HomeMy WebLinkAboutMCWD permits r � .
; �
MINNEHAHA CREEK ;�„ WATERSHED DISTRICT
QUALITY OF WATER ` QUALITY OF LIFE
Pursuant to Minnesota Statutes Chapter 103D, and on the basis of statements
and information contained in the permit application, correspondence, plans,
Ehe r��nnehaha�reel< maps, and all other supporting data submitted by the applicant, and made a part
hereof by reference, PERMISSION IS HEREBY GRANTED to the applicant
Watershed Distric'c;s named below for use and development of land in the Minnehaha Creek
Watershed District.
cQmmitted to a�eaderstiip
role in pro��cting,
Issued to: Chris Twome rL Permit No: 10-248
impro��ng and n;anag?rig
the surface waters ard Location: 4415 North Shore Dr, Orono
aft;tiated groundvrater Purpose: Erosion Control & Floodplain Alteration — Boat House
resources��ith;n the Date of issuance: 08/25/2010 Date of Ex iration: 08/25/2011
District,incE�iding tlieir
By rd r of t Bo rd of Managers
relationships to the
ecosystems of which Catherine Bac
they are an integra�part. District Technician
We achieve our missioi� This permit is not transferable without District approval, and is valid to the date of
expiration. No activity is authorized beyond the expiration date. If the permittee
throug��reguLation, requires more time to complete the project, an application for renewal of the
cap�tat pro�ects, permit must be received by the District at least 30 days before expiration.
educat�an,cooperativE The applicant is responsible for compliance with all District Rules and for the
endeavors,and otl�er action of their representatives, contractors, and employees.
programs basea a�� Conditions: Project to be completed as described in plans submitted to the
MCWD office on August 23, 2010 and August 25, 2010 according
sound scier�ce, to the provisions of this permit.
inr�ovative thinkiny, ar • Properly install and maintain all required erosion control
measures until the disturbed areas are re-stabilized
intormed and engaged • When the site is re-stabilized and the MCWD staff has
performed a final inspection, all silt fences must be removed
constituency,and the
cost effective use of
nf,b�,c funds. (Statement concerning fees for inspections, violations, etc... on following page)
18202 Minnetonka Boulevard, Deephaven, MN 55391 • Office: (952) 471-0590• Fax: (952) 471-0682 •www.minnehahacreek.org
r .*d.
MINNEHAHA CREEK � WATERSHED DISTRlCT
QUALITY OF WATER QUALITY OF LIFE
Inspection/AnalvsislMonitorina Fees
The Minnehaha Creek
A site inspection and monitoring by Districf staff will be pertormed where the
Watershed District is activity involves:
committed to a teadership � a commercial/industrial/multi-family residential development
role in protefing, • a single family residential development greater than 5 acres or of any size if
within the Minnehaha Creek subwatershed
improving and managing . any alteration of a floodplain or wetland
the surFace waters and • dredging within the beds, banks or shores of any protected water or wetland
• a violation
affiliated groundwater . any project which in the judgment of the District staff should be inspected
resources w�fhin the due to project location, scope, or construction techniques
District,including their
In these cases, the applicant shall pay to the District a fee equal to the actual
relationships to the costs of field inspection of the work, including investigation of the area affected
ecosystems of which by the work, analysis of the work, and any subsequent monitoring of the work,
which in the case of a violation shall be at least$35.
they are an integral part.
We achieve our mrssion
through regulation, Standard Fee Schedule
capital projects, District professional staff $ 55.79*
District intems $ 34.24*
educat;on,coaperative District clerical staff $ 50.40*
endeavars,and ather Consulting Senior Engineer $ contraated rate
Consulting Engineer/Technician $ contracted rate
programs based on District Counsel $ contracted rate
sound science, Application fee $ 10.00
Copy costs $ .25 + actual staff time
innovative thinking,an Color copy costs $ 1.00 + actual stafF time
Audio tapes $ 20.OQ each
informed and engaged Watershed Plan (Paper) $ cost of production
constituency,and the Watershed Plan CD $ 10.00 each
CIP $ 10.00 each
cost effective use of
pub[ic funds.
