Daily Soil Observation Notes
Project No: ) — e `C�` Date: —� �—�/ � R,eppo�No:
Project Nam 73 ' StiQ*'t'..Dr- Project Location: YC�►�,
Clien • SO Temp/Weather:
.�3c7 +�� •�� t^^
Project Mana Time Arrived: Departed:
Areas Observed: ❑Building Pad House Pad O Roadway ❑ Parking/Walks ❑ Footing
❑ Proof Roll ❑ Other(describer
Soil report available? ❑ Yes No Report reviewed? ❑ Yes No Report prepared by:
Benchmark: Benchmark evaluation: Benchmark provided by:
Finish floor evaluation: Bottom of footing elevation: Bottom of excavation elevation:
Approved plans available? Specified compaction: Fill source:
Oversizing appears adequate ❑ NA Yes ❑ No Soils observed agree with Soils report? ❑ Yes ❑ No
Soils appear adequate for design loads? Yes CDNo Proposed project bearing capacity(psf):
Contractor notified of results? Yes ❑ No Name of person notified:
Was a copy of this report left on site? Yes ❑ No If so,whom was it submitted to?
Notes/Comments:'4'-)E�- C n"ol K
Yh.Q-�— oy- c't 0,
Performed By: ' ! Reviewed By: Date:
This is a preliminary report and is provide ely as evidence that field observations and/or testing was performed.Observations and/or conclusions and/or
recommendation conveyed in the final report may vary from,and shall take precedence over,those indicated in a preliminary report.
t
AUGO
P—a row I Oro
NZIMUMIN
Report of Field Compaction Tests
Project No.:13-185 Project Title:4731 North Shore Dr.Client:Colson Custom Homes Technician:M.Shumaker
Test No. 1 2 3 4
Probe Depth 12" 12" 12" 12"
Wet Density 122.4 120.8 121.9 122.2
c
Moisture ( c 9.1 1 8.1 1 7.7 7.9
Gauge Serial No.:38433
®Nuclear Method ASTM D 2922-81 ®Standard Proctor ASTM D 698-00 ''
❑Sand Cone Method ASTM D 1556-82 ❑Modified Proctor ASTM D 1557-00
Test Date Soil ID Classification Optimum Max.Lab In Place In Place Compaction Specified Comments
No. No. Moisture Dry Density Moisture Dry (%) Compaction
(%) (pco (%) Density (%)
c
1 4/17/13 P-1 SP-SM 9.8 114.3 8 113 99 95 A
2
4/17/13 P-1 SP-SM 9.8 114.3 7 112 98 95 A
3 1 4/17/13 P-1 SP-SM 9.8 114.3 7 114 100 95 A
4 4/17/13 P-1 SP-SM 9.8 114.3 7 114 100 95 A
Test Location: Elevation
No.
1 4731 North Shore Drive,28'S 10'E of NW Pad Corner(Building Pad Fill 963
2 4731 North Shore Drive,25'S 12'E of NW Pad Corner(Building Pad Fill 965
3 4731 North Shore Drive,28'S 14'E of NW Pad Corner(Building Pad Fill 967
4 4731 North Shore Drive,16'S 23'E of NW Pad Corner(Building Pad Fill 967
A. Test results comply with specifications.
B. Test results do not comply with specifications.
Paul Haugo
President
FA
H A u G ® Version 4-5-09
Daily Soil Observation Notes
Project No: 13-185 Date:4-16-13
Project Name:4135 North shore dr Project Location: Orono,MN
Client:Colson Custom Homes Temp/Weather:35 clear
Project Manager:Haugo Time Arrived: Departed:
Areas Observed: []Building Pad ®House Pad ❑Roadway ❑Parking/Walks ❑ Footing
❑Proof Roll ❑Other(describe):
Soil report available? ❑ Yes NNo Report reviewed? ❑Yes NNo Report prepared by:
Benchmark: Benchmark evaluation: Benchmark provided by:
Finish floor evaluation: Bottom of footing elevation: Bottom of excavation elevation:
Approved plans available? N Yes ❑No Specified compaction: Fill source:
Oversizing appears adequate? ❑NA N Yes ❑No Soils observed agree with Soils report? ❑Yes [-]No
Soils appear adequate for design loads? NYes ❑No Proposed project bearing capacity(psf):2000
Contractor notified of results? NYes ❑No Name of person notifled:Ben
Was a copy of this report left on site? ❑Yes N No If so,whom was it submitted to?
Notes/Comments:Observed excavation for above house. Excavation bottom soils consist of naturally occuring clay till
soils.The walkout footing will on natural soils,except where a cistern was located on the west side of the basement and
removed. Imported silty sand will be used as backfill.Bottom soils approved for fill placement
Performed By:Paul Haugo Reviewed By: Date:
This is a preliminary report and is provided solely as evidence that field observations and/or testing was performed.Observations and/or conclusions and/or
recommendation conveyed In the final report may vary from,and shall take precedence over,those indicated In a preliminary report.