Laserfiche WebLink
REQUEST FOR COUNCIL ACTION <br /> Date:August 11, 2014 <br /> Item No._� <br /> Department Approval: Administrator Approval: Agenda Section: Engineer Update <br /> Name: Andrew Mack,AI <br /> Title: Community Development Director <br /> Item Description: 3165 North Shore Drive-Review o sit ling&grading work <br /> List of Exhibits: <br /> A. City of Orono Resolution#6315 Approving CUP Planning Case#13-3624 <br /> B. Amended Grading Plan Received 8/1/14 <br /> C. 8/4/14 Letter from David Martini <br /> D. 4/5/14 Memo from Mark Gronberg <br /> Proiect Backaround: On 8/26/13 the council approved a CUP for filling and grading work on the subject <br /> property(please see attached resolution). The approval specifically authorized a total of 2,267 cubic yards of <br /> fill material on this lake front lot with conditions including an optional review by the Planning Commission and <br /> Council as may be needed and required conformity with the requirements of the city engineer. Extensive <br /> history preceded this work including demolition of a dwelling,approval of a building permit for a new home <br /> that was never completed,and a CUP for the site fills and grading work in 2009 which was never completed. <br /> Proiect Status: Planning& Engineering staff have worked closely with the contractors and adjoining property <br /> owners in efforts to minimize adverse impacts and monitor the work of a protracted site grading and riparian <br /> lot restoration project on the subject property. Following extensive review of the work being conducted this <br /> spring&summer, and based upon a determination made by both the city's consulting engineer,grading <br /> contractor,and the land owner's engineer; changes were made to the approved grading plan while the work <br /> was being completed in the past 2 weeks(please see attached revised grading plan). Dave Martini prepared <br /> the attached letter authorizing the changes to the plan.The site grading work is now complete and the <br /> contractor will be hydro seeding the site to re-establish turf for the disturbed land area. The revised <br /> calculation of fill materials according to the land owner's engineer is 3,800 cubic yards(please see attached e- <br /> mail from Mark Gronberg). This was an increase of 1,533 cubic yards,or approximately 68�above the <br /> original plan. The reason for the increase was due to the removal of an existing garage and retaining wall at <br /> the west end of the site thereby allowing for a much more gradual slope of the lot, required redirecting of <br /> drainage away from the adjacent residence to the east down the center of the lot toward the lake,and for <br /> greater ease of lawn maintenance without the severe slopes. <br /> Proiect Review: Due to the changes in the amount of fills,and given the on-going nature of concerns <br /> associated with the work on this site, staff felt it would be appropriate to provide council with an update of <br /> this project. It will be provided by the city's consulting engineer and we will both be prepared to answer any <br /> questions the council may have. <br />