DESCRIPTION: UBC occupancy R3 Proposed Use: Residential Construction Type VN Permit Class: Building Census Code 434 Permit Type: Addition/Remodel/Repair Permit Sub-type(s): Addn/RemodeVRepair DETAILS: Approved per resolution#: Separate permits required: Electrical(state) NOTICESIREMARKS: FEE SUMMARY: Permit Fee: $ 472.05 Valuation: $ 32,500.00 Plan Review Fee: $ 306.84 State Surcharge Fee: $ 16.75 TOTAL FEE: $ 795.64 APPLICANT: Sawhorse Inc. OWNER: Tom&Alicia Codute 4740 42nd Ave N. 2535 Old Beach Rd Robbinsdale,MN 55422 Wayzata MN 55391 THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE THE REAL IMPROVEMENTS SPECIFIED AND AGREES TO DO ALL WORK IN STRICT COMPLIANCE WITH ALL CITY OF ORONO ORDINANCES AND STATE OF MINNESOTA BUILDING CODE REQUIREMENTS. APPLICANT PE SIGNATURE ISSUED BY SIGNATURE Conies: 1-File(Siznitures Required),1-Applicant,1-Monthly Reports, 1-Assessing,1-Finance Page 1 Total Fee: Date Received: $ ���'� Permit#: Entered By: CITY OF ORONO - BUILDING PERMIT APPLICATION All information must be submitted in full before plan review will be started. (please print all information) ----------------------- THE ,APPLICANT IS: (circle one) OWNER O ONTRACT JOB SITE ADDRESS: 16 ZIP: PHONE: (home(%L Al NAME OF OWNER: 11-vc)Y =4WzL CITY: MAILING ADDRESS: CONTRACTOR: �0`l �Y PRONE: ( CONTACT PERSON: MOBILE/PAGER: CITY: MAILING ADDRESS- �b ZIP: STATE LICENSE: # � ARCHITEMENGINEER: w i +wiaPI ONE: CITY: ZIP: MAILING ADDRESS: 0 REGISTRATION# NAME: - Addition Accessory Structure Move TYPE OF WORK: New ----Remodel/Alteration $- Land Alteration PROPOSED WORK(describe in der il): v tiUAI�4L�� STORIES: _ __ SQ.FEET OF EACH FLOOR: DET. NO, OF BEDROOMS: _ GARAGE STALLS: ATT. (excluding land): $ L S DD IM , ©�► ESTATED CONSTRUCTION'VALUATION I hereby apply for a building permit and I acknowledge that the information above is complete and accurate; that the work will be in conformance with the ordinances and work as not to start es of the CiTY and th the State Building Code; that I understand this is not a perm it andith permit; and that the work will be in accordance with the approved plan. DATE: APPLICANT'S SIGNATURE: 1 4- ----- j �" 0 NOTE! parg&gf HaMaeven require separate permit approval by Police Department and event. Non permitted events will not be allowed. City Council 60 days prior to the CHECK OFF LIST FOR ISSUANCE OF PERMITS FOR OFFICE USE ONLY ADDRESS OR LEGAL: ZS 3- o c-4 3 e�+,f PID: -- --- -- - DESCRIPTION OF WORK: ✓��. ZONI\TG REVIEW BY: DATE APPROVED: BUILDING REVIEW BY: DATE APPROVED; FEES TO BE CHARGED: Misc. Fees Calculated By: PERWI r Yesy No PLAN REVIEW Yes_� No SEWER CONNECTION STATE SURCHARGE Yes_� No WATER CONNECTION INVESTIGATION FEE Yes No PARK FEE SAC Yes No SITEINSPECTION Number of SAC-Units OTHER (specify) ZONING CHECK CHECK LIST Zoning District: ArO C�nw Fire Department: Post Office: School District: Lot Area: Sqft. Acres tate Depth Survey Submitted: Yes No f Survey: Proposed Setbacks: Front(Lake): Right Side: Rear(Street): Left Side: Adjacent Structures: NVetland: Building Height: Def. Hgt. Peak Hgt. Lot Coverage: Grading: Staff Approval Date: By: Council Approval Date: Septic: Staff Approval Date: By: Zoning File: # Resolution: # IR esoluelon Date: Shoreland District: Avg. Setback: Bluff Setback: Lot Coverage: Existing Proposed Hardcover: 0-75' 75-250' 250-500' 500-1000' Hardcover Variance Required: Yes No Date of Council Approval: REMARKS(in house): 7 BUILDING-REVIEW CHECK LIST . UBC: CONSTRUCTION TYPE: Basement Sq Footage $Per Sq Ftg ' 1st Floor xx . 