HomeMy WebLinkAboutRe: as-built �0��
C ITY OF ORONO
,� � Street Address: Mailing Address: I Telephone(952)249-4600
'��, � 2750 Kelley Parkway P.O.Box 66 Fax (952)249-4616
tq'�ESHD��G Orono,MN 55356 Crystal Bay,MN 55323 www.ci.orono.mn.us
May 27, 2014
Ralph & Shelley Smith
3070 North Shore Drive
Wayzata, MN 55391
RE: Building Permit#2012-01215
In the process of closing out completed building permit project files, it was noted we have not
received an as-built survey and hardcover calculations for the detached accessory structure on
your property.
We continue to hold an escrow of $700 pertaining to the project. As noted on the issued
building permit (copy attached), an as-built survey and hardcover calculations are required prior
to escrow release. Please have an as-built survey and hardcover calculations prepared by a
surveyor and submitted to us. Your escrow will be refunded once we confirm the property
conforms to the approved building permit plans. Please see the attached City code section
regarding survey requirements.
Please contact me at 952-249-4620 or at cmattson@ci.orono.mn.us if you have any questions.
Sincerely,
CITY OF ORNO
1111�IYw
Christine Mattson
Planning Assistant
Attachments
May 27, 2014
3070 North Shore Drive
Page 2 of 2
Sec. 86-68. Permit application; information required.
(a) The application for a construction permit shall include such information as may be required by the
city, which may vary between types of construction projects.
(b) Surveys required:
(1) Initial survey. Any building or general permit application for construction of a new structure or
expansion of an existing structure shall be accompanied by a certificate of survey prepared
by a Minnesota Registered Land Surveyor unless the building official determines the
construction project is exempt from this section. The certificate of survey shall conform to the
standards on file in the office of the building official.
(2) Foundation survey. A foundation survey shall be submitted to the city for review and
approval, unless exempted by the building official, upon completion of the foundation work for
all buildings and all additions to buildings. The foundation survey, prepared by a Minnesota
Registered Land Surveyor, shall certify the lot dimensions; front, side, rear, lakeshore, and
wetland setbacks; and foundation elevation. A foundation survey must be submitted before
proceeding with framing or further construction. In lieu of a survey a letter prepared by a
Minnesota Registered Land Surveyor containing the same information as a foundation survey
may be submitted.
(3) As-built survey. An as-built survey, prepared by a Minnesota Registered Land Surveyor, shall
be submitted to the city for review and approval upon the completion of all buildings and all
additions to buildings, unless exempted by the building official. The as-built sunrey shall
certify the final topography of the site; verify drainage patterns; and provide hardcover
calculations for lots in the Shoreland Overlay District. An as-built survey must be approved
before the issuance of a certificate of occupancy. In the event that weather or other
conditions prevent the completion of an as-built survey at the time the Certificate of
Occupancy is requested, applicant shall provide a sufficient financial guarantee and establish
an escrow agreement to ensure completion of the as-built survey.
(Code 1984, § 12.02; Ord. No. 49 3rd series, § 1, 9-8-2008)