HomeMy WebLinkAboutRe: as-built } DATE TIME
CITY OF ORONO CALLED IN
INSPECTION NOTICE SCHEDULED G � -�7
PERMIT NO. Z=`l�r 'C`I b�'Z` coMP�ErE�
ADDRESS q-R� IV�Q(�'�1 /�Y/�1 Ic�,'-
OWNER TELEPHONE NO.
CONTRACTOR
/�� � (
� DESCRIPTION �v �j,(.j l.� �U 1 v Ch.I �� �L���
4~j ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL
Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING
�O ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL
2 ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS
� ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
4i ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL
_
J ❑ DEMO-SITE ❑ SEPTIC INSTALL
Z OWNERICOI�ITRACTOR TO MEEi Y'OU:_YES_NO
y COMMENTS:
� - �2_ �'`�' i i'���S C��1�r��'��5,
�
0
� - ' � � � � �LC �Y� _
� �C G G� �I� � i9�1 �,
OWC � - -
Q (�'/` � '�,t3' .�7L
�
z
�
W
�
�
�
� ❑WORKSATISFACTORY:PROCEED PROJECTCOMPLEfE
W ❑CORRECT WORK 3 PROCEED d �UE CERTIFlCATE OF OCCUPANCY
0 ❑CORRECT NfORK,CALL FOR REtNSPECTION TEMPORARY
V BEFORE CONERING PERMANENT
O CORRECTUNSAFECONDITIONWITHIN HOURS. ❑pHOTOTAKEN
INSPECTOR WILL REfURN
❑STOP ORDER POSTED.CALL INSPECTOR O CITATION ISSUED
❑INSPECTION RE�UIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advanoe. (g52) 249-4600
OwnerlContr�cCo�on site•
Inspector: %� � y �'
� --
WhiM CopYAnspecto�'s Flle Gnary CopYlSib Notice
• 1
Christine Mattson
From: Adam Edwards
Sent: Wednesday,August 30, 2017 2:36 PM
To: Christine Mattson
Subject: RE:495 North Arm Drive/#2016-01030
Chris,
I've reviewed the subject As built.
The as-built appears to conform to the intent of the approved plan.
An inspector should conduct a site visit and confirm the following:
1.The sunrey accurately depicts conditions on the ground.
2.The site is stabilized to the point the any remaining erosion control can be removed.
Adam
From:Christine Mattson
Sent:Wednesday,August 30, 2017 9:38 AM
To:Adam Edwards<aedwards@ci.orono.mn.us> '
Subject: RE:495 North Arm Drive/#2016-01030
We received an as-built survey for 495 North Arm Drive. Please review and provide comments. Thank you!
From:Adam Edwards
Sent:Tuesday,September 20,2016 3:37 PM
To:Christine Mattson<CMattson@ci.orono.mn.us>
Subject: RE:495 North Arm Drive/#2016-01030
Stamped approved
From:Christine Mattson
Sent: Monday,September 19, 2016 9:10 AM
To:Adam Edwards<aedwards@ci.orono.mn.us>
Subject: RE:495 North Arm Drive/#2016-01030
Adam,
We received an updated survey for 495 North Arm Dr. Please review and provide comments.
Chris^'
1
From:Adam Edwards
Sent: Friday,September 02, 2016 2:53 PM
To:Christine Mattson<CMattson@ci.orono.mn.us>
Cc: Roger Peitso<r�eitso@ci.orono.mn.us>
Subject: RE:495 North Arm Drive/#2016-01030
Chris,
I've reviewed the subject plan, stamped it approved with the following questions/comments:
1. The Development grading plan depicts at Swale beginning in the Northwest corner of the property and then
running parallel to the property line just to the south of the property line. This Grading plan does not depict the
swale. Was it constructed? See Image Below.
�-= i � � , � � �
j'"i R� t a� - `,,,�,'° ±,,
t `�� � � �;,�." �, '
�
� � �� f � ,��,..- � �
� � a •` �# �,�'� °��, �
�
�
� ��°� }` �,'� ��
� � � �� n,�� e��� � �� . �'
,� � 'a y� � :�'�. �r � �� � � ;
f
x � �,�. . �'
�,,,�'�'�=W. �:��'�i .�`� `�• ..'�.� �� .
t� ", ' ,�s ,�" � ;�+»
x� " ",, t: �`
�`�� 7*` � � � �.�",
.:- �
d k, �»a�^ ♦ � � . ,�'� � , -,.m.M..« � � ,
' . � ...,� +� ..„� , �.
� � �
. a 1Y 'q� �, -�.,:
� �_�
d _ I`
"`��",�4 �. �� �'^�m,.,.>�.>�,w f� � " . .�...
> .
"� 4 .
� �, � � � �� , 1 . .I��= ���
���� "� . '� �r �d' �,„.� _,�.- �� .}!
�'�� < �� �,�r� � u�� , -^. �
�
� � y��i a• w/' � � w.,, � . �h.
� t �� '�*e - � �" �`�+ , ,�� Y "t �
t �, . �t' . �,°°" ..,M`�� '. . , �.,,:� �t �ti
� * �. „'� ""+� �a/ , , � �S''"" .
��.R+. �.�""°as •R+" /'�." �na, ,- -
� � � � � ��� � �
� f
`w *s. �.-.',«` ; �,_.�w... r��
�� .. � � � �- t>
l� � "w '�a. e` i�� .—+�..;, �
`t�?� . � n^ w �"�, .
-� .
� `.. • ` . . ,=
' m
''s��#� "�•.. "F " .. "*" '?`��'. .�:"' .�� � �.�«„ � �..
2. I believe a driveway culvert will be needed at the connection with the roadway.
3. The Grading plan as an alternate septic site labeled in the Northwest corner but no boundaries depicted. If the
intent is to keep this as an alternate site the site will need to be protected during grading operations.
4. Perimeter sediment control measures should be installed by the Contractor and inspected by the City prior to
any work,including demolition. Contractor must provide minimum 24 hour notice prior to inspection.
Adam
From:Christine Mattson
Sent:Thursday,September 01, 2016 2:03 PM
To:Adam Edwards<aedwards@ci.orono.mn.us>; Roger Peitso<rpeitso@ci.orono.mn.us>
Subject:495 North Arm Drive/#2016-01030
We received a building permit application for a new single family home at 495 North Arm Drive.
Adam has one set of the following:
Survey
Building plans
2
I ' Landscape plan
Roger has the same, plus the rest of the file.
Please review and provide comments.
Thanks!
Christine Mattson
Planning Assistant
City of Orono
2750 Kelley Parkway � Orono � MN � 55356(physica/address)
PO Box 66 I Crystal Bay I MN I 55323-0066(mailing addressJ
'� 952.249.4620 I 8 952.249.4616
� cmattson@ci.orono.mn.us I � www.ci.orono.mn.us
Summer Office Hours: (Monday,May 23 through Friday,September 2,2016)
Monday-Thursday: 7:30 am to 5 pm
Friday: 7:30 am to 11:30 am
OUR OFFICE WILL BE CLOSED: Monday,September 5,2016
3