2nd Floor x — Garage x _ x TOTAL Estimated Construction Value: $ 32, Seo a' Inspections Required: Work Requiring Separate Permits: Site PIumbing Fire Hardcover Removal Mechanical _ e Footing Water Connection Septic • �Framing Fireplace Insulation Sewer Connection as0�') Lawn Irrigation Wall Board Other Final (Mfg.) Well(State Permit) Other Grading/Filling cK, Electrical(State Permit) REMAKES(INHOUSE): REVIEW BY OTHERS: DATE: Access: Existing New Access Approval: Date By: REMARKS (TO BE NOTED ON PEMNU'I): ._........ '�w____ 8 Sec.13.04 RIGgTS OF SUpjEC:TS OF DATA Subd. 1, Type of data. The rights of individual an whom the data is stored or to be stored shall be as se[forth in this sec4on. Subd.'—• ( otutaliou required to be given individuaa• An individual asked to supply private or cottfidcnu subdivision,dam or star himself seal: be informed of: (a)the purpose and intended use of the requested dam Within the ool crirt5wn �0.ngenaris agliric"fromh ssupplying orrcPusing to supply (b)whether he may refuse or is Icl;ally required to supply the requested data;(c)any private or confidential d�dua d b#S�the identity d[o supply f investigative c dam,her persons or PuRst'�t o sectioo authorized n 13 82 subdistate or rviision 5 o a law enforcement officer- nor Thisrequirementshall nor apply when an end The CpmmisSioner of revcnOc may lace the noxi` " uircd nder this subdivision 1 the individual income taz or roe taz refund instructions in read of on nae fnrrtts, , dual shati be bject Subd. 3. Access to data 1byhindividual-r it is assified as public, private or cono a Gftd ndal. Upon his authority.an tfurther requcsc,anindividualed cwho is the r he is the subject of stored data on individuals, and the data need not be disclosed to him for of scored private or public data un individuals shall be shown the data without any charge to him and:if he dcs'ues, shah be informed of a conte at and rn an ng of that data. After an individual has been shown the pnvarti data and informed of its meaning, six months thereafter unless a dispute copies of the private oripubtic data pons section is d equesing or abytthe individual subjt t of the data-al data on the individual has bThe responsible bler urthonry The responsible authority shall p certifying,and compiling the copies. or withiri 3.ys of may require the requesting person to pay the actual costs ofely, if making, The responsible authority shall SoSunldays andtlegal holidays,iftmmcdi�tc compliance y request ispnot possible. Tf h cannot comply With[the ve drequ request the date of the request.excluding; Y within that time,he shall so inform rhe individual,and may have an additional five days within which w comply with the request,excluding Saturdays. Sundays and legal holidays. te or copicte. An dual may the accuracy or of Public 01 Private Subd 4, Procedure when d this is n t ccuujrvtdual shallmnotify in wrinngtthc r Spon contest uthority des nbing thecompleteness nature of tht:disagreement. ind darn canczming himself. To ex re to pL 10 The responsible authority shall within udit recipirnTs of no days recipients enamedeby the orrect individual; orata (b)(b)bnotify the individual that rhe belle[es the dams o benotify scomet, Data inaccurate or incomplete data, , I S mated Pursuant to the provisions of[hc adtninistranve procedure act relating to in dispute shall bo disclosed only if the u[dividual's statement of disasreemant is included with the disclosed ata. The detcrminution of the responsible authority may be app P con[csted cases, DATA PRIVACY ADVISORY Ire accordance with M-S. 13.04, Subd.2, "Rights of subjects of data", we would like to inforzL you that your request for a permit or license from the City of Orono or any of its departmenIs may require you to furnish certain private or confidential information. you are notified that: The led 11pation ou furnish will be used to determine your qualification.for the permit or license requested. 