Loading...
HomeMy WebLinkAboutflood zone info 0�4A��Fi�, J M Federal Emergency Management Agency x ,� °��, �, Washington, D.C. 20472 j'�ND Sti�' March 23,2016 MR.VLADIMIR SIVRIVER CASE NO.: 16-OS-3097A EDS,INC. 6480 WAYZATA BLVD COMMUNITY: CITY OF ORONO,HENNEPIN MINNEAPOLIS,MN 55426 COUNTY,MINNESOTA COMMiJNITY NO.: 270178 DEAR MR. SIVRIVER: This is in reference to a request that the Federal Emergency Management Agency (FEMA) determine if the property described in the enclosed document is located within an identified Special Flood Hazard Area, the area that would be inundated by the flood having a 1-percent chance of being equaled or exceeded in any given year (base flood), on the effective National Flood Insurance Program (NFIP) map. Using the information submitted and the effective NFIP map, our determination is shown on the attached Letter of Map Amendment (LOMA) Determination Document. This determination document provides additional information regarding the effective NFIP map, the legal description of the property and our determination. Additional documents are enclosed which provide information regarding the subject property and LOMAs. Please see the List of Enclosures below to determine which documents are enclosed. Other attachments specific to this request may be included as referenced in the Determination/Comment document. If you have any questions about this letter or any of the enclosures, please contact the FEMA Map Assistance Center toll free at (877) 336-2627 (877-FEMA MAP) or by letter addressed to the Federal Emergency Management Agency, Attn: North Wind Resource Partners (NWRP) eLOMA Coordinator, NWRP eLOMA Coordinator, 3601 Eisenhower Ave., Alexandria, VA 22304-6439, Fax: 703-751-7415. " Sincerely, �_ � __ ' - J -��... ��''� . . `1 Luis Rodriguez,P.E., Chief Engineering Management Branch Federal Insurance and Mitigation Administration LIST OF ENCLOSURES: LOMA DETERMINATION DOCUMENT(REMOVAL) cc: State/Commonwealth NFIP Coordinator Community Map Repository Region Page 1 of 5' Date: March 23, 2016 Case No.: 16-05-3097A LOMA JFCA��F,L� �'��° Federal Emergency Management Agency °���� Washington, D.C. 20472 �EC��"�ED qNp SE LETTER OF MAP AMENDMENT ^ - DETERMINATION DOCUMENT (REMOVAL) ���' �F �RO COMMUNITY AND MAP PANEL INFORMATION LEGAL PROPERTY DESCRIPTION CITY OF ORONO, HENNEPIN Lot 7, Block 2, Baldur Park, as described in the Quit Claim Deed recorded COUNTY, MINNESOTA as Document No. A9528684, in the Office of the Recorder, Hennepin COMMUNITY County, Minnesota COMMUNITY NO: 270178 AFFECTED NUMBER: 27053C0303E MAP PANEL DATE: 9/2/2004 FLOODING SOURCE: NORTH ARM; LAKE PPROXIMATE LATITUDE 8 LONGITUDE OF PROPERTY:44.951181,-93.615164 MINNETONKA OURCE OF LAT 8 LONG:HTTP://MYNASADATA.NASA.GOV DATUM:NAD 83 DETERMINATION OUTCOME 1%ANNUAL LOWEST LOWEST WHATIS CHANCE ADJACENT LOT LOT BLOCK/ SUBDIVISION STREET REMOVED FROM FLOOD FLOOD GRADE ELEVATION SECTION ZONE ELEVATION ELEVATION (NGVD 29) THE SFHA (NGVD 29) (NGVD 29) 7 2 Baldur Park 3580 North Shore Structure X -- 937.5 feet -- Drive (unshaded) Special Flood Hazard Area (SFHA) - The SFHA is an area that would be inundated by the flood having a 1-percent chance of being equaled or exceeded in any given year(base flood). ADDITIONAL CONSIDERATIONS(Please refer to the appropriate section on Attachment 1 for the additional considerations listed below.) eLOMA DETERMINATION This document provides the Federal Emergency Management Agency's determination regarding a request for a Letter of Map Amendment for the property described above. Using the information submitted and the effective National Flood Insurance Program (NFIP) map, we have determined that the structure(s) on tne property(ies) is/are not to:,ated in the S�HA, an area inundated by the flood having a 1-percent chance of being equaled or exceeded in any given year (base flood). This document amends the effective NFIP map to remove the subject property from the SFHA located on the effective NFIP map; therefore, the Federal mandatory flood insurance requirement does not apply. However, the lender has the option to continue the flood insurance requirement to protect its financial risk on the loan. A Preferred Risk Policy (PRP) is available for buildings located outside the SFHA. Information about the PRP and how one can apply is enclosed. This determination is based on the flood data presently available. If there are any errors on this eLOMA Determination Letter that cause FEMA to rescind and/or nullity the determination the property owner should consult the Licensed Professional that submitted this eLOMA. The enclosed documents provide additional information regarding this determination. If you have any questions about this document, please contact the FEMA Map Assistance Center toll free at (877) 336-2627(877-FEMA MAP) or by letter addressed to the Federal Emergency Management Agency, Attn: North Wind Resource Partners (NWRP) eLOMA Coordinator,3601 Eisenhower Avenue,Alexandria,VA 22304-4605,Fax:703-751-7415. Luis Rodriguez,P.E.,Chief Engineering Management Branch eLOMA Federal Insurance and Mitigation Administration Page 2 of;s Date: 3/23/2016 Case No: 16-05-3097A LOMA �O�4p��F � � Federal Emergency Management Agency �. � Washington,D.C. 20472 `�t�+xn sE�g LETTER OF MAP AMENDMENT DETERMINATION DOCUMENT (REMOVAL) ATTACHMENT 1 (ADDITIONAL CONSIDERATIONS) Structure Removal: The following considerations may or may not apply to the determination for your Structure: PORTIONS OF THE PROPERTY REMAIN IN THE FLOODWAY - A portion of this property is located within the National Flood Insurance Program (NFIP) regulatory floodway for the flooding source indicated on the Determination Document while the