Loading...
HomeMy WebLinkAbout2010-00130 - land alteration CITY OF ORONO PERMIT NO.: 2010-00130 2750 KELLEY PARKWAY ` ORONO,MN 55356- DATE ISSUED: 05/03/2010 952 249-4600 FAX: 952 249-4616 ADDRESS : 685 OLD CRYSTAL BAY RD N PIN : 33-118-23-21-0002 LEGAL DESC : UNPLATTED 33 118 23 : LOT 000 BLOCK 000 PERMIT TYPE : USER DEFINED PROPERTY TYPE : INSTITUTIONAL-SCHOOL CONSTRUCTION TYPE : LAND ALTERATION(0-500 CU YDS) NOTE: THIS PERMIT IS FOR 685,705 AND 765 OLD CRYSTAL BAY ROAD N PARKING/DRIVING AREA RECONSTRUCTION(WEST SIDE) APPLICANT LAND ALTERATION 50.00 SCHOOLS,ORONO PUBLIC TOTAL 50.00 765 OLD CRYSTAL BAY RD N LONG LAKE,MN 55356- PAID WITH CC# 6592 OWNER SCHOOLS,ORONO PUBLIC 765 OLD CRYSTAL BAY RD N LONG LAKE,MN 55356- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the State Building Code.This permit may be :&24at an ti f r due cause. S / 3 //V Applicant Permitee Signature Date Issued B Signature Date SEPARATE PERMITS REQUIRED FOR WORK OTHPR THAN DESCRIBED ABOVE. UCity of Orono FOR CITY USE ONLY 3� Box 66 P.O. 0- 0 Date Received: 3 5 10 Permit# ��` 2750 Kelley Parkway a ,> Crystal Bay,MN 55323 Amount: $ C.U.P Filed: (952)249-4600 $ D« Approved By: �'_/[ Site Plan: �" Iv Recommends: Approval [ Denial❑ Or- J-e t 55vte/ C 7 CITY OF ORONO - USER DEFINED/GENERAL PERMIT (All permits must be approved by the Building Official and/or Zoning Department) Job Site/Owner Information:` Site Address: 5c� s S}-n Owner: OYCwlC) SCC 0 S Mailing Address: S C)�a C 3 r-*,j Rel �✓ City: _Cwt.ct �A to— Zip: SS 3ls Cncj►►ne2r: J U hn# 4 iA4-1 1�u e S wlAh Home Phone: A#erng Phone: -7(,o3- s,-fq- j I z q \\ s44- 0531 Contractor/App.: Contact Person: Address: State License#: City: Zip: Expiration Date: Phone: Alternate Phone: TYPES OF USER DEFINED PERMITS j ❑ Stairway to Lake ❑ Retaininiz Walls ❑ Temporary Trailer General-User Defined Surcharge General-User Defined Surcharge General-User Defined * (Per UBC) * (Per UBC) * $30.00 *Estimated Cost: $ *Estimated Cost: $ ❑ Docks-One Time(Non-Lake Mtka) Land Alteration ❑ Zoning Review General-User Defined Surcharge General-User Defined General-User Defined ❑ Commercial-(Per UBC) 0-500 Cubic Yards *ForO-75'Zone-$30.00 *Estimated Cost: $ $50.00(Needs Site Plan) General-User Defined ❑ 501+Cubic Yards ❑ Residential- $30.00 $50.00(Needs C.U.P.) PAY kt vl . (JYtu lvtI PO-4 22 co 1-%'tv-61 v\ ❑ Tree Removal General-User Defined *Within 0-75' -$30.00 I herby apply for a User Defined Permit and I acknowledge that the information above is complete and accurate; that the work will be in conformance with the Ordinances and Codes of the City and with the State Building Code;that I understand this is not a permit and work is not to start without a permit;and that the work will be in accordance with the approved plan. Applicant Date (User Defined Pemvt 05103/09) 2335 Highway 36 W St.Paul,MN 55113 Tel651-636-4600 Fax 651-636-1311 www.bonestroo.com March 15, 2010 Bonestroo Evelyn Turner Planner City of Orono Post Office Box 66 Crystal Bay, MN 55323 Re: 635-705-765 Old Crystal Bay Road File No. 000139-10000-2 File No. 2010-00130 Dear Evelyn: We have reviewed the plans for the proposed driveway and parking area reconstruction at the Orono Schools. The plans are dated 1-12-10. We have the following comments with regards to engineering matters: • The grading, storm sewer, and pavement area improvements are acceptable from an engineering standpoint. • This project will disturb more than 100 CY of material. Sediment and erosion control information meeting the requirements of Orono's City Code 79-7(c)(2) must be submitted. The minimum $2000 sediment and erosion control financial security should be required of the owner for this permit. If you have any questions, please call me at(651) 604-4894 or send an email to darren.amundsen@bonestroo.com. Yours very truly, Darren Amundsen Cc: Melanie Curtis Tom Kellogg John Smyth • o City of Orono FOR CITY USE ONLY P.O.Box 66 Date Received: Permit 2750 Kelley Parkway i ,'• iF Crystal Bay,MN 55323 ,, ` (952)249-4600 Amount: $ C.U.P Filed: Approved By: Site Plan: Recommends: Approval ❑ Denial CITY OF ORONO-USER DEFINED/GENERAL PERWT (All permits must be approved by the Building Official and/or Zoning Department) Jab Site fi Owner informations Site Address: 685 Old Crystal Bay Road Owner: Orono Public Schools Mailing Address: 685 Old Crystal Bay Rd. City: Long Lake Zip. 55356 Home Phone: Alternate Phone: t mtractor/Applicant Infos€ Cation: Contractor/App.: Contact Person:Minnesota Roadways Co. Tom Underdahl Address: 4370 Valley Indust. Blvd. So. State License#: N/A City: Shakopee Zip. 55379 Expiration Date: Phone: (952)496-2651 Alternate Phone: TYPESOF USER DEFRAW � " ✓ ❑ Stairwav to Lake ❑ Retaining;Walls ❑ Temporary Trailer General—User Defined Surcharge General—User Defined Surcharge General—User Defined *(Per UBC) *(Per UBC) *$30.00 *Estimated Cost:$ *Estimated Cost:$ ❑ Docks—One Time(von-Lake Mtka) ❑ Land Alteration ❑ Zoning Review General—User Defined Surcharge General—User Defined General—User Defined ❑ Commercial—(Per UBC) 8 0-500 Cubic Yards *For0-75'Zone-$30.00 *Estimated Cost:$ $50.00(Needs Site Plan) General—User Defined ❑ 501+Cubic Yards ❑ Residential- $30.00 $50.00(Needs C.U.P.) ❑ Tree Removal General—User Defined *Within 0-75'-$30.00 I herby apply for a User Defined Permit and I acknowledge that the information above is complete and accurate;that the work will be in conformance with the Ordinances and Codes of the City and with the State Building Code;that I understand this is not a permit and work is not to start without a permit;and that the work will be in accordance with the approved plan. 04/16/10 Applicant Date lRB>Fttl t of m tt r t epi 05ma j