HomeMy WebLinkAboutSAC info �,�.ti`��. �,����� ���� �s� �-) ����_���u,�-� �� �.�
���� � 9 � �
�
�
IWCC for as- Resldentlal � SAC grandparented into the system re- �ymde 7
�s that are Generally,changes in residential occur in fers to entities that never paid SAC A house(single far�ily dwelling)�ras built and con-
because they were in existence and con- ��to sev„er pna m�s�. in a creda sid,atim
clarfication conjunction wfth a demol'�ion. For ex- � ��ed to sewer at the time the SAC the SAC ie wnsidered paid(one uriQ.
ample,one house is demolished and
another house is built More explanation program was adopted in 1973. The deter-
of demolitions and credits is located in mination for SAC grandparented into the E,umde z
�ns (AddL- the Credit section. � system is done using the current MWCC
established criteria for SAC charges A restaurent seating BO vras in ebstence in 1973
use or based on the sVudure as it existed in (i o SAC uniu),and in i ses rtis resuurant pa;d
iether or not An example of where a redetertni�ation �973 hre(sJ ur��s ot Snc t«a ao seac e�g,ans�on.
,C detertni- would be required without a demolition is � Credit would be allowed for a totsl ot 15 SAC
etimes,this if a la�ge house is divided'Into two dwell- units. This is the same detertnination that would
A minimum of one SAC credit will be al- p�,,,ade m couecc snC on a resraurarrt seaong
atlon,simply ing units. The SAC redetermination � lowed by simply proving the building �Zo
AC determi- should be triggered by the building permit existed in 1973 and was conneded to
�e, issued for the remodeling. At that time, sewer. Records such as architectural
the new determination is made and the � floor plans,water records,and some- Exeme/e2a
ggered by additional amount of SAC due is remitted
to the MWCC on the monthly report of times even photographs can be used to Suppose in tr,e above emrnpe me e�ans�on vras
ng permits. SAC activity. make the determination of SAC somehow competed wimoue tne paymerrt ot SAC.
on is neces- � grandparented into the system. The A determina0on based sdely a�MWCC cntena
perty has MWCC will verify and approve all grand- woum ind�cace is SnC aedav+ere due. Howe,�er,
Jrant),or Commerclal parent determinations. me MwcC woua euow onry�o SAC crea�be-
le fBCility OC- cause Ne additional tfve(�SAC units were not
iodeling). An example of an instance requiring a re- pad ac me time ot e�ar,sion.
determinatio�on a commercial site is The total SAC credit for a property is
when new tenants occupy or when ten- equal to the number of SAC units
es in use ants change in a strip mall. When sVip � grandparented into the system plus the Demolitfons
�would have malis are originaily constructed,SAC is number of SAC units adually paid since A demolition is when a structure or buiid-
ertnination charged based on retail square footage. 1973. Or,'rf the strudure was not in exis- ing is destroyed. SAC credit will be
;redetertni- As.tenants occupy the empty space,or tence in 1973,the totai SAC credit would allowed at the time the new use is estab-
iearu there as tenants change,the SAC assignment � be the total SAC units paid. lished for SAC grandparented into the
5AC due changes. A redetermination is required system and/or paid.
ese cases with each and every change. SAC cred- � A second method of calculating the credit
ie periodic its or additional SAC units due must be determination is simply to make a deter- Effedive January 1,1992.special report-
�mission,or detertnined at that time and repotted on mination based on the current structure ing is required for demolitions,as foilows:
on the site the SAC report where the building pertnit � using the MWCC established criteria for
is reported. SAC charges. Records of actual SAC • All demoliGons as of January 1
paid and(w grandparented irrto the sys- 1992 must be reported on a month�
basis as ihey occur,and,
ie Commis- SAC Credits tem must then be checked for the
y SAC not Credt for SAC previously paid or a site � determination to be complete. This dou- . p��demolitions which occuRed pric
on,'rf the SAC is aliowed when there is a new use estab- ble check is necessary because the two to January 1.1992torwhich no nz+
in the past lished on a property. The uedit is stated � methods of determination may provide dif- use has been estab�ished as of De-
should have in unfts and is used to offset the SAC unit ferent SAC credit determinations. It is cember 31,1993 must be reporte
�ven(7)years determination of the new use. The pur- possible that previous SAC charges or by December 31,1993.
.s a proven re- pose of SAC credits is to avoid doubie credits were not handled correctiy.If this
SAC will not payment of SAC on a spee�c parcel of � occurs,the SAC grandparented into the
�n the next land. For the purpose of the SAC credit system plus SAC adually paid will take
�site,credit determination,SAC paid includes the precedence over the SAC determination
not paid(see totat number of SAC units paid on the � based on the curtent strudure.
property as well as SAC grandparented
into the system in 1973. �
� 1.