Loading...
HomeMy WebLinkAboutRe: project jurisdiction 443 Lafayette Road N. MINNESOTA DEPARTMENT OF (651)284-5005 St. Paul, Minnesota 55155 LABOR & INDUSTRY 1-800-DIAL-DLI www.doli.state.mn.us TTY: (651)297-4198 AAMMkk PROJECT JURISDICTION NOTIFICATION COPY TO BUILDING OFFICIAL: Date: 10/27/2008 Oman, We Edward 7765 Pleason Ave. South Haven MN 55382 Project Title: Orono Int/F1em Phase 11 Int/Ext Ren Location: City of Orono Address: 685 Old Crystal Bay Road North This information can be provided to you in alternative formats(Braille,large print or audiotape). Pa Form NC An Equal Opportunity Employer 443 Lafayette Road N. MINNESOTA DEPARTMENT OF (651) 284-5005 St. Paul, Minnesota 55155 1-800-DIAL-DLI www.doli.state.mn.us LABOR QINDUSTRY TTY: (651) 297-4198 iAA90F& PERMIT REQUIREMENTS ARCHITECT/ENGINEER: Date: 10/27/2008 Wold Architects & Eneineers 305 St. Peter Street St.Paul MN 55102 PROJECT: Orono Int/Elem Phase II Int/Ext Ren LOCATION: City of Orono COUNTY: Hennenin DESCRIPTION: Mech/Elec Uourades. ADA Unarades. Ceilinu ADDRESS: 685 Old Crvstal Bav Road North ***************************************** * ASSIGNED PROJECT NUMBER: 20080509 Date Received: 10/27/2008 ***************************************** We have reviewed your initial application for this "Public Building"or"State Licensed Facility" (M.S. 16B.60)and determined that it is located in a jurisdiction that will not be administering the building code for this project. According to M.S. 1613.61 Sub.la,the Commissioner,shall administer and enforce the State Building Code as a municipality. Therefore,please be aware that CONSTRUCTION MAY NOT BEGIN UNTIL BOTH PLAN APPROVAL AND REQUIRED PERMITS ARE FIRST OBTAINED FROM THIS OFFICE. Please complete the enclosed "Application for Plan Review" (if not yet submitted)and return it along with all required application materials. We will review the documents for compliance with the Minnesota Building Code and issue a Plan Review Report. When compliance has been achieved,we will issue a Plan Review Complete letter.A "Building Permit Application" is also enclosed. The owner or authorized agent acting on behalf of and contractually for the owner must complete and return the building permit application and fee to obtain a building permit. An inspector for the state will be assigned to this project to verify compliance with the requirements of the Minnesota State Building Code.Also,please note that land-use zoning permits may be required by the local jurisdiction before beginning construction. Thank you for your assistance. Sincerely, Jerry Norman, Supervisor Building Plan Review GN:mw c: Regional Building Official Plumbing Unit Municipal Building Official(if applicable) enc: Applications for Plan Reveiw and Building Permit This information can be provided to you in alternative formats(Braille,large print or audiotape). PaFormNC `. An Equal Opportunity Employer Its c-7 MinnesoConstruction tDepartment Cd s nd Lice sing Div s Division e2oo 9 Building Plan Review/Inspections MINNESOTA IDEPARTMENT O 443 Lafayette Road North LABOR & INDUSTRY St.Paul, MN 55155-4341Ask Phone: (651)284-5068 Fax: (651)284-5749 www.doli.state.mn.us/buildingcodes Application for Plan Review TTY: (651)297-4198 PRINT IN INK or TYPE your responses. PROJECT TITLE Yr-d� n�2�-v►�ed1,��e �n�y��l �y,�e�I-z!�„y SGS ory15 PROJECT ED CONSTRUCTION VALUATION -1 Sz- .JJ ✓'i Off^ ✓� G'X�Pr✓-, In lam,ei� �)()�.s 1 , ?'- 000 ADDRESSANTICIPATED START DATE n]� (o�S-olA Gays +l &A,/ )2� N. 1�gs QIP cYsJAi 6AY rte.N NIA q i�q Ma1A'^7 CITY OR TOWNSHIP WHERE LOCATED***PLEASE VERIFY— COUNTY STATE PROJECT ND.- - Akxv- s-a L-ony LAlc.e. ���-i�ny , �,+y D9- oronv 4enneyo,".1 s OWNER(OR STATE AGENCY IF APPLICABLE) CONTACT r�r�ovry Groh o �°I�I�I.G SG►�ool5 — _r"5P4'"279, o� -i ADDRESS PHONE qg�2 CITY STATE ZIP CODE FAX L OM6 Lake M N 55")0 q'SZ DESIGN FIRM PROJECT CONTACT Vv yr�1� -�TGCS ahv� i rFZ C 1l ADDRESS I __ PHONE 30 �'� pe. r ��*�&°�' &F-I 227- 7773 CITY STATE ZIP CODE FAX S4-_ PAi,1 N N 5' 710.2_ 6,9-1 223 E-MAIL Check if you would also like to receive your plan review by e-mail Na B 0ldq-e•con, PROJECT TYPE ❑ Public(state-owned)building paid for by the state or other state agency for. ❑ National Guard ❑ Historical Society ❑ MN Zoo ❑ D.O.T. ❑ D.N.R. ❑ Iron Range R ❑ MNSCU(State College or University) ❑ State Hospital ❑ State Home ❑ Capitol Complex Public school district building of$100,000 or more in construction cost ❑ State Licensed Facility licensed as a: ❑ Hospital ❑ Nursing Home ❑ Correctional Facility ❑ Supervised Living Facility ❑ Free-standing Outpatient Surgical Center CLASS OF WORK ❑ New Building Construction ❑ Addition X Remodeling ❑ Other,specify IBC OCCUPANCY CLASS IFICATIONS) TYPE OF CONSTRUCTION I SPRINKLERED IBC A� � �t 3 A Yes ❑ No ❑ Partial PROJECT DESCRIPTION McCLtq,,-"j a,.l ��G-}�.; U1'�j�"G+�2S � A-t7A- 'A",ftAej , GSA GSJac7Aa-e�l c.0��+' 1'>✓I���ar+'S , o(ed-err,c� r,of�����•►n ce. ��w,s a}- 1ZS,6(D 5�. ��1c�r,.e,l.