Loading...
HomeMy WebLinkAboutMCWD permits MINNEHAHA CREEKWATERSHED DISTRICT QUALITY OF WATER QUALITY OF LIFE Pursuant to Minnesota Statutes Chapter 103D, and on the basis of statements and information contained in the permit application, correspondence, plans, maps, and all other supporting data submitted by the applicant, and made a part hereof by reference, PERMISSION IS HEREBY GRANTED to the applicant named below for use and development of land in the Minnehaha Creek Watershed District. Issued to: Orono ISD #278 Permit No: 17-283 Location: 685 & 765 Old Crystal Bay Road North Orono _ Purpose: Erosion Control, Stormwater Management & Wetland Protection Maintenance Garage Date of Issuance: 08/02/2017 Date of Expiration: 08/02/2018 By Order of the Board of Managers Heidi Quinn Permitting Technician This permit is not transferable without District approval, and is valid to the date of expiration. No activity is authorized beyond the expiration date. If the permittee requires more time to complete the project, an application for renewal of the permit must be received by the District at least 30 days before expiration. The applicant is responsible for compliance with all District Rules and for the action of their representatives, contractors, and employees. Conditions: Project to be completed as described in plans submitted to the MCWD office on July 20th, 2017 according to the provisions of this permit. • Properly install and maintain all required erosion control measures until the disturbed areas are re-stabilized • Notify MCWD in writing upon completing installation of perimeter and sedimentation controls • When the site is re-stabilized and the MCWD staff has performed a final inspection, all silt fences must be removed (Statement concerning fees for inspections, violations, etc... on following page) We collaborate with public and private partners to protect and improve land and water for current and future generations. ....................................................................................................................................................................................... ....................................................................................................................................................................................... ....................................................................................................................................................................................... 15320 Minnetonka Boulevard,Minnetonka,MN 55345 • (952)471-0590 • Fax:(952)471-0682 • www.minnehahacreek.oig 4 MINNEHAHA CREEK WATERSHED DISTRICT QUALITY OF WATER QUALITY OF LIFE Inspection/Analysis/Monitoring Fees A site inspection and monitoring by District staff will be performed where the activity involves. • a commercial/industrial/multi-family residential development • a single family residential development greater than 5 acres or of any size if within the Minnehahe Creek subwatershed • any alteration of a floodplain or wetland • dredging within the beds, banks or shores of any protected water or wetland • a violation • any project which in the judgment of the District staff should be inspected due to project location, scope, or construction techniques In these cases, the applicant shall pay to the District a fee equal to the actual costs of field inspection of the work, including investigation of the area affected by the work, analysis of the work, and any subsequent monitoring of the work, which in the case of a violation shall be at least $35. Standard Fee Schedule District professional staff $ 65.51* District interns $ 40.35* District clerical staff $ 46.69* Consulting Senior Engineer $ contracted rate Consulting Engineer/Technician $ contracted rate District Counsel $ contracted rate Application fee $ 10.00 Copy costs $ .25 + actual staff time Color copy costs $ 1.00 + actual staff time * Hourly We collaborate with public and private partners to protect and improve land and water for current and future generations. 15320 Minnetonka Boulevard,Minnetonka,MN 55345 • (952)471-0590 • Fax:(952)471-0682 • www.minnehahacreek.ori) Orono Hsg Schoci._ • LLQ- _ ` Schum nn G Ei,mentdrycSch Spf o prom P b: E. S _ rono'Gommraity i EdLj,^ on ntema late ' S..hoo 1;:r :SCr-j Oi is r < s ai�,C. ti`r'<i41d'B EfJri ., ls.