1 Y q City deny the permit or license. d 2. You may reface to supply data, but refusal may require that the rocess 3, The information may be sharewith other local, state or federal agencies to the extent necessary to p The permit or license. 4. If your requested permit or license requires Council action to approve, some information may become public. p q p ourself. g. You have: certain rights under M.S. 13.04 (available upon request) to review private data on y process this application or permit. 6• your full name is required to Middle Lag 'First Address State Zip Phone City 1 understand my rights as stated above. Signature SAWHORSE DESIGNERS & BUILDERS Tom and Alicia Codute Date: 7/l/03 2535 Old Beach Road Rev: Wayzata, MN 55391 Job# 1687 [] SCOPE OF PROJECT: Laundry/Mudroom Remodel [J New wall constructed are shown as"crosshatched" on proposed plan. Walls to be removed shown as"woodgrained". [] Install white melamine closet shelving and white aluminum rod. [] INTERIOR DOORS- closet doors 2'6" x 6'8" Colonist raised panel, hardboard SC Prehung door Rough opening: 2'8"x 6'10" Jamb size: 51/4", due to new 2x4 stud walls Door swing per plan Hardware: to be selected Trim: [] MECHANICAL per contract, reconnect dryer vent to exterior connection. [] HEATING per contract. Install new gas line/connect to existing line for unit heater. Supply and install gas garage space heater and install metal flue as needed. Q PLUMBING per contract and the following: Relocate hose bib, and reuse existing drain, vent and waste lines at sink location. Install gas piping and connect gas appliance. Laundry Tub:Manufacturer: Mustee Model: Durastone drop-in sink(#10) Color: White Faucet: Grohe# pullout with satin nickel finish per c/o [] ELECTRIC per contract: • SAWHORSE to install electric to new heating unit. • Security system relocated by owner. • Confirm smoke detectors in house to current code. Any changes to the above quantities will be charged or credited accordingly. *Indicate any special receptacles needed for computers, entertainment centers or any special height wanted. [] DRYWALL— • '/z" gypsum board over wall studs w/taping process, sanded smooth for Sawhorse spackle touch-up, prime and painted finish. • 5/8" gypsum board for all ceiling or soffit patching w/taping process and "knockdown" texture finishes, primed and painted finish. t � SPEC'S Page 2 of 3 Q CERAMIC TIM per plan and the following allowances for materials: Floor tile- $6/S.F. Any changes to the above quantities will be charged or credited accordingly. 0 CABINETRY shall be CUSTOM manufactured components. Hallway cabinet(custom): Style: W'reveal,T.B.S. Door style&finish: Cherry,Prairie style Interior finish: white melamine Hardware: to be selected/$5 pull allowance Accessories per plan: Laundry cabinets and bench: Style: 1/a'revel,"fill overlay",Dura-Supreme Door style&finish: white"thereto-foil prairie"modular cabinets Tzrterior finish: white melamine Hardware: Berensen#9829-3BPN cup pull in Satin Nickel Accessories per plan: 0 COUNTERTOP shall be custom plastic laminate. Color: to be selected Edge style: wood edging Backsplash: none Install CLIENT supplied APPLIANCES Refrigerator:. Existing Washer/Dryer: stackable-Kenmore Elite(27"x 76"x 31 %"D) [] DECK/Landing Construct P.T.wood frame structure for installation of the finish flooring. Construct stairs per plan.Guard Railing to be cedar and stainless steel w/ 3/8" balusters @ 4"o.c.,design. Also,construct cedar bench w/no back