* Houriy
18202 Minnetonka Boulevard, Deephaven,MN 55391•Office:(952)471-0590• Fax: (952)471-0682•vuwvu.minnehahacreek.org
,
MINNEHAHA CREEK � WATERSHED DISTRICT
QUALITY OF WATER '^�` QUALITY OF LIFE
Pursuant to Minnesota Statutes Chapter 103D, and on the basis of statements
and information contained in the permit application, correspondence, plans,
The Minnehaha Creek maps, and all other supporting data submitted by the applicant, and made a part
hereof by reference, PERMISSION IS HEREBY GRANTED to the applicant
WateRhed District is named below for use and development of land in the Minnehaha Creek
Watershed District.
committed tu a leadership
role in protecting,
Issued to: Chris Twomey Permit No: 11-022
improving and managing
the surface waters and Location: 4415 North Shore Drive, Orono
affiliated groundwater Purpose: Erosion Control — Single Familv Home
resources within the Date of Issuance: 2/3/2011 Date of Ex iration: 2/3/2012
Distrid,induding their
By Or the ard f Managers
retationships to the
ecosystems of which Cathe �ne Bach
tt,ey are an irrtegrat part. District Technician
We achieve our mission This permit is not transferable without District approval, and is valid to the date of
expiration. No activity is authorized beyond the expiration date. If the permittee
through regu(at;or,, requires more time to complete the project, an application for renewal of the
capital projects, permit must be received by the District at least 30 days before expiration.
education,cooperat;�e The applicant is responsible for compliance with all District Rules and for the
endeavors, and other action of their representatives, contractors, and employees.
progrdms based on Conditions: Project to be completed as described in plans submitted to the
MCWD office on February 3, 2011 according to the provisions of
sound science, this permit.
innovative thinking,an • Properly install and maintain all required erosion control
measures until the disturbed areas are re-stabilized
infurmed and engaged • When the site is re-stabilized and the MCWD staff has
performed a final inspection, all silt fences must be removed
constituency,and the
cost effective use of
publ;c fur,ds. (Statement concerning fees for inspections, violations, etc... on following page)
18202 Minnetonka Boulevard, Deephaven, MN 55391 •Office: (952)471-0590• Fax: (952) 471-0682 �www.minnehahacreek.org
MINNEHAHA CREEK � WATERSHED DISTRICT
QUALITY OF WATER "�"`- QUALITY OF LIFE
Inspection/Analvsis/Monitorinq Fees
The Minnehaha Creek
A site inspection and monitoring by District staff will be performed where the
Watershed District is activity involves:
committed to a lea�rship � a commercial/industrial/multi-family residential development
rote in protecting, • a single family residential development greater than 5 acres or of any size if
within the Minnehaha Creek subwatershed
improving and managing . any alteration of a floodplain or wetland
the surface waters and � dredging within the beds, banks or shores of any protected water or wetland
• a violation
affiliated groundwater . any project which in the judgment of the District staff should be inspected
resources within the due to project location, scope, or construction techniques
District,inctuding their
In these cases, the applicant shall pay to the District a fee equal to the actual
relationships to the costs of field inspection of the work, including investigation of the area affected
ecosystemsofwhich by the work, analysis of the work, and any subsequent monitoring of the work,
which in the case of a violation shall be at least $35.
they are an integral part.
We achieve our mission
through regulation, Standard Fee Schedule
capitat projecrs, District professional staff $ 55.79*
District interns $ 34.24*
education,cooperati�e District clerical staff $ 50.40"
endeavors,and other Consulting Senior Engineer $ contracted rate
Consulting Engineer/Technician $ contracted rate
programs based on District Counsel $ contracted rate
Application fee $ 10.00
sound sdence, Copy costs $ .25 + actual staff time
innovative thinking, a� Color copy costs $ 1.00 + actual staff time
Audio tapes $ 20.00 each
informed and engaged Watershed Plan (Paper) $ cost of production
constituency,and the Watershed Plan CD $ 10.00 each
CIP $ 10.00 each
CoSt effeCtive use oi
public funds.
* Hourly
18202 Minnetonka Boulevard, Deephaven, MN 55391 • Office: (952) 471-0590• Fax: (952) 471-0682 • www.minnehahacreek.org
. , -�
MINNEHAHA CREEK � WATERSHED DISTRICT
QUALITY OF WATER QUALITY OF LIFE
Pursuant to Minnesota Statutes Chapter 103D, and on the basis of statements
and information contained in the permit application, correspondence, plans,
The Minnehaha Creek maps, and all other supporting data submitted by the applicant, and made a part
hereof by reference, PERMISSION IS HEREBY GRANTED to the applicant
Watershed District is named below for use and development of land in the Minnehaha Creek
committed to a leadership Watershed District.
role in protecting,
improving and managing
Issued to� Chris Twomev Permit No:_13-434
the surFace waters and Location: 4415 North Shore Dr. Orono
affiLiated groundwater Purpose� Shoreline Protection — Rip Rap 30'
resources within the Date of Issuance: 11/1/2013 Date of Ex iration: 11/1/2014
District,including their
By Order of the Board of Managers
relationships to the �
� ���
ecosystems of which
Brandon Wisner
they are an integral part. District Technician
We achieve our mission This permit is not transferable without District approval, and is valid to the date of
through regulation, expiration. No activity is authorized beyond the expiration date. If the permittee
requires more time to complete the project, an application for renewal of the
capital projects, permit must be received by the District at least 30 days before expiration.
