HomeMy WebLinkAbout2015-01006 - escrow fee ,, ,�, CITY OF ORONO * Z p� 1 5 — 0 1 P1 0 6 *
2750 KELLEY PARKWAY DATE ISSUED: 08/07/2015
ORONO,NIN 55356-
952 249-4600 FAX: 952 249-4616
ADDRESS : 4205 NORTH SHORE DR
PIN : 07-117-23-43-0004
LEGAL DESC : ORCHARD BEACH
: LOT 002 BLOCK 000
PERMIT TYPE : ESCROW FEE-TIED TO BUILDING PERMIT
PROPERTY TYPE : RESIDENTIAL
CONSTRUCTION TYPE : ESCROW FEE-TIED TO BUILDING PERMIT
NOTE: THIS$700 ESCROW IS TIED TO BUILDING PERMIT-2015-00928
APPLICANT ESCROW FEE-BUILDING 700.00
KOEHLER,TIMOTHY&DANIELLE TOTAL 700.00
Payment(s)
4205 NORTH SHORE DR CHECK 1230 700.00
MOUND,MN 55364
OWNER
KOEHLER,TIMOTHY&DANIELLE
4205 NORTH SHORE DR
MOLJND,MN 55364
AGREEMENT AND SWORN STATEMENT
The work for which this permit is issued shall be performed according to
the approved plans and specifications,applicable City approvals,and the
State Building Code. This permit is for only the work described and does
not grant permission for additional or related work which requires separate
permits. All provisions of laws and ordinances goveming this type of work
shall be compied wiffi whether or not specified herein.This permit will
expire and become null and void if construction authorized is not
commenced within 180 days of the date of issuance,or if construction is
suspended for a period of 180 days at any time after work has commenced.
The applicant is responsible for assuring all required inspections are
requested in conformance with the State Building Code.This permit may be
revoked at any time for due cause.
/ /
Applicant Permitee Signature Date Issued By Signahue Date
w : ' +
BUILDING PERMIT ESCROW AGREEMENT
Orono Building Permit#2015-00928
AGREEMENT made this�day of �a �� , 20_, by and between the CITY OF ORONO,
a Minnesota municipal corporation ("City")and Timothy Koehler("Owners°).
Recitals
1. A building permit application has been filed for a deck and screen porch below located at
4205 North Shore Drive the ("Subject Property"), legally described as That part of Lot 2 "Orchard Beach", lying
Southeaster�y of the following described line and its Northeasterly extension; Commencing at the Northeast comer of Lot
3, "Orchard Beach°;thence on an assumed bearing of North along the Northerly extension of the East line of said Lot 3 a
distance of 78.92 fee� thence on a bearing of West a distance of 89.50 feet to the point of beginning of the line l�ing
described;thence South 31 degree 56 minutes 53 seconds West to the southwesterly line of said Lot 2 and there ending.
Subject to the easement for County State Aid Highway No. 19 as shown in Hennepin County Highway Plat No. 50
r�ordetl as CR Doc.No.4746024.
Subject to a perpetual easement for underground utility purposes in favor of the City of Orono as contain� in CR Doc.
No. 3925296.
2. Owners request the City to review this application.
3. The City will commence its review of the application and incur costs associated with said review
only if the Owner establishes an escrow to ensure reimbursement to the City of its costs.
NOW THEREFORE,THE PARTIES AGREE AS FOLLOWS:
1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow
Agreement, the Owners shall deposit $700 with the City. All accrued interest, if any, shall be paid to the City to
reimburse the City for its cost in administering the escrow account.
2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City
for all out-of-pocket costs the City has incurred (including planning, engineering, in excess of $500, or legal
consultant review) or will incur in reviewing the plan. Eligible expenses shall be consistent with expenses the
Owners would be responsible for under a building permit application. The escrow will also guarantee
reimbursement to the City for all out-of-pocket costs the City has incurred to assure that the work is completed in
accordance with the Stormwater Pollution Prevention Plan and the provisions of Orono City Code Chapter 79.
The financial security may also be used by the City to eliminate any hazardous conditions associated with the
work and to repair any damage to public property or infrastructure that is caused by the work(including planning,
engineering, or legal consultant review) associated with building permit #2015-00928 if compliance with the
approved building permit is not accomplished.
3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will in turn
send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners'
receipt of bill.
4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make payment
to the City within the timeframe outlined in#3 above, shall issue a Stop Work Order until the Owners pay all expenses
invoiced pursuant to #3. The City may draw from the escrow account without further approval of the Owners to
reimburse the City for eligible expenses the City has incurred.
5. CLOSING ESCROW. The Balance on deposit in the escrow, if any, shall be retumed to the
Owners when the review has been completed and written notification is received from the Owners requesting the
funds.
Page 1 of 2
� _J
BUILDING PERMIT ESCROW AGREEMENT
Orono Building Permit#2015-00928
6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners,or if the eligible expenses
incurred by the Ciiy exceed the amount in escrow, the City shall have the right to certify the unpaid balance to the
subject property pursuant to Minn. Stat. §§415.01 and 366.012.
CITY: CITY OF ORONO �LI�L�R:
By: C'g��� �. � � �,�-
�ts: � Y1 c� 1.�rC�yV7"
�eria��:t�.,,,�.�r���`��� ��.��,-�J t�,�to�i����..�tt��c�k►v�, t�t��l't�nr�t�;�� .�I��c�pry:���.��
Page 2 of 2