^.yZ 31 i t t IMPROVING QUALITY OF WATER, QUALITY OF LIFE a Pursuant to Minnesota Statutes Chapter 103D, and on the basis of statements and information contained in the permit application, correspondence, plans, The Minnehaha Creek maps, and all other supporting data submitted by the applicant, and made a part hereof by reference, PERMISSION IS HEREBY GRANTED to the applicant Watershed District is named below for use and development of land in the Minnehaha Creek committed to a Watershed District. leadership role in protecting,improving Issued to: Orono Public Schools Permit No: 09-030 and managing the Location: 765, 685, 770 Old Crystal Bay Rd, Orono surface waters and Purpose: Rule B: Erosion Control: Rule N: Stormwater Management affiliated groundwater resources within the Date of Issuance: 5/28/2009 Date of Expiration: 5/28/2010 District,including their By Order of the Board of Managers relationships to the ecosystems of which Steve Christopher District Technician they are an integral part. We achieve our mission This permit is not transferable without District approval, and is valid to the date of expiration. No activity is authorized beyond the expiration date. If the permittee through regulation, requires more time to complete the project, an application for renewal of the capital projects, permit must be received by the District at least 30 days before expiration. education,cooperative The applicant is responsible for compliance with all District Rules and for the endeavors,and other action of their representatives, contractors, and employees. programs based on Conditions: Project to be completed as described in plans submitted to the MCWD office on April 2, 2009 according to the provisions of this sound science, permit. innovative thinking,an • Properly install and maintain all required MCWD Rule B, erosion control measures until the disturbed areas are informed and engaged restabilized constituency,and the • When the site is restablilized and the MCWD staff has cost effective use of performed a final inspection, all silt fences must be removed public funds. (Statement concerning fees fcr inspections, violations, etc... on following page) 18202 Minnetonka Boulevard,Deephaven,MN 55391 - 952-471-0590 • Fax:952-471-0682 - www.minnehahacreek.org . Now IMPROVING QUALITY OF WATER, QUALITY OF LIFE Pursuant to Minnesota Statutes Chapter 103D, and on the basis of statements and information contained in the permit application, correspondence, plans, The Minnehaha Creek maps, and all other supporting data submitted by the applicant, and made a part hereof by reference, PERMISSION IS HEREBY GRANTED to the applicant Watershed District is named below for use and development of land in the Minnehaha Creek committed to a Watershed District. Leadership rote in Protecting,improving Issued to: Orono Public Schools Permit No: 09-340 and managing the Location: 685 & 795 Old Crystal Bay Road. Orono surface waters and purpose: Rule B: Erosion Control affiliated groundwater resources within the Date of Issuance: 11/25/2009 Date of Expiration: 11/25/2010 District,including their By Order of the Board of Managers relationships to the C--' ecosystems of which Steve Christopher District Technician they are an integral part. We achieve our mission This permit is not transferable without District approval, and is valid to the date of expiration. No activity is authorized beyond the expiration date. if the permittee through regutation, requires more time to complete the project, an application for renewal of the cap italpro�iects permit must be received by the District at least 30 days before expiration. education,cooperative The applicant is responsible for compliance with all District Rules and for the endeavors and other action of their representatives, contractors, and employees. programs based on Conditions: Project to be completed as described in plans submitted to the MCWD office on November 20, 2009 according to the provisions soundscience, of this permit. innovative thinking,an • Properly install and maintain all required MCWD Rule B, erosion control measures until the disturbed areas are informed and engaged restabilized constituency,and the • When the site is restablilized and the MCWD staff has performed a final inspection, all silt fences must be removed cost effective use of public funds. (Statement concerning fees for inspections, violations, etc... on following page) 18202 Minnetonka Boulevard,Deephaven,MN 55391 • 952-471-0590 - Fax:952-471-0682 - www.minnehahacreek.org IMPROVING QUALITY OF WATER, QUALITY OF LIFE Inspection/Analysis/Monitoring Fees The Niinnehaha Creek A site inspection and monitoring by District staff will be performed where the Watershed District is activity involves: committed to a • a commercial/industrial/multi-family residential development leadership role in . a single family residential development greater than 5 acres or of any size if protecting,improving within the Minnehaha Creek subwatershed • any alteration of a floodplain or wetland and managing the . dredging within the beds, banks or shores of any protected water or wetland surface waters and • a violation • any project which in the judgment of the District staff should be inspected affiliated groundwater due to project location, scope, or construction techniques resources within the District,including their In these cases, the applicant shall pay to the District a fee equal to the actual relationships to the costs of field inspection of the work, including investigation of the area affected by the work, analysis of the work, and any subsequent monitoring of the