subject of this determination is not. The NFIP regulatory floodway is the area that must remain unobstructed in order to prevent unacceptable increases in base flood elevations. Therefore, no construction may take place in a NFIP regulatory floodway that may cause an increase in the base flood elevation. The NFIP regulatory floodway is provided to the community as a tool to regulate floodplain development. Modifications to the NFIP regulatory floodway must be accepted by both the Federal Emergency Management Agency (FEMA) and the community involved. Appropriate community actions are defined in Paragraph 60.3(d) of the NFIP regulations. Any proposed revision to the NFIP regulatory floodway must be submitted to FEMA by community officials. The community should contact either the Regional Director (for those communities in Regions I-IV), or the Regional Engineer (Region V) for guidance on the data which must be submitted for a revision to the NFIP regulatory floodway. PORTIONS OF THE PROPERTY REMAIN IN THE SFHA -This Determination Document has removed the subject of the determination from the Special Flood Hazard Area (SFHA). However, portions of the property may remain in the SFHA. Therefore, any future construction or substantial improvement on the property remains subject to Federal, State/Commonwealth, and local regulations for floodplain management. STUDY UNDERWAY - This determination is based on the flood data presently available. However, the Federal Emergency Management Agency may be currently revising the National Flood Insurance Program (NFIP) map for the community. New flood data could be generated that may affect this property. When the new NFIP map is issued it will supersede this determination. The Federal requirement for the purchase of flood insurance will then be based on the newly revised NFIP map. EXTRATERRITORIAL JURISDICTION - The subject of the determination is shown on the National Flood Insurance Program map and may be located in an Extraterritorial Jurisdiction area for the community indicated on the Determination Document. This attachment provides additional information regarding this request. If you have any questions about this attachment, please contact the FEMA Map Assistance Center toll free at (877) 336-2627(877-FEMA MAP) or by letter addressed to the Federal Emergency Management Agency, Attn: North Wind Resource Partners (NWRP) eLOMA Coordinator, NWRP eLOMA Coordinator, 3601 Eisenhower Ave., Alexandria, VA 22304-6439,Fax:703-751-7415 ,C _ _._ - ,, .� �'_� -- _'� > Luis Rodriguez,P.E.,Chief Engineering Management Branch eLOMA Federal Insurance and Mitigation Administration Page 3 of 5► Date: 3/23/2016 Case No: 16-05-3097A LOMA �.°�4A���r �, Federal Emergency Management Agency • Washington,D.C.20472 x � o���',ND S6�'J? LETTER OF MAP AMENDMENT DETERMINATION DOCUMENT (REMOVAL) ATTACHMENT 1 (ADDITIONAL CONSIDERATIONS) GREAT LAKES - The Federal Emergency Management Agency (FEMA) has based this determination on elevation data which is published in the current Flood Insurance Study for the community. However, the elevations established in the U.S. Army Corps of Engineers (USACE) reports on the Great Lakes are the best available data known to us. If in the future there are any subsequent map revisions to the National Flood Insurance Program map and the USACE reports remain the best available data known, FEMA will use those elevations for any such revisions. Further, be advised that the elevations on the Flood Insurance Rate Map (FIRM) may only reflect the Stillwater elevation for the lake and may not account for the effects of wind driven waves or wave run-up. On-site conditions such as wind speed, wind direction, fetch distance, water depth and the slope of the beach or bluff may result in significant increases to the base flood elevation. Therefore, it is strongly recommended that the requestor be aware of these circumstances and, if warranted, evaluate the effects of wind driven waves along the shoreline of the property. STATE AND LOCAL CONSIDERATIONS - Please note that this document does not override or supersede any State or local procedural or substantive provisions which may apply to floodplain management requirements associated with amendments to State or local floodplain zoning ordinances, maps, or State or local procedures adopted under the National Flood Insurance Program. COASTAL BARRIER RESOURCE SYSTEM - The subject of this Determination Document may be located within the Coastal Barrier Resource System (CBRS). Federal financial assistance, including Federal flood insurance, is not available in CBRS areas for new construction or substantial improvements occurring after the date on which the area was declared by Congress to be part of the CBRS or otherwise protected area as required by the Coastal Barrier Resources Act (Public Law 97-348) and the Coastal Barrier Improvement Act 1990(Public Law 101-591). This date is indicated on the National Flood Insurance Program map. For further information on this property and the CBRS or otherwise protected area designation, contact the U.S. Department of the Interior. This attachment provides additional information regarding this request. If you have any questions about this attachment, please contact the FEMA Map Assistance Center toll free at (877) 336-2627(877-FEMA MAP) or by letter addressed to the Federal Emergency Management Agency, Attn: North Wnd Resource Partners (NWRP) eLOMA Coordinator, NWRP eLOMA Coordinator, 3601 Eisenhower Ave., Alexandria, VA 22304-6439,Fax:703-751-7415 { _> _-_ � _,. �;,_ __ _ �y . < -> Luis Rodriguez,P.E.,Chief Engineering Management Branch eLOMA Federal Insurance and Mitigation Administration