Loading...
HomeMy WebLinkAboutMCWD permits r � . ; � MINNEHAHA CREEK ;�„ WATERSHED DISTRICT QUALITY OF WATER ` QUALITY OF LIFE Pursuant to Minnesota Statutes Chapter 103D, and on the basis of statements and information contained in the permit application, correspondence, plans, Ehe r��nnehaha�reel< maps, and all other supporting data submitted by the applicant, and made a part hereof by reference, PERMISSION IS HEREBY GRANTED to the applicant Watershed Distric'c;s named below for use and development of land in the Minnehaha Creek Watershed District. cQmmitted to a�eaderstiip role in pro��cting, Issued to: Chris Twome rL Permit No: 10-248 impro��ng and n;anag?rig the surface waters ard Location: 4415 North Shore Dr, Orono aft;tiated groundvrater Purpose: Erosion Control & Floodplain Alteration — Boat House resources��ith;n the Date of issuance: 08/25/2010 Date of Ex iration: 08/25/2011 District,incE�iding tlieir By rd r of t Bo rd of Managers relationships to the ecosystems of which Catherine Bac they are an integra�part. District Technician We achieve our missioi� This permit is not transferable without District approval, and is valid to the date of expiration. No activity is authorized beyond the expiration date. If the permittee throug��reguLation, requires more time to complete the project, an application for renewal of the cap�tat pro�ects, permit must be received by the District at least 30 days before expiration. educat�an,cooperativE The applicant is responsible for compliance with all District Rules and for the endeavors,and otl�er action of their representatives, contractors, and employees. programs basea a�� Conditions: Project to be completed as described in plans submitted to the MCWD office on August 23, 2010 and August 25, 2010 according sound scier�ce, to the provisions of this permit. inr�ovative thinkiny, ar • Properly install and maintain all required erosion control measures until the disturbed areas are re-stabilized intormed and engaged • When the site is re-stabilized and the MCWD staff has performed a final inspection, all silt fences must be removed constituency,and the cost effective use of nf,b�,c funds. (Statement concerning fees for inspections, violations, etc... on following page) 18202 Minnetonka Boulevard, Deephaven, MN 55391 • Office: (952) 471-0590• Fax: (952) 471-0682 •www.minnehahacreek.org r .*d. MINNEHAHA CREEK � WATERSHED DISTRlCT QUALITY OF WATER QUALITY OF LIFE Inspection/AnalvsislMonitorina Fees The Minnehaha Creek A site inspection and monitoring by Districf staff will be pertormed where the Watershed District is activity involves: committed to a teadership � a commercial/industrial/multi-family residential development role in protefing, • a single family residential development greater than 5 acres or of any size if within the Minnehaha Creek subwatershed improving and managing . any alteration of a floodplain or wetland the surFace waters and • dredging within the beds, banks or shores of any protected water or wetland • a violation affiliated groundwater . any project which in the judgment of the District staff should be inspected resources w�fhin the due to project location, scope, or construction techniques District,including their In these cases, the applicant shall pay to the District a fee equal to the actual relationships to the costs of field inspection of the work, including investigation of the area affected ecosystems of which by the work, analysis of the work, and any subsequent monitoring of the work, which in the case of a violation shall be at least$35. they are an integral part. We achieve our mrssion through regulation, Standard Fee Schedule capital projects, District professional staff $ 55.79* District intems $ 34.24* educat;on,coaperative District clerical staff $ 50.40* endeavars,and ather Consulting Senior Engineer $ contraated rate Consulting Engineer/Technician $ contracted rate programs based on District Counsel $ contracted rate sound science, Application fee $ 10.00 Copy costs $ .25 + actual staff time innovative thinking,an Color copy costs $ 1.00 + actual stafF time Audio tapes $ 20.OQ each informed and engaged Watershed Plan (Paper) $ cost of production constituency,and the Watershed Plan CD $ 10.00 each CIP $ 10.00 each cost effective use of pub[ic funds. * Houriy 18202 Minnetonka Boulevard, Deephaven,MN 55391•Office:(952)471-0590• Fax: (952)471-0682•vuwvu.minnehahacreek.org , MINNEHAHA CREEK � WATERSHED DISTRICT QUALITY OF WATER '^�` QUALITY OF LIFE Pursuant to Minnesota Statutes Chapter 103D, and on the basis of statements and information contained in the permit application, correspondence, plans, The Minnehaha Creek maps, and all other supporting data submitted by the applicant, and made a part hereof by reference, PERMISSION IS HEREBY GRANTED to the applicant WateRhed District is named below for use and development of land in the Minnehaha Creek Watershed District. committed tu a leadership role in protecting, Issued to: Chris Twomey Permit No: 11-022 improving and managing the