My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
grading plan-2014
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Land Use
>
grading plan-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:03 PM
Creation date
2/22/2018 2:45:08 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Land Use
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.9 if <br /> 11wcopy <br /> Z" <br /> NO <br /> MY OF ORO cow <br /> __2�GRADING PLAN LOCATION OPTION <br /> 9'. <br /> SITE PLAN 20'x40'LEARNING '-2 <br /> PAVILLION WITH 10'x40' z <br /> APPROVEDago <br /> FREE-FLAOTING PLATFORM <br /> 29 APPROVED W7 RvisiONS <br /> 0 <br /> Q <br /> z <br /> 0 DASA P PROPOSEED WOOD CHIP LOCATION OPTION 2: <br /> I.P101 MULCH PATH(CONNECTING <br /> 20'x40'LEARNING <br /> F <br /> BY <br /> RAIS WOOD PLATFORMS(4)) PAVILLION WITH 10'x40' 6 f <br /> Ail 0 <br /> -FLAOTING PLATFORM <br /> fA <br /> FREE (TlP) 1 <br /> Ag <br /> olqt <br /> DELINEATED <br /> WETLAND EDGE <br /> .99 0 <br /> (TYPICAL) <br /> 58 <br /> A. <br /> City of Orono <br /> f <br /> :E <br /> Planning&Zoning Plan Review E <br /> 2 <br /> L <br /> _4 <br /> Site Plan Review Date: <br /> D. <br /> �OIAPPROVEDFUTURE RAISED 1 p,t <br /> ol&o <br /> 13 DENIED <br /> I Off"th gko <br /> I I Ad4t Nd fljlq)%— FUTURE RAISED LAN� 11 1 / '& I—- <br /> h <br /> 2fa 3 <br /> SW: <br /> WOOD PLATFORM <br /> NOTES <br /> 1. ALL CONSTRUCTION MUST COMPLY WITH APPLICABLE STATE AND LOCAL ORDINANCES. <br /> J 012,j <br /> 1Z.4/ <br /> 2. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL SIGNAGE(CONSTRUCTION ZONES)NECESSARY TO CONSTRUCT PROPOSED <br /> IMPROVEMENTS.ALL SIGNAGE LAYOUTS MUST BE DESIGNED BY THE CONTRACTOR AND APPROVED BY LOCAL AUTHORITIES. <br /> Al <br /> 3. INSTALL CONTROL FENCING AND BARRICADING AS NECESSARY TO PROTECT THE PUBLIC. Q <br /> FI Z4 <br /> A. MAINTAIN ADJACENT PROPERTY AND PUBLIC STREETS CLEAN FROM CONSTRUCTION CAUSED DIRT AND DEBRIS ON A DAILY BASIS.PROTECT <br /> DRAINAGE SYSTEMS FROM SEDIMENTATION ASA RESULT OF CONSTRUCTION RELATED DIRT AND DEBRIS. <br /> X <br /> ? <br /> S. MAINTAIN DUST CONTROL DURING GRADING OPERATIONS. <br /> G. ALL EROSION CONTROL METHODS SHALL COMPLY WITH WCA,MINNFHAHA CREEK WATERSHED DISTRICT AND LOCAL REGULATIONS. <br /> T. CONTRACTOR SHALL MINIMIZE DISTURBANCE TO SITE AND PROTECT EXISTING SITE FEATURES(INCLUDING TURF AND VEGETATION)WHICH ARE <br /> -.,ON <br /> TO REMAIN. <br /> DELINEATED <br /> X7.$ <br /> WETLAND EDGE <br /> IL PROPOSED CONTOURS AND SPOT ELEVATIONS ARE SHOWN TO FINISH GRADE UNLESS OTHERWISE NOTED. <br /> 9. PROPOSED ELEVATIONS SHOWN TYPICALLY AS 12.1 OR 12 SHALL BE UNDERSTOOD TO MEAN 1012.1 OR 11112. W <br /> (TYPICAL) _j <br /> 18. SPOT ELEVATIONS SHOWN IN PAVEMENT AREAS INDICATE GUTTER GRADES,UNLESS NOTED OTHERWISE. ST <br /> 11. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR DETERMINING QUANTITIES OF FILL AND WASTE MATERIALS TO BE HANDLED,AND FOR <br /> AMOUNT <br /> OF GRADING TO BE DONE IN ORDER TO COMPLETELY PERFORM ALL WORK INDICATED ON THE DRAWINGS.COST OF IMPORTING FILL OR <br /> DEDICATED <br /> EXPORTING EXCESS OR WASTE MATERIALS WILL BE INCIDENTAL TO THE CONTRACT. N <br /> WETLAND BUFFER <br /> 12. NO FINISHED SLOPES SHALL EXCEED]'HORIZONTAL TO VVERTICAL 13:1),UNLESS OTHERWISE NOTED. 