Loading...
HomeMy WebLinkAboutsoil observation notes t HA U G Q Page of Daily Soil Observation Notes Project No: ) — e `C�` Date: —� �—�/ � R,eppo�No: Project Nam 73 ' StiQ*'t'..Dr- Project Location: YC�►�, Clien • SO Temp/Weather: .�3c7 +�� •�� t^^ Project Mana Time Arrived: Departed: Areas Observed: ❑Building Pad House Pad O Roadway ❑ Parking/Walks ❑ Footing ❑ Proof Roll ❑ Other(describer Soil report available? ❑ Yes No Report reviewed? ❑ Yes No Report prepared by: Benchmark: Benchmark evaluation: Benchmark provided by: Finish floor evaluation: Bottom of footing elevation: Bottom of excavation elevation: Approved plans available? Specified compaction: Fill source: Oversizing appears adequate ❑ NA Yes ❑ No Soils observed agree with Soils report? ❑ Yes ❑ No Soils appear adequate for design loads? Yes CDNo Proposed project bearing capacity(psf): Contractor notified of results? Yes ❑ No Name of person notified: Was a copy of this report left on site? Yes ❑ No If so,whom was it submitted to? Notes/Comments:'4'-)E�- C n"ol K Yh.Q-�— oy- c't 0, Performed By: ' ! Reviewed By: Date: This is a preliminary report and is provide ely as evidence that field observations and/or testing was performed.Observations and/or conclusions and/or recommendation conveyed in the final report may vary from,and shall take precedence over,those indicated in a preliminary report. t AUGO P—a row I Oro NZIMUMIN Report of Field Compaction Tests Project No.:13-185 Project Title:4731 North Shore Dr.Client:Colson Custom Homes Technician:M.Shumaker Test No. 1 2 3 4 Probe Depth 12" 12" 12" 12" Wet Density 122.4 120.8 121.9 122.2 c Moisture ( c 9.1 1 8.1 1 7.7 7.9 Gauge Serial No.:38433 ®Nuclear Method ASTM D 2922-81 ®Standard Proctor ASTM D 698-00 '' ❑Sand Cone Method ASTM D 1556-82 ❑Modified Proctor ASTM D 1557-00 Test Date Soil ID Classification Optimum Max.Lab In Place In Place Compaction Specified Comments No. No. Moisture Dry Density Moisture Dry (%) Compaction (%) (pco (%) Density (%) c 1 4/17/13 P-1 SP-SM 9.8 114.3 8 113 99 95 A 2 4/17/13 P-1 SP-SM 9.8 114.3 7 112 98 95 A 3 1 4/17/13 P-1 SP-SM 9.8 114.3 7 114 100 95 A 4 4/17/13 P-1 SP-SM 9.8 114.3 7 114 100 95 A Test Location: Elevation No. 1 4731 North Shore Drive,28'S 10'E of NW Pad Corner(Building Pad Fill 963 2 4731 North Shore Drive,25'S 12'E of NW Pad Corner(Building Pad Fill 965 3 4731 North Shore Drive,28'S 14'E of NW Pad Corner(Building Pad Fill 967 4 4731 North Shore Drive,16'S 23'E of NW Pad Corner(Building Pad Fill 967 A. Test results comply with specifications. B. Test results do not comply with specifications. Paul Haugo President FA H A u G ® Version 4-5-09 Daily Soil Observation Notes Project No: 13-185 Date:4-16-13 Project Name:4135 North shore dr Project Location: Orono,MN Client:Colson Custom Homes Temp/Weather:35 clear Project Manager:Haugo Time Arrived: Departed: Areas Observed: []Building Pad ®House Pad ❑Roadway ❑Parking/Walks ❑ Footing ❑Proof Roll ❑Other(describe): Soil report available? ❑ Yes NNo Report reviewed? ❑Yes NNo Report prepared by: Benchmark: Benchmark evaluation: Benchmark provided by: Finish floor evaluation: Bottom of footing elevation: Bottom of excavation elevation: Approved plans available? N Yes ❑No Specified compaction: Fill source: Oversizing appears adequate? ❑NA N Yes ❑No Soils observed agree with Soils report? ❑Yes [-]No Soils appear adequate for design loads? NYes ❑No Proposed project bearing capacity(psf):2000 Contractor notified of results? NYes ❑No Name of person notifled:Ben Was a copy of this report left on site? ❑Yes N No If so,whom was it submitted to? Notes/Comments:Observed excavation for above house. Excavation bottom soils consist of naturally occuring clay till soils.The walkout footing will on natural soils,except where a cistern was located on the west side of the basement and removed. Imported silty sand will be used as backfill.Bottom soils approved for fill placement Performed By:Paul Haugo Reviewed By: Date: This is a preliminary report and is provided solely as evidence that field observations and/or testing was performed.Observations and/or conclusions and/or recommendation conveyed In the final report may vary from,and shall take precedence over,those indicated In a preliminary report.