�.►.�53(o i D S,�. NOTE: The following materials must be submitted(as applicable),with this Application for Plan Review: 1. Complete set of Plans and Specifications 4. Code Record 7. Soils Investigation Report 2. Addenda and/or Change Orders 5. Sample Structural Calculations 8. Energy Code Envelope 3. Plan Review Fee 6. Special Inspection Program Compliance Forms Licensed professional: /attest that these plans and/or specifications were prepared by me or under my direct Minnesota Registration No. supervision and that reasonable care has been given to compliance with applicable laws, ordinances and building 1-7 q 3' codes and that this application is not a building ermit nor does It authorize the star`of construction APPLICANT NAME( RINT) APPLICAN IGNATUR DATE C7le'r A. I--�I►l0 (� /o ee' Is this project on the State"MAPS"accounting system? ❑Yes [g No State Agency that will be paying fee? Calculated Plan Review Fee(ByA licant FOR OFFICE USE ONLY A plan review fee must be submitted.Please see Plan Review Fee Project N Date Amount of Check the Plan Fee Schedule Worksheet for correct 2 v 10 Ov-5 V 110-47-09 '/�1 ® 9� calculation of the required Ian review fee l270, 5-� Q( v ®'�/ This material.can be made available in different forms, such as large print, Braille or on a tape. To request,call 1-800-342-5354(DIAL-DLI)Voice or TDD(651)297-4198. BCS 02(2/07) 1 ' RieCEN D 4 P '�U i009 MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY ClTyOFORONO �wv Division of Construction Codes and Licensing REPORT ON PLANS Plans and specifications on plumbing: Orono Elementary and Intermediate School Phase II Renovations, 685 North Old Crystal Bay Road, Long Hennepin County, Minnesota,Plan No. 096475 OWNERSHIP: Independent School District No.278,c/o Ms.Karen Orcutt, Superintendent, P.O. Box 46, Long Lake,Minnesota 55356-0046 SUBMITTER(S): Karges-Faulconbridge,Inc., 670 West County Road B, St. Paul,Minnesota 55113-4527 Plans Dated: Plans and Specifications January 20,2009; Sheet Nos. M113,M114,M116,M125,M127, M201, M202,M204,M205,M207,M212,M213,M221 thru M225,M227,M234,M814, and M905 February 4,2009; Sheet Nos. M000,M206,and M226 February 10,2009;KFI-PR-M001 April 6,2009 Date Received: April 8, 2009,March 6, 2009 Date Reviewed: April 13,2009 SCOPE: This review is limited to the design of this particular project only insofar as the provisions of the Minnesota Plumbing Code, as amended, apply, and does not cover the water supply or sewerage system to which this plumbing system is connected. The review is based upon the supposition that the data on which the design is based are correct,and that necessary legal authority has been obtained to construct the project. The responsibility for the design of structural features and the efficiency of equipment must be taken by the project designer. Approval is contingent upon satisfactory disposition of any requirements included in this report. Special care should be taken to insure that the material and installation of the plumbing system are in accordance with the provisions of the Minnesota Plumbing Code. A copy of the approved plans and specifications should be retained at the project location for future reference. INSPECTIONS: All plumbing installations must be tested and inspected in accordance with the requirements of the Minnesota Plumbing Code. As specified in Minnesota Rules,part 4715.2830,no plumbing work may be covered prior to completing the required tests and inspections. Provisions must be made for applying an air test at the time of the roughing-in inspection as outlined in Minnesota Rules,part 4715.2820, subpart 2,of the code. - A manometer test,as specified in Minnesota Rules,part 4715.2820, subpart 3,is required at the time of the finished plumbing inspection. It is the responsibility of the contractor/installer to notify the Minnesota Department of Labor and Industry when an installation for a state contract job, licensed facility,or project in an area where there is no local administrative authority is ready for an inspection and test. To schedule inspections, contact the state plumbing standards representative for your region, or call Jim Peterson at 651/284-5889. REQUIREMENT(S): 1. Verify that the existing water supply and waste systems are sized to accommodate the added fixtures(see Minnesota Rules,part 4715.3700 and part 4715.2310). 