work, ecosystems of which which in the case of a violation shall be at least$35. they are an integral part. We achieve our mission through regulation, Standard Fee Schedule capital projects, District professional staff $ 51.01* District interns $ 31.30* education,cooperative District clerical staff $ 46.09* endeavors,and other Consulting Senior Engineer $ contracted rate Consulting Engineer/Technician $contracted rate programs based on District Counsel $contracted rate soundscience Application fee $ 10.00 Copy costs $ .25 + actual staff time innovative thinking,an Calor copy costs $ 1.00 + actual staff time informed and engaged Audio tapes $ 20.00 each Watershed Plan (Paper) $ cost of production constituency,and the Watershed Plan CD $ 10.00 each cost effective use of C I P $ 10.00 each public funds. * Hourly 18202 Minnetonka Boulevard,Deephaven,MN 55391 • 952-471-0590 • Fax:952-471-0682 • www.minnehahacreek.org NA-HA C MINNERAHA CREEK RS EDBURY u WATERSHED DISTRICT I 92 _ MINry�c 9cy Q�� 14600 Minnetonka Boulevard ��9SHEDD�S� Minnetonka, Minnesota 55345-1597 ;oil office: (612)939-8320 fax:(612)939-8244 LAKE MINNETONKA DISTRICT ADMINISTRATOR:Ellen B.Sones RECEIVED S A ER 94 BOARD OF MANAGERS: Thomas Maple,Jr.,Pres.•C.Woodrow Love•Join E.Thomas Clarkson Lindley•Thomas W.LaBounty•Martha S.Hartfiel•Pamela G.Blixt PERMIT Pursuant to Minnesota Statutes Chapter 103D, and on the basis of statements and information contained in the permit application, correspondence, plans, maps, and all other supporting data submitted by the applicant, all of which are made a part hereof by reference, PERMISSION IS HEREBY GRANTED to the applicant named below for use and development of land in the Minnehaha Creek Watershed District. Issued to: Orono Independent School Permit No. 94-59 District No. 278 Location: City of Orono, T118, R23, Sec. 28, SE 1/4 Purpose: Stormwater management plan and stream crossing involving construction of road and two ball fields. Date of Issuance: Date of Expiration: April 14, 1994 April 14, 1995 By Order of the Board of Managers I � Ellen B. Sones District Administrator This permit is not transferable, and is valid to the date of expiration. No activity is authorized beyond the expiration date. If the permittee requires more time to complete the project, and application for renewal of the permit is required. The applicant is responsible for compliance with all District rules and for the actions of their representatives, contractors, and employees. (Statement concerning fees for inspections, violations, etc. on back of permit. ) Inspection/Analysis/Monitoring Fees A site inspection and monitoring by District staff will be performed where the activity involves: • a commercial/ industrial/multi-family residential development. • a single family residential development greater than 5 acres or of any size if within the Minnehaha Creek subwatershed. • any alteration of a floodplain or wetland. • dredging within the beds, banks or shores of any protected water or wetland. • a violation. • any project which in the judgement of District staff should be inspected due to project location, scope, or construction techniques. In these cases, the applicant shall pay to the District a fee equal to the actual costs of field inspection of the work, including investigation of the area affected by the work, analysis of the work, and any subsequent monitoring of the work, which in the case of a violation shall be at least $35 . Standard Fee Schedule (hourly rate) * District Engineer: $115 District Counsel: 125 District Coordinator: 40 *As of March 1, 1993 , subject to change MAY-28-2009 13:25 P.02i02 a �,�,� , � a •,�y ,��� 'fit+ n b"�: ; ,p F; � IMPROVING QUALITY OF WATER, QUALITY OF LIFE Pursuant to Minnesota Statutes Chapter 103D, and on the basis of statements and information contained in the permit application, correspondence, plans, The Minnehaha Creek maps, and all other supporting data submitted by the applicant, and made a part hereof by reference, PERMISSION IS HEREBY GRANTED to the applicant Watershed District is named below for use and development of land in the Minnehaha Creek committed to a Watershed District. leadership role in protecting,improving Issued to: Orono Public Schools Permit No: 09-030 and managing the Location: 765 685 770 Old Crystal Bay Rd, Orono surface waters and purpose: Rule B: Erosion Control• Rule N: Stormwater Management affiliated groundwater Date of Issuance: 5/28/2009 Date of Expiration, 5/28/2010 resources within the District,including their By Order of the Board of Managers relationships to the K.