per plan. [] PAINTING-Sawhorse to prime and paint all new walls and ceilings.and stain and varnish all new woodwork to match existing AC". [] GENERAL NOTES [] CAUTION: Do NOT remove,tear down,or dig up anything before building permit is on job site. Q OWNER to protect or move all personal property from iti or around construction area, both interior and exterior. Please review area before construction start-up and remove necessary items. (] OWNER DIRECT"Not Included in Contract'ITEMS: SAWHORSE to assist in schedule coordination 0 All electrical. • a SPEC'S Page 3 of 3 • Modifications to public utilities • ABATEMENTS(lead or asbestos) • Corrections of existing substandard conditions(structural or mechanical) Owner.is responsible for all N.LC, obligations: Selections,schedule costs,liabilities and warranty issues. Q Clean up of building debris at job completion by SAWHORSE, Dumpster may be left on job site for building debris. (No tires,appliances or neighbor's mattress). Q Any yard damage REPAIR including trees, shrubs and all landscaping by OWNER. Communication is essential for a successful project. Project Manager. John Westgeard(ext.216) Construction Administrator. Tracy Wright(eat.241) Weekend EMERGENCY Pager. 612-527-2590 SAWHORSE DESIGNERS & BUILDERS Tom and Alicia Codute Date: 7/1/03 2535 Old Beach Road Rev: Wayzata,MN 55391 Job# 1687 Q SCOPE OF PROJECT: Laundry/Mudroom Remodel Q New wall constructed are shown as"crosshatched"on proposed plan. Walls to be removed shown as"woodgrained". Q Install white melamine closet shelving and white aluminum rod. Q INTERIOR DOORS-closet doors 2'6"x 6'8"Colonist raised panel, hardboard SC Prehung door Rough opening: 2'8"x 6'10" Jamb size: 51/47, due to new 20 stud walls Door swing per plan Hardware: to be selected Trim: Q MECHANICAL per contract,reconnect dryer vent to exterior connection. Q HEATING per contract.Install new gas fine/connect to existing line for unit heater.. Supply and install gas garage space heater and install metal flue as needed. Q PLUMBING per contract and the following: Relocate hose bib,and reuse existing drain,vent and waste linos at sink location. Install gas piping and connect gas appliance. Laundry Tub:Manufacturer: Mustee Model: Durastone drop-in sink(#10) Color: White Faucet Grohe# pullout with satin nickel finish per c o Q ELECTRIC per contract: + SAWHORSE to install electric to new heating unit. + Security system relocated by owner. • Confirm smoke detectors in house to cement code. Any changes to the above quantities will be charged or credited accordingly. *Indicate any special receptacles needed for computers, entertainment centers or any special height wanted. Q DRYWALL— • '/Z"gypsum board over wall studs w/taping process, sanded smooth for Sawhorse spackle touch-up,prime and painted finish. • 5/8" gypsum board for all ceiling or soffit patching w/taping process and "knockdown"texture finishes, primed and painted finish. SPEC'S Page 2 of 3 Q CERAMIC 171.E per plan and the following allowances for materials: Floor tile- $6/S.F. Any changes to the above quantities will be charged or credited accordingly. Q CABINETRY shall be CUSTOM manufactured components. Hallway cabinet(custom): Style: '/a"reveal,T.B.S. Door style&finish: Cheng,Prairie style Interior finish: white melamine Hardware: to be selected/$5 pull allowance Accessories per plan: Laundry cabinets and bench: Style: '/4"reveal,"#iall overlay",Dura-Supreme Door style&finish: white"thereto-foil Prairie modular cabinets Interior finish: white melamine Hardware: Berensen#9829-3BPN cup pull in Satin Mickel Accessories per plan: Q COUNTERTOP shall be custom plastic