education,cooperative The applicant is responsible for compliance with all District Rules and for the
endeavors,and other action of their representatives, contractors, and employees.
programs based on Conditions: Project to be completed as described in plans submitted to the
MCWD office on October 18, 2013 according to the provisions of
saund science, this permlt.
innovative thinking, an • Properly install and maintain all required erosion control
measures until the disturbed areas are re-stabilized
informed and engaged . When the site is re-stabilized and the MCWD staff has
constituency,and the performed a final inspection, all silt fences must be removed
cost effefive use of
pubtic fi,nds. (Statement concerning fees for inspections, violations, etc... on following page)
15320 Minnetonka Boulevard, Minnetonka, MN 55345•Office: (952) 471-0590• Fax: (952)471-0682•www.minnehahacreek.org
v . ,
MINNEHAHA CREEK VIIATERSHED DISTRICT
QUALITY OF WATER QUALITY OF LIFE
Inspection/Analvsis/Monitorins� Fees
The Minnehaha Creek A site inspection and monitoring by District staff avdl be pertormed where the
activity involves:
Watershed District is
committed to a leadership • a commercialrndustriaUmulti family residential development
• a single family residential development greater than 5 acres or of any size if
rote in protecting, within the Minnehaha Creek subwatershed
• any alteration of a floodplain or wetland
improving and managing � dredging within the beds, banks or shores of any protected water or wetland
the surface waters and • a violation
• any project which in the judgment of the District staff should be inspected due
affiliated groundwrater to project location, scope, or construcfion techniques
resources within the
6istrict,including their In these cases, the applicant shall pay to the District a fee equal to the actual
rela�o►uhips to the costs of field inspection of the work, including investigation of the area affected
by the work, analysis of the wrork, and any subsequent monitoring of the work,
ecosystems of which which in the case of a violation shali be at least$35.
they are an ir►tegral part.
We achieve our mission Standard Fee Schedule
through regufation,
District professional staff $ 57.74*
capital projects, District intems $ 36.44*
education,cooperative District clerical staff $ 42.16'*
Consulting Senior Engineer $ contracted rate
eadeavors,and other Consulting Engineer/Technician� $ contracted rate
District Counsel $ contracted rate
programs based on Application fee $ 10.00
sound science, Copy costs $ .25 + a�tual staff time
Color copy costs $ 1.00+ aatual staff time
innovative thinking,an
informed and engaged
constituency,and the * Hourly
cost effective use of
pub6cfunds.
15320 Minnetonka Boulevard,Minnetonka,MN 55345•Ofiice: (952)471-0590• Fax:(952)471-Ub82•wfaw.minnehahacreek.org
Z
g-��o
C ITY OF ORONO
� ,� �„ Street Addresr. Mailing Address: Telephone(952)249-4600
'��, Gti 2750 Kelley Parkway I P.O.Box 66 I Fax (952)249-4616
t,,q �, Orono,MN 55356 Crystal Bay,MN 55323 www.ci.orono.mn.us
kEsxo�
November 6,2013
Chris Twomey
4415 North Shore Drive
Wayzata, MN 55391 �
Dear Mr.Twomey:
We have been informed by the Minnehaha Creek Watershed District that you intend to install riprap on your
property at 4415 North Shore Drive. Because riprap is often part of a larger project,we want to alert you to some
related City code provisions so you can avoid the hassle and expense of obtaining an after-the-fact permit or even
having to undo some of the work.
With few exceptions, including riprap and lakeshore steps, City code prohibits the installation of impervious
surFaces within 75 feet of the lake. Any sort of fabric is considered impervious. This means that riprap rock may
be extended farther than allowed by the riprap permit but no fabric may be installed under it.
The following activities require a permit from the City:
• Any earth movement outside the area where the rip rap will be placed
• Replacement of retaining walls and/or installation of new retaining walls within 75 feet of the lake(regardless of the
height of the walls)
• Construction or replacement of lakeshore steps
• Removal of trees(dead or alive)six inches in diameter or larger within 75 feet of the lake
• Removal of vegetation on any slope writhin 75 feet of the lake that is too steep to easily walk
• Removal of vegetation or trimming of trees larger than six feet to provide a view of the lake from the house
• Total or near total removai of vegetation within 75 feet of the lake not part of another permit
A tree removal permit can be arranged by calling 952-249-4600. For the other permits your contractor must
submit a permit application and plans for review. Additional information can be found at the City website,
www.ci.orono.mn.us.
If you have any questions feel free to contact me at cmattsonna.ci.orono.mn.us or at 952-249-4620.
Sincerely,
CITY OF ORONO
�
�
Christine Mattson
Planning Assistant
cc: Concept Landscaping, 3153 Priest Lane, Mound, MN 55364