2. Changes in direction in drainage piping must be made by appropriate use of wyes and bends. Sanitary tees are not allowed where the direction of flow changes from either vertical to horizontal or horizontal to horizontal(see Minnesota Rules,part 4715.2410). 3. The pumped discharge piping from the Area B mechanical room sump basin is shown connecting to a horizontal sanitary piping.Verify that the following requirements are met: a. Fixture unit values for flow into the drainage system from a pump or sewage ejector shall be computed on the basis of one fixture unit for each gallon per minute flow(see Minnesota Rules,part 4715.2300). Thus,the existing 4-inch sanitary branch shall be sized to accommodate the additional 40 drainage fixture units provided by the sump pump(see Minnesota Rules,part 4715.2310). A maximum of 160 drainage fixture units are allowed on a 4-inch sanitary branch. Orono Elementary and Intermediate School Phase H Renovations Plumbing Plan No. 096475 Page 2 April 13,2009 b. The method of connection to the horizontal gravity line shall be from the top through a wye branch fitting(see Minnesota Rules,part 4715.2440, subpart 2). 4. Verify that the new vent that will be provided for the existing floor drain in the lower elevation area in Room No.B002 is taken off above the centerline of the pipe and rises ertically, or within 45 degrees of the vertical,to a point at least 6 inches above the floor before offsetting horizontally(see Minnesota Rules, part 4715.2540,subpart 2).It appears that the vent shown on Sheet No M202-R2-3 is flat vented.Refer to the Venting of Floor Drains handout for additional information. 5. The plans show that some fixtures will be connected to existing waste d vent piping nearby.Verify that these fixtures are trapped and vented in accordance with Minnesota R les,part 4715.2620. 6. Verify that the building is served by a full-sized vent stack that is continuous in size from its base to its terminal(see Minnesota Rules,part 4715.2520, subpart 1). 8. Verify that the following cleanout requirements are met: a. Each horizontal drain branch,including floor drain branches, shall be provided with a cleanout at its upper terminal,except that a fixture trap or a fixture with an integi al trap,readily removable without disturbing concealed piping,may be accepted as a cleanout equivalent for this purpose(see Minnesota Rules,part 4715.1000). b. Cleanouts shall be of the same nominal size as the pipes they serve up to 4 inches in size(see Minnesota Rules,part 4715.1010). A cleanout must be installed where there 's an increase in pipe size from 2 inches to 3 inches and from 3 inches to 4 inches. 9. It is recommended that a cleanout be provided where new waste and v nt piping connects with existing plumbing to facilitate required testing of the new installation. 10. Showers and combination showers-baths shall be equipped with anti-s ald control valves. These valves must be of the thermostatic or pressure balance type in accordance with ANSI/ASSE Standard 1016-96(see Minnesota Rules,part 4715.1380,subpart 5). The installer must verifY that the maximum temperature setting from the factory is set or adjusted in accordance with the stand rd. It is recommended that the maximum setting of the discharge temperature does not exceed 110 degrees F. 11. The pipe hanger and support spacing requirements listed in Details 814 do not comply with Minnesota Rules,part 4715.1430.Above-grade horizontal plumbing piping must be supported as follows(see Minnesota Rules,part 4715.1430,subpart 4): a. Plastic pipe: at least every 32 inches. b. Cast-iron: at least every 5 feet; or 10 feet when ten foot lengths of pipe are used. c. Copper tubing(1'/4-inch or less): at least every 6 feet. d. Copper tubing(1%i-inch or over): at least every 10 feet. 12. In all buildings other than dwellings,shutoff valves shall be installed hich permit the water supply to all equipment in each separate room or to each individual fixture to be sh at off without interference with the water supply to any other room or portion of the building(see Minnes 3ta Rules,part 4715.1800, subpart 6). Orono Elementary and Intermediate School Phase II Renovations Plumbing Plan No.096475 Page 3 April 13, 2009 13. The Water Heater Flow Diagram, 16/M814,shows that a heat exchanger will be provided for domestic water heating. The double-wall heat exchanger must be designed in a way that any failure of a single wall will allow discharge to the atmosphere of the heat transfer medium or potable water contained by the wall. The discharge location must be visible to the operator or owner,and located so that no hazards are created by the discharge(see Minnesota Rules,part 4715.1941, subpart 2). 