�~ ecosystems of which Steve Christopher District Technician they are an integral part. We achieve our mission This permit is not transferable without District approval, and is valid to the date of expiration. No activity is authorized beyond the expiration date. If the permittee through regulation, requires more time to complete the project, an application for renewal of the capital projects, permit must be received by the District at least 30 days before expiration. education,cooperative The applicant is responsible for compliance with all District Rules and for the endeavors,and other action of their representatives, contractors, and employees. programs based on Conditions: Project to be completed as described in plans submitted to the MCWD office on April 2, 2009 according to the provisions of this sound science, permit. innovative thinking,an Properly install and maintain all required MCWD Rule B, erosion control measures until the disturbed areas are informed and engaged restabillzed constituency,and the When the site is restablilized and the MCWD staff has performed a final inspection, all silt fences must be removed cost effective use of public funds. (Statement concerning fees for inspections, violations, etc___ on following page) TOTAL P.02 MAY-28-2009 13:25 P.01/02 4 Minnehaha CleequWatershed District Improving Quality of Water,Quality of Life Established in 1967 The Minnehalta Creek FAX MEMO Watershed District is r F committed to a leadership role in Phone #: 952.471.0590 protecting,improving, and managing the Fax #: 952.471.0682 surface waters and affiliated groundwarer resources within the DATE: District,including their relationships to the TO. nuenkp ecosystems of which rhey 6MAA.&, are an integral part, through regulation, capital projects, education,cooperative FROM: endeavors,and other programs based onLcd RE: l .. sound science, innovative chinking,an . � Z informed and engaged # of pa ges including cover: ^. constituency,and the costeoctive use of public Message: fitndL 18201 Minnetonka Boulevard,Doephaven ftnesota 55391 Phone:952.471.090 Fax 952.471.0882 www.mimehahaereetor0 NOV-25-2009 09:56 ++ P.02/02 owl ` IMPROVING QUALITY OF WATER, QUALITY OF LIFE I I Pursuant to Minnesota Statutes Chapter 103D, and on the basis of statements and information contained in the permit application, correspondence, plans, The Minnehaha Creek maps, and all other supporting data submitted by the applicant, and made a part hereof by reference, PERMISSION IS HEREBY GRANTED to the applicant Watershed District is named below for use and development of land in the Minnehaha Creek committed to a Watershed District. leadership role in prol ecting,improving Issued to: Orono Public Schools Perms No: 09-340 nd managing theLocation: 885 &795 Old Crystal Bay Road, Orono urtao waters and Pumose! Rule B: Erosion Control affli atedlroundwater Date of Issuance: 11/25/2009 Date of Expiration: 11/25/2010 re Vurce S within the Di in uding their By Order of the Board of Managers r tatioi ships to the El syst ms of which Steve Christopher District Technician .they a an+egral part. We thieve ourmission This permit is not transferable without District approval, and is valid to the date of expiration. No activity is authorized beyond the expiration date. If the permittee rough regulation, requires more time to complete the project, an application for renewal of the capital projects, permit must be received by the District at least 30 days before expiration. edu 2tion,cooperative The applicant is responsible for compliance with all District Rules and for the action of their representatives, contractors, and employees. et deavors,and other progra based on Conditions: Project to be completed as described in plans submitted to the MCWD office on November 20, 2009 according to the provisions so dsai nce, of this permit. inn vative�hinkirlg,an 0 Properly install and maintain all required MCWD Rule B, erosion.control measures until the disturbed areas are in prmedd engaged restabilized wnstitfe cy,agldthe * When the site is restabiilized and the MCWD staff has performed a final inspection, all silt fences must be removed cost ative7e of ublic nds. (Statement concerning fees for inspections, violations, etc... on following page) uuVA10M . nc-2 om-riaOA CnvOr.9.A71-nF.A7 . www.minnRhAhOtreelLOrtl TOTAL P.02 443 Lafayette Road N. MINNESOTA DEPARTMENT OF (651)284-5005 St. Paul, Minnesota 55155 1-800-DIAL-DLI www.dii.mn.gov LABOR & INDUSTRY TTY: (651)297-4198 Amk PROJECT JURISDICTION AGREEMENT BUILDING OFFICIAL: Date: 7/21/2010 City of Orono Building Official ��� Lyle Edward Oman 22410 2750 Kelley Pkwy Orono, MN 55356 C/�'OFCRCNO Project: ISD 278 Orono 3 Schools Roof Rehabilitation Location: Long Lake, MN 55356 Address: 685 Old Crystal Bay Rd State Plan Review Number: BLD1007-00099 Date Received: 6/16/2010 Dear Building Official: Attached is a copy of the notice to the Architect/Designer of the project described above as to the agreement reached between the Minnesota Construction Codes and Licensing Unit and Long Lake delegation building code administration to your office as per our agreement on this project. Yours truly, CONSTRUCTION CODES AND STANDARDS Jerry Norman, Supervisor Building Plan Review GN:mw ENC This information can be provided to you in alternative formats(Braille,large print or audio). An Equal Opportunity Employer