2 <br /> _(TYPICAL) z v Of <br /> 13. ALL DISTURBED AREAS WHICH ARE NOT DESIGNATED TO BE PAVED SHALL RECEIVE AT LEAST 6'OF TOPSOIL AND SHALL BE SODDED, extend�kk <br /> 0 <br /> southerly to Hwy 12—\ <br /> LL _j <br /> 14. FAILURE OF TURF DEVELOPMENT:IN THE EVENT THE CONTRACTOR FAILS TO PROVIDE AN ACCEPTABLE TURF,THE CONTRACTOR SHALL RESOD ALL APPLICABLE AREAS,AT NO ADDITIONAL COST TO THE OWNER,TO THE SATISFACTION OF THE ENGINEER. m' 'm'n 0 0 <br /> (not shown) F_ <br /> 0 0 <br /> 16. LOCATE AL EXISTING UTILITIES.VERIFY LOCATION,SIZE AND INVERT ELEVATION OF ALL EXISTING UTILITIES.VERIFY LOCATIONS,SIZES AND 7,/ _j L) U <br /> ELEVATIONS OF SAME BEFORE BEGINNING CONSTRUCTION. <br /> a. <br /> 0 <br /> 19. ALL EXPOSED SOIL AREAS MUST BE STABILIZED AS SOON AS POSSIBLE TO LIMIT SOIL EROSION BUT IN NO CASE LATER THAN 14 DAYS AFTER <br /> THE CONSTRUCTION AC17VITY IN THAT PORTION OF THE SITE HAS TEMPORARILY OR PERMANENTLY CEASED. z ca m <br /> + <br /> 17. SEDIMENT CONTROL PRACTICES MUST MINIMIZE SEDIMENT FROM ENTERING SURFACE WATERS,INCLUDING CURB AND GUTTER SYSTEMS AND (L (L <br /> STORM SEWER INLETS. Lill 0 0 <br /> 19. SEDIMENT CONTROL PRACTICES MUST BE ESTABLISHED ON ALL DOWNGRADIENT PERIMETERS BEFORE ANY UPGRADIENT LANDDISTURBING 0 0 <br /> ACTTVITIES BEGIN.THESE PRACTICES SHALL REMAIN IN PLACE UNTIL THE WATERSHED DISTRICT HAS DETERMINED THAT THE SITE SOILS HAVE x x <br /> BEEN PERMANENTLY STABILIZED. lv <br /> 0 0 <br /> 19. THE TIMING OF THE INSTALLATION OF SEDIMENT CONTROL PRACTICES MAY BE ADJUSTED TO ACCOMMODATE SHORT-TERM ACTIVITIES SUCH AS <br /> Iff irk <br /> _j <br /> SEDIMENTCONTROL PRACTICES MUSTBE INSTALLED IMMEDIATELY AFTER THE ACTNTY IS COMPLETED.HOWEVER,SEDIMENTCONTROL <br /> CLEARING OR GRUBBING OR PASSAGE OF VEHICLES.ANY SHORT-TERM ACTIVITY MUST BE COMPLETED AS SOON AS POSSIBLE AND THE <br /> APRACTICES MUST BE INSTALLED BEFORE THE NEXT PRECIPITATION EVENT EVEN IF THE ACTIVITY IS NOT COMPLETED. <br /> �1 �A 3�- <br /> f <br /> ALL STORM DRAIN INLETS MUST BE PROTECTED BY SMPS DETERMINED BY THE DISTRICT TO BE APPROPRIATE.DURING CONSTRUCTION UNTIL <br /> 20. _'j-IsV <br /> ALL SOURCES WITH POTENTIAL FOR DISCHARGING TO THE INLET HAVE BEEN STABILIZED. <br /> 21. PIPE OUTLETS MUST BE PROVIDED WITH TEMPORARY OR PERMANENT ENERGY DISSIPATION WITHIN 24 HOURS OF CONNECTION TO A SURFACE rxwox 0 <br /> WATER. (1) <br /> m 'F <br /> 22. INORDER TO MAINTAIN SHEET FLOW AND MINIMIZE RILLS AND GULLIES,THERE SHALL BE NO UNBROKEN SLOPE LENGTH OF GREATER THAN 30 <br /> FEET FOR SLOPES WITH A GRADE OF 3:1 OR STEEPER. Lo <br /> FINJ <br /> Z <br /> 4S < <br /> 0 <br /> <Z� <br /> 1<0 <br /> LLJ <br /> 21 TEMPORARY STOCKPILES MUST HAVE EFFECTIVE SEDIMENT CONTROLS IN PLACE TO PREVENT DISCHARGE TO SURFACE WATERS INCLUDING <br /> CIE' <br /> STORMWATER CONVEYANCES SUCH AS CURB AND GUTTER. <br /> L <br /> 24. VEHICLE TRACKING OF SEDIMENT FROM THE CONSTRUCTION SITE MUST BE MINIMIZED BY BMPS SUCH AS ROCK CONSTRUCTION ENTRANCES, <br /> WASH RACKS OR EQUIVALENT PRACTICES.STREET SWEEPING MUST BE USED IF SUCH EIMPS ARE NOT ADEQUATE TO PREVENT SEDIMENT FROM Tom <br /> 25 50 <br /> BEING TRACKED OFF SITE. ��ORt=SIDINO UPON CONE ON 0A=0TO WIRE��T� 7"1, <br /> —0—TE—Ill. POSTS TH A_ <br /> 26. INLET PROTECTION DEVICES AND ALL PERIMETER CONTROL SHALL BE MAINTAINED ONCE SEDIMENT ACCUMULATES TO A DEPTH 15 OF THE <br /> DESIGNED CAPACITY. <br /> SILT FENCE <br /> &7 L _S <br /> Y-,5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.