HomeMy WebLinkAbout2015-00055 - escrow fee CITY OF ORONO * 2 0 1 5 - 0 0 0 5 5 *
2750 KELLEY PARKWAY DATE ISSUED: OU20/2015
ORONO,MN 55356-
952 249-4600 FAX: 952 249-4616
ADDRESS : 3135 NORTH SHORE DR
PIIv : 09-117-23-32-0018
LEGAL DESC : REG.LAND SURVEY NO. 1113
: LOT 000 BLOCK 000
PERMIT TYPE : ESCROW FEE-TIED TO BUILDING PERMIT
PROPERTY TYPE : RESIDENTIAL
CONSTRUCTION TYPE : ESCROW FEE-TIED TO BUILDING PERMIT
NOTE: THIS$2500 ESCROW IS TIED TO BUILDING PERMIT 2015-00054
APPLICANT ESCROW FEE-BUILDING 2,500.00
ESCROW FEE-EROSION CONTROL 0.00
REVOLUTION DESIGN BUILD ESCROW FEE-GRADING 0.00
18110 MINNETONKA BLVD
WAYZATA,MN 55391- TOTAL 2,500.00
(952)594-5037 Payment(s)
Minnesota State License#:BUIL-BC631863 CHECK 7696 2,500.00
OWNER
MARX,KELLY
3135 NORTH SHORE DR
WAYZATA,MN 55391-
AGREEMENT AND SWORN STATEMENT
The work for which this permit is issued shall be performed according to
the approved plans and specifications,applicable City approvals,and the
State Building Code. This permit is for only the work described and dces
not grant permission for additional or related work which requires separate
permits. All provisions of laws and ordinances goveming this type of work
shall be compied with whether or not specified herein.This permit will
expice and become null and void if construction suthorized is not
commenced within I80 days of the date of issuance,or if construction is
suspended for a period of 180 days at any time after work has commenced.
The applicant is responsible for assuring all required inspections are
requested in conformance with the State Building Code.This permit may be
revoked at any time for due cause.
/ /
Applicant Permitee Signature Date Issued By Signature Date
BUILDING PERMIT ESCROW AGREEMENT�
Orono Buiiding Permit#aOl 5 -G1�05
AGREEMENT made this c�� day of , 20�, by and beriveen the CITY OF ORONO, a
Minnesota municipal corporation("City")and �Gfr.l�( �C (�Owners'"}.
Recitals
1. A building permit application has been filed for �!.(� �V�-�'�-r�YLtl�" located at
3(35 tl DD�h► ��P.� the ("Subject Property"), legally described as
2. Owners �equest the City to review this application which requires City approval and may require
consultant legal and/or engineering review.
3. The City will commence its review of the application and incur costs associated with said neview only if
the Owner establishes an escrow to ensure reimbursement to the City af its costs.
NOW THEREFORE,'F'HE PARTIES AGREE AS FOLLOWS:
1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escxow Agreemerrt,
tt�e Owners shall deposit$2,500 with the City. All accrued irrterest, if any, shall be paid to the City to reimburse the
City for its cost in administering the escrow account.
2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursemerrt to the City for all
out-of-pocket costs the City has incu�red (inGuding planning, engineering, in excess of $500, or legal consultant
review) or will incur in reviewing the plan. Eligible expenses shall be consistent with expenses the Owners would be
responsible for under a building permit application. The escrow will also guarantee reimbursemerrt to the Ci#y for all
out-of-pocket costs the City has incurred to assure that the work is completed in accordance with the Stormwater
Pollution Prevention Plan and the provisions of Orono City Code Chapter 79. The financial security may also be used
by the Gity to eiiminate any hazardous conditions associated with the work and to repair any damage to puhlic property
or infrastructure that is caused by woric(induding planning, engineering,or legal consultant review)associated with
bullding permit#ab/S- if compliance with the approved building permit is not accomplished.
3. MONTHLY�LLfNG. As the City receives consultant bills for incurred costs, the City wifl in tum send
a bill to the C7�nrners. Owners shall be respansible for paymerrt to the City within 30 days af the Owners`receipt af bill.
4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make payment to the
Ciry within the timeframe oudined in #3 above, shall issue a Stop Work Order until the Owners pay all expenses invoiced
pursuant to#3. The City may draw from the escrow account without further approval of the Owners to reimburse the City for
eligible expenses the City has incurred.
5. CLOSING ESCROW. The Balance on deposit in the escrow, if any, shall be retumed to the Owners
when atl requirements r�elated to the project are complete. City Staff shall review the terms of this escrow agreement
two times per year to determine whether the requirements af the project have been successfully c�mpleted and
whether it is apprnpriate to retum the funds. Owner may also request the release of the funds, and such funds shall be
released upon City Staff receiving the appropriate ve�cation that all requiremerrts of the project have beert
successfully campfeted.
6. CERTIFY UNPAtD CHARGES. If the project is abandaned by Owners, or if the eligible
expenses incurred by the City exceed the amount in escrow, the City shall have the right ta certify the unpa�balance
to the subject property pursuant to Minn. Stat. §§415.01 and 366.012.
CITY: CITY OF ORONO OWNER:
By:��V� !'V��
Its: l • �
��11: 0 to� RR��r�S�r�+t'i�e
Par,tcet Last Updated: January 2015
Page 22
• �• • �• � : •e �• ��• �• • �� • •
�.�tio�y.... 7073
O , REVOLUTION DESIGNi AND BUILD LLC TCF BANK
p�j : '� g 18110 MINNETONKA BOULEVARD 801 MARQIlE7TE AVENUE
g� WAYZATA,MN 55391 MINNEAPOUS,AAN 5�402-3475
`�\G�� 17-70UOQlZ910
I��/15 =
ORDER OF� CiC(� OF �T.+�� �P I� 10$ .1� o
py�rr. "(�}4Ck��}�D �'�VEIJ'�NN1�l�R� Qlol�S" �� �s�1a0 RS �
N
�
�Memo �+��'��M IT �
��'
n� nn�
LW10
KELLY J MARX 7696
MELODIE S MARX i�a000izs�oss
1 WEBSTER PL � � - 3869380948
HOPKWS,MN 55305
ate
Pay to the �, � � M
O er of �� ��•(.,'V
� '
,
Dollars � �
� TCF National Bank
.��j tcfbank.com
Memo !�(/1' 1�� `��.�i
M
�: 6�
��.