laminate. Color: to be selected Edge style: wood edging Backsplash: none Q Install CIIENT supplied APPLIANCES Refl igerator: Existing Washer/Dryer: stackable-Kenmore Elite(27"x 76"x 31 '/s"D) Q DECK/Landing-Construct P.T.wood frame structure for installation of the finish flooring. Construct stairs per plan.Guard Railing to be cedar and stainless steel w/ 3/8"balusters @ 4"o.c.,design. Also,construct cedar bench w/no back per plan. Q PAINTING-Sawhorse to prime and paint all new walls and ceilings.and stain and varnish all new woodwork to match existing AC". Q GENERAL NOTES Q CAUTION: Do NOT remove,tear down, or dig up anything before building permit is on job site. Q OWNER to protect or move all personal property from M' or around construction area, both manor and exterior. Please review area before construction start-up and remove necessary items. Q OWNER DIRECT"Not Included in Contract"ITEMS: SAWHORSE to assist in schedule coordination • All electrical. SPEC'S Page 3 of 3 • Modifications to public utilities • ABATEMENTS(lead or asbestos) • Corrections of existing substandard conditions(structural or mechanical) Owner is responsible for all N.LC.obligations: Selections,schedule costs,liabilities and warranty issues. Q Clean up of building debris at job completion by SAWHORSE. Dumpster may be left on job site for building debris. (No tires,appliances or neighbor's mattress). p Any yard damage REPAIR including trees, shrubs ad all landscaping by OWNER- Communication WNERCommunication is essential for a successful project. Project Manager: John Westgaard(eat.216) Construction Administrator. Tracy Wright(eat.241) Weekend EMERGENCY Pager: 612-527-2590 ,✓ DATE TIME CITY OF ORONO CALLED IN INSPECTION NOTICE SCHEDULED �s 7-O PERMIT NO. G>SU� COMPLETED -- ��PLETED / ADDRESS 2 5_3 5 c'r°✓ 1 �c / X OWNER CONTR. TELEPHONENO. C-e (a 0-921 g3SV DF. PTION W 1 FOOTIG 11 MECHANICAL RI J J 18 EXCAWGRADING/FILLING W FRA ING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS Q 03 INSULATION 24/25 WOOD BURNEFVFIREPLACE 34 TREE REMOVAL Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT v 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL OWNERICONTRACTORTOMEETYOU:=YES_NO o COMMENTS: az W CL CC J O cc O W W cc Q Z W z W cc O W WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE W W ❑CORRECT WORK&PROCEED F1ISSUE CERTIFICATE OF OCCUPANCY C) ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY Ci BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contract ite: Inspector. White Copyllnspector' File Canary Copy/Site Notice CITY OF ORONO CALLED IN E-0-03 TIME INSPECTION NOTICE SCHEDULED PERMIT NO. R4Q(j0Sbj COMP ADDRESS C95, 5 OWNER CONTR. �GI.eJ`lA�'S2 TELEPHONE NO. DESCRIPTION 01 FOOTING 11 MECHANICAL RI 18 EXCAWGRADING/FILLING Q FRAMI 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS ti 03 iRWUPSON 24/25 WOOD BURNERIFIREPLACE 34 TREE REMOVAL Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP 08 PROGRESS 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT Q 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP 09 PLUMBING RI 23 SEPTIC FINAI, 35 HARD COVER REMOVAL v 10 PLU 38 FOUNDATION/REMOVAL Z OWN CONTRACTOR MEET YOU: YES_NO COMMENTS: a cc j 0 0 W c Q W W Wd0; ORK SATISFACTORY,PROCEED ❑PROJECT COMPLETE W ❑CORRECT WORK&PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY C ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑PHOTO TAKEN INSPECTOR WILL RETURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑INSPECTION REQUIRED.CALLTOARRANGE ACCESS. Call for the ne s ion 24 hours In advance. (952) 249-4600 Owner/Contractor on Inspector. White CopyMapectoes File Canary Copy/Site Notice