14. Equipment used for heating water or storing hot water shall be protected by approved safety devices in accordance with Minnesota Rules,part 4715.2210 and part 4715.2230. Verify that a temperature and pressure relief valve is provided for the water heater. 15. Materials used for the plumbing system shall comply with the standards set forth in the Minnesota Plumbing Code(see Minnesota Rules,part 4715.0420). Verify that the following pipe material requirements are met: a. PVC plastic pipe used for the drain,waste,and vent system shall comply with ASTM Standard D2665, D2949 or F891 (see Minnesota Rules,part 4715.0570 through part 4715.0600). b. Solvent weld joints in PVC and CPVC pipe must include use of a primer which is of contrasting color to the pipe and cement. A one-step solvent cement complying with ASTM Standard F493 or D2846 may be used for CPVC joints(see Minnesota Rules,part 4715.0810,subpart 2). c. Verify that the service weight cast-iron pipe used for the drainage,waste, and vent piping complies with ASTM Standard A 74(see Minnesota Rules,part 4715.0570 through part 4715.0600). d. ASTM Standard D1785 PVC pipe is only approved for underground storm water piping in sizes between 14 inches and 24 inches(see Minnesota Rules,part 4715.0550). 16. The plumbing system shall be tested in accordance with Minnesota Rules,part 4715.2820. NOTE(S): 1. The scope of this project consists of the renovations to an elementary/intermediate school.The plumbing includes the following: a. Area A-Replace several water closets and electric water coolers.Provide two sinks and two teacher's stations.Relocate the domestic water mains to the main level. b. Area B-Replace several electric water coolers.Provide sixteen floor drains, five water closets,one urinal, one electric water cooler,one sink,and six lavatories.Provide a new sump for the floor drains located at the lowest elevation in Room No.B002 and connect the pumped discharge piping to the existing 4-inch sanitary piping in Room No.B007.Provide a new drain tile sump in Room No.B002 and connect the pumped discharge piping to the existing storm water riser before it leaves the building. Replace the existing water heaters with a double wall heat exchanger connected to the heating water system. c. Area C-Replace the water softener,the water meter,and several electric water coolers and sinks. d. Area D-Replace one urinal,twenty shower valves,and several lavatories.The lavatories will be replaced with new multi-user wash fountains.Provide four floor drains,three water closets, one sink, and three lavatories. e. Area E-Replace two multi-user wash fountains,one mop sink, one electric water cooler,and four sinks. Provide one electric water cooler and one hose bib.Modify storm water piping to route two roof drains along east perimeter to new discharge locations.Relocate the domestic water mains to the main level. Orono Elementary and Intermediate School Phase II Renovations Plumbing Plan No. 096475 Page 4 April 13, 2009 f. Area F-Replace four multi-user wash fountains,two electric water coolers, four urinals,eight water closets,and four sinks.Provide six floor drains,three lavatories,Iwo water closets,and one sink. Relocate the domestic water mains to the main level. g. Area G-Replace one multi-user wash fountain,one electric water cooler,two water closets,one mop sink,and eight sinks.Provide one floor drain,one multi-user was fountain,two water closets,two urinals, four hose bibs, and one sink.Relocate the domestic watei mains to the main level. 2. This facility is served by existing municipal sewer and water services Authorization for construction in accordance with the approved plans maybe withdrawn if construction is not undertaken within a period of two years. The fact that the plans have bee approved does not necessarily mean that recommendations or requirements for change will not be made at som later time when changed conditions, additional information,or advanced knowledge make improvements neces 3ary. Approved: Scott A. Sawyer,P.E. Public Health Engineer Plumbing Plan Review and Inspections Unit 443 Lafayette Road North St.Paul,Minnesota 551554343 651/284-5803 SAS:ss Enclosure cc: Karges-Faulconbridge,Inc. Independent School District No.278 Mr.Malvin Wurzer,Building Official File a/