surface waters and Location: 4415 North Shore Drive, Orono affiliated groundwater Purpose: Erosion Control — Single Familv Home resources within the Date of Issuance: 2/3/2011 Date of Ex iration: 2/3/2012 Distrid,induding their By Or the ard f Managers retationships to the ecosystems of which Cathe �ne Bach tt,ey are an irrtegrat part. District Technician We achieve our mission This permit is not transferable without District approval, and is valid to the date of expiration. No activity is authorized beyond the expiration date. If the permittee through regu(at;or,, requires more time to complete the project, an application for renewal of the capital projects, permit must be received by the District at least 30 days before expiration. education,cooperat;�e The applicant is responsible for compliance with all District Rules and for the endeavors, and other action of their representatives, contractors, and employees. progrdms based on Conditions: Project to be completed as described in plans submitted to the MCWD office on February 3, 2011 according to the provisions of sound science, this permit. innovative thinking,an • Properly install and maintain all required erosion control measures until the disturbed areas are re-stabilized infurmed and engaged • When the site is re-stabilized and the MCWD staff has performed a final inspection, all silt fences must be removed constituency,and the cost effective use of publ;c fur,ds. (Statement concerning fees for inspections, violations, etc... on following page) 18202 Minnetonka Boulevard, Deephaven, MN 55391 •Office: (952)471-0590• Fax: (952) 471-0682 �www.minnehahacreek.org MINNEHAHA CREEK � WATERSHED DISTRICT QUALITY OF WATER "�"`- QUALITY OF LIFE Inspection/Analvsis/Monitorinq Fees The Minnehaha Creek A site inspection and monitoring by District staff will be performed where the Watershed District is activity involves: committed to a lea�rship � a commercial/industrial/multi-family residential development rote in protecting, • a single family residential development greater than 5 acres or of any size if within the Minnehaha Creek subwatershed improving and managing . any alteration of a floodplain or wetland the surface waters and � dredging within the beds, banks or shores of any protected water or wetland • a violation affiliated groundwater . any project which in the judgment of the District staff should be inspected resources within the due to project location, scope, or construction techniques District,inctuding their In these cases, the applicant shall pay to the District a fee equal to the actual relationships to the costs of field inspection of the work, including investigation of the area affected ecosystemsofwhich by the work, analysis of the work, and any subsequent monitoring of the work, which in the case of a violation shall be at least $35. they are an integral part. We achieve our mission through regulation, Standard Fee Schedule capitat projecrs, District professional staff $ 55.79* District interns $ 34.24* education,cooperati�e District clerical staff $ 50.40" endeavors,and other Consulting Senior Engineer $ contracted rate Consulting Engineer/Technician $ contracted rate programs based on District Counsel $ contracted rate Application fee $ 10.00 sound sdence, Copy costs $ .25 + actual staff time innovative thinking, a� Color copy costs $ 1.00 + actual staff time Audio tapes $ 20.00 each informed and engaged Watershed Plan (Paper) $ cost of production constituency,and the Watershed Plan CD $ 10.00 each CIP $ 10.00 each CoSt effeCtive use oi public funds. * Hourly 18202 Minnetonka Boulevard, Deephaven, MN 55391 • Office: (952) 471-0590• Fax: (952) 471-0682 • www.minnehahacreek.org . , -� MINNEHAHA CREEK � WATERSHED DISTRICT QUALITY OF WATER QUALITY OF LIFE Pursuant to Minnesota Statutes Chapter 103D, and on the basis of statements and information contained in the permit application, correspondence, plans, The Minnehaha Creek maps, and all other supporting data submitted by the applicant, and made a part hereof by reference, PERMISSION IS HEREBY GRANTED to the applicant Watershed District is named below for use and development of land in the Minnehaha Creek committed to a leadership Watershed District. role in protecting, improving and managing Issued to� Chris Twomev Permit No:_13-434 the surFace waters and Location: 4415 North Shore Dr. Orono affiLiated groundwater Purpose� Shoreline Protection — Rip Rap 30' resources within the Date of Issuance: 11/1/2013 Date of Ex iration: 11/1/2014 District,including their By Order of the Board of Managers relationships to the � � ��� ecosystems of which Brandon Wisner they are an integral part. District Technician We achieve our mission This permit is not transferable without District approval, and is valid to the date of through regulation, expiration. No activity is authorized beyond the expiration date. If the permittee requires more time to complete the project, an application for renewal of the capital projects, permit must be received by the District