HomeMy WebLinkAboutAs-Built Survey OSON0 p_0(1,(-1- - - 20 i 5- --- C) ( 3 2 8
y
�(4 A'Estt OSkE` City of Orono Septic Asbuilt Form
Address 7 V Z-64.he VI e i p!�r- _� Building Use
Installer .4 S Sv\-5 License # z_,6 L(e) Date s • a 0 /6.
Septic Tanks ( 3 oo / / 3 oo /405Fro Pump Tank 7300
System Type 41 ❑II ❑III ❑Mound ❑Trenches ❑Pressure Bed ❑Other
Draw detailed diagram with measurements indicating distances to tank risers using 2 points from a permanent
structure. Show location of drop boxes and length of trenches.
J v
S , k,)-t,
L_L ,c,,,,,,, -
R 3
'OE LV-
a 0
411111
A l'
,
= 5 Z '
l r = 54"
i' 121 ( Z= 6 b
cocriv
x-
a)
c5.
v
R-
a)
V
� � DATE TIME
CITY OF ORONO CALLED IN
INSPECTION TI' SCHEDULED �
PERMIT NO. � — �� � COMPLEfED,� �
ADDRESS ��� �" t�Nt e K/' /'ar+���
OWNER TELEPHONE NO.
CONTRACTOR
� DESCRIPTION
t~y ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL
Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING
O ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑TREE REMOVAL
Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS
� ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
W BUILT-SURVEY ❑ SEWERHOOK-UP ❑ FOUNDATION/REMOVAL
❑ DEMO-SITE ❑ SEPTIC INSTALL
Z OWNERICONTRACTOR TO MEET 1f�U:_YES_NO
� COMMENTS:
4+ l l'�' t//�p4¢� ' �G C�.�' �r�+�
�
oc� c� '�l �t� '�!�1 Pr
�.
a�
0
W
�
Q
�
W
�
W
�
j
4�j ❑WORKSATISFACTORY:PROCEED ❑PROJECT COMPLETE
� ❑CORRECT WORK&PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY
W
O ❑(�RRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERINCa PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑pH0T0 TAKEN
INSPECTOR WILL RETURN ❑CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Cau for the next inspection 2a hours in advance. (952) 249-4600
OwnerlContra site:
.
Inspeotor:
White CopYllnsPector's File Canary CopylSite Notiee
c 1
Melanie Curtis
From: Melanie Curtis
Sent: Tuesday,July 05, 2016 2:40 PM
To: 'Ethan Kindseth'
�c: 'Bryan Voit'; Christine Mattson
Subject: RE:795 Lakeview Parkway
Ethan
Please provide a full-sized copy. We will now inspect the site to confirm.
Comments from our engineer:
The as-built appears to conform to the intent of the approved plan. An inspector should conduct a site visit and confirm
the following:
1. The survey accurately depicts conditions on the ground.
2. The site is stabilized to the point the any remaining erosion control can be removed.
Melanie Curtis
�'952.249.4627 �mcurtisCa�ci.orono.mn.us
From:Christine Mattson
Sent:Thursday,June 30, 2016 2:36 PM
To: 'Bryan Voit'<Bvoit@sathre.com>; 'Ethan Kindseth'<ekindseth@gonyeahomes.com>
Cc: Melanie Curtis<MCurtis@ci.orono.mn.us>
Subject: RE: 795 Lakeview Parkway
Bryan,
Thank you for the quick response. I'll send the electronic copy to our engineer for review. If he has no comments,
concerns or changes,we will need a full-size copy for our records.We will keep you posted.
Chris^'
From: Bryan Voit[mailto:Bvoit@sathre.com]
Sent:Thursday,June 30,2016 2:12 PM
To:Christine Mattson<CMattson@ci.orono.mn.us>; 'Ethan Kindseth'<ekindseth@�onveahomes.com>
Cc: Melanie Curtis<MCurtis@ci.orono.mn.us>
Subject: RE: 795 Lakeview Parkway
Christine,
Attached is the PDF of the grading asbuilt survey and hard cover sheet. Let me know if this works.
From: Christine Mattson [mailto:CMattson@ci.orono.mn.us]
Sent: Thursday, June 30, 2016 2:08 PM
To: 'Ethan Kindseth'; Bryan Voit
Cc: Melanie Curtis
Subject: RE: 795 Lakeview Parkway
1