HomeMy WebLinkAboutRe: as-built r—,Va & 1 DATE TIME
CItY OF 6RONO CALLED IN
INSPECTION NOTICE SCHEDULED
PERMIT NO. ZO W-04551 COMPLETED %�wz ,!
ADDRESS 3-(50 Na(ihei✓t bc-
OWNER TELEPHONE NO.
CONTRACTOR ],
DESCRIPTION
W ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL
Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING
y ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL
Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ PROGRESS
❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
W ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ HARD COVER REMOVAL
J ❑ DEMO-SITE ❑ SEPTIC INSTALL ❑ FOUNDATION/REMOVAL
2 OWNERICONTRACTOR TO MEET YOU:_YES_NO
COMMENTS:
W
a
o ''V; L v v rd
Q C
& i
° lc1
W °
cc
Q
2
W
z
W
QC
d
W ❑WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
QC ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
W
O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
C.1 BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. El PHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (952) 249-4600
Owner/Contract site:
Inspector.
White Copynnspectoes File Canary Copy/Site Notice
r
Christine Mattson
From: Adam Edwards
Sent: Friday, September 25, 2015 4:21 PM
To: Christine Mattson
Subject: RE: 3740 &3750 Northern Avenue
Chris,
They both look okay. Will need an inspector to complete a site inspection.
Adam
From:Christine Mattson
Sent: Friday,September 25, 2015 3:55 PM
To:Adam Edwards<aedwards@ci.orono.mn.us>
Subject:3740&3750 Northern Avenue
Adam,
Please review and provide comments. Thank you.
From: Mark [mailto:marke@eronbereassoc.coml
Sent: Friday,September 25, 2015 3:38 PM
To:Christine Mattson<CMattson@ci.orono.mn.us>
Subject: Lots 1 and 2, Northern Oaks
Here are the as-builts with more information.We will drop off full size copies.
1
. f
1
City of Orono
°Nor
Hardcover Calculation osheet
\� z Property Address: a'?.S" � �1'�`�* AV F I
`�MBFHU�'t� Prepared by: Date:
Stormwater Quality Overlay District Tier: (Circle one) Tier 1 Tier 2 (E31Tier 4 Tier 5
Step 1: EXISTING HARDCOVER
In the following table identify all items of existing hardcover on the property,keyed by letter to Certificate
of Survey(survey must accompany this form). Use as many lines as necessary to accurately depict
existing hardcover status of the property. For Tier 1 properties,Identify any features by letter which are
split at the 75' setback line and calculate hardcover square footage separately for each Portion.
Key to Hardcover Item (Describe) Length x Width Total
SurveyS are Feet
(Example) lura e: QES:F;
A S.F.
B S.F.
C 133,
S.F.
D S.F.
E YJ S.F.
F 8® �® -f S.F.
G S.F.
H S.F.
t S.F.
S.F.
K S.F.
L S.F.
M S.F.
N S.F.
0 -S.F.
P S.F.
Q S.F.
R S.F.
S S.F.
T -S.F.
U S.F.
V S.F.
W S.F.
X S.F.
Y S.F.
Z S.F.
9 Total Existing Hardcover .S' S.F.
fxclulc]. . : �1d + 5 + -=fit
� . SF
m o�
31 S.F.
S.F.
S.F.
S.F.
2 Total Excludable Hardcover S.F.
3 Net Existing Hardcover Subtract line 2 from line 1 S.F.
4 Total Lot Area atif. 93,e S.F.
Existing Hardcover percentage 1(3)+(4) ] 12. 91
(Proposed Hardcover next page)
3150 Nof Uft h'c-
January8,201.3 7n*„ M551
ids-Lui ti' KO&W