at least 30 days before expiration. education,cooperative The applicant is responsible for compliance with all District Rules and for the endeavors,and other action of their representatives, contractors, and employees. programs based on Conditions: Project to be completed as described in plans submitted to the MCWD office on October 18, 2013 according to the provisions of saund science, this permlt. innovative thinking, an • Properly install and maintain all required erosion control measures until the disturbed areas are re-stabilized informed and engaged . When the site is re-stabilized and the MCWD staff has constituency,and the performed a final inspection, all silt fences must be removed cost effefive use of pubtic fi,nds. (Statement concerning fees for inspections, violations, etc... on following page) 15320 Minnetonka Boulevard, Minnetonka, MN 55345•Office: (952) 471-0590• Fax: (952)471-0682•www.minnehahacreek.org v . , MINNEHAHA CREEK VIIATERSHED DISTRICT QUALITY OF WATER QUALITY OF LIFE Inspection/Analvsis/Monitorins� Fees The Minnehaha Creek A site inspection and monitoring by District staff avdl be pertormed where the activity involves: Watershed District is committed to a leadership • a commercialrndustriaUmulti family residential development • a single family residential development greater than 5 acres or of any size if rote in protecting, within the Minnehaha Creek subwatershed • any alteration of a floodplain or wetland improving and managing � dredging within the beds, banks or shores of any protected water or wetland the surface waters and • a violation • any project which in the judgment of the District staff should be inspected due affiliated groundwrater to project location, scope, or construcfion techniques resources within the 6istrict,including their In these cases, the applicant shall pay to the District a fee equal to the actual rela�o►uhips to the costs of field inspection of the work, including investigation of the area affected by the work, analysis of the wrork, and any subsequent monitoring of the work, ecosystems of which which in the case of a violation shali be at least$35. they are an ir►tegral part. We achieve our mission Standard Fee Schedule through regufation, District professional staff $ 57.74* capital projects, District intems $ 36.44* education,cooperative District clerical staff $ 42.16'* Consulting Senior Engineer $ contracted rate eadeavors,and other Consulting Engineer/Technician� $ contracted rate District Counsel $ contracted rate programs based on Application fee $ 10.00 sound science, Copy costs $ .25 + a�tual staff time Color copy costs $ 1.00+ aatual staff time innovative thinking,an informed and engaged constituency,and the * Hourly cost effective use of pub6cfunds. 15320 Minnetonka Boulevard,Minnetonka,MN 55345•Ofiice: (952)471-0590• Fax:(952)471-Ub82•wfaw.minnehahacreek.org Z g-��o C ITY OF ORONO � ,� �„ Street Addresr. Mailing Address: Telephone(952)249-4600 '��, Gti 2750 Kelley Parkway I P.O.Box 66 I Fax (952)249-4616 t,,q �, Orono,MN 55356 Crystal Bay,MN 55323 www.ci.orono.mn.us kEsxo� November 6,2013 Chris Twomey 4415 North Shore Drive Wayzata, MN 55391 � Dear Mr.Twomey: We have been informed by the Minnehaha Creek Watershed District that you intend to install riprap on your property at 4415 North Shore Drive. Because riprap is often part of a larger project,we want to alert you to some related City code provisions so you can avoid the hassle and expense of obtaining an after-the-fact permit or even having to undo some of the work. With few exceptions, including riprap and lakeshore steps, City code prohibits the installation of impervious surFaces within 75 feet of the lake. Any sort of fabric is considered impervious. This means that riprap rock may be extended farther than allowed by the riprap permit but no fabric may be installed under it. The following activities require a permit from the City: • Any earth movement outside the area where the rip rap will be placed • Replacement of retaining walls and/or installation of new retaining walls within 75 feet of the lake(regardless of the height of the walls) • Construction or replacement of lakeshore steps • Removal of trees(dead or alive)six inches in diameter or larger within 75 feet of the lake • Removal of vegetation on any slope writhin 75 feet of the lake that is too steep to easily walk • Removal of vegetation or trimming of trees larger than six feet to provide a view of the lake from the house • Total or near total removai of vegetation within 75 feet of the lake not part of another permit A tree removal permit can be arranged by calling 952-249-4600. For the other permits your contractor must submit a permit application and plans for review. Additional information can be found at the City website, www.ci.orono.mn.us. If you have any questions feel free to contact me at cmattsonna.ci.orono.mn.us or at 952-249-4620. Sincerely, CITY OF ORONO � � Christine Mattson Planning Assistant cc: Concept Landscaping, 3153 Priest Lane, Mound, MN 55364