HomeMy WebLinkAbout2017-00853 - new house PLAN
REVIEW
(�CHECKLIST FOR NEW STRUCTURES / ADDITIONS
Address:
Description of work: C 1VV Amy—, Date Recd:
Septic review by: U ' Date Approved:
Zoning review by: Date Approved:
Building review by: Date Approved: (��
Grading review by: '� Date Approved: a��2,
Zoning District: ,^ A Zoning File M
Resolution? Yes Reso M Reso Date: Signed: Yes No Resolution/NA
Zoning: Lot Area: Q 8 Z,�AC Width: Structural Coverage: NA-SF %
Survey Submitted: es 0 No Date of Survey: Revised dateM:
:
Landscape plan submitted? 0 Yes Landscaper: D /None propose
Proposed Setbacks:
Fr t(Lake) R r(Street) (� S E ( N(7S E W") Other Buildings Wetland
Side 'Side
Building Height Analysis:
Distance Between First Floor and defined Top of
Roof* See "buildingheight" definition):
(a) f>•
First Floor Elevation from building plans): (b)
Highest Existing ground level (per survey) or 10' (c)
above lowest ground level, whichever is lower:
Difference between b and (c): (d) L
DEFINED HEIGHT If highest existing grade is: (e) J
above FFE-Height is(a)-(d) ,
below FFE-Height is(a)+(d)
Shoreland District MCWD Permit Average Lakeshore Setback Bluff
Met?
lid
Yes No Permit Number: 0 Yes 0 No 0 N/A El Ye No
D N/A—see attached Setback:
Stormwater Quality Existing Proposed
Overlay District Tier Hardcover Hardcover Variance Required CUP Required
circle one % ands % and s
1(p1 . -ID D Yes No 0 Yes No
J 2 3 4 5 Type(s): Type(s):
Updated: October 2016
v:\forms\plan review checklist 10-2016.docx
kJ,,0SI,J71_
,/
Dy- / Q TIME
CITY OF ORONO CALLED IN �� U
INSPECTION NQ9T,,IC SCHEDULED /-l5/ -3d
PERMIT NO. J/ pd1 ' 2 SCHEDULE t
ADDRESS �` � X/z-[ obi'o,
OWNERE ONE NO. 1 �95-6
CONTRACTOR ) r Ja
a DESCRIPTION / v UA-ed Oall
W ❑ FOOTING 0 DEMO-FINAL 0 SEPTIC FINAL
Q ❑ POURED WALL 0 PLUMBING RI 0 EXCAV/GRADING/FILLING
y ❑ FOUNDATION DRAIN TILE 0 PLUMBING FINAL 0 TREE REMOVAL
Z ❑ LATHE 0 MECHANICAL RI 0 SITE INSPECTION
Q 0 FRAMING 0 MECHANICAL FINAL 0 RATED WALLS
1, ❑ INSULATION 0 WOOD BURNER/FIREPLACE 0 COMPLAINT
Q ❑ FINAL 0 WATER HOOK-UP 0 FOLLOW-UP
W 0 AS BUILT-SURVEY 0 SEWER HOOK-UP 0 FOUNDATION/REMOVAL
2
v ❑ DEMO-SITE 0 SEPTIC INSTALL
2
OWN ERICONTRACTOR TO MEET YOU:_YES_NO
v) COMMENTS: -L------- 174. - -# rah,si!}e_/i-
a ( tawr-e J w4 it s /1 L. OL-71 -4e J.N01";Z i )
lailldeltIt
o .
IQ
C519le4014c4 Iyn5T 3 ZL v r. .
2
W
Z
W
CC
J
lit '`a WORK SATISFACTORY:PROCEED El PROJECT COMPLETE
IQ
❑ RRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
O 1:1CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN
INSPECTOR WILL RETURN ❑CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
0 INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (952) 249-4600
Owner/Contractor on site:
Inspector. �c) c7»
White Copyllnspector's File Canary Copy/Site Notice
-
DATE TIME V
CITY OF ORONO CALLED IN
INSPECTION NOTICE SCHEDULED /U—f/ 3:30
PERMIT NO.aOJ7- OO SZ COMPLETED
ADDRESS TIO /It,/
OWNER _� TELEPHONE NO. Ze/.2-02$02 -7434
CONTRACTOR /orYkt /"o/-G� t
DESCRIPTION S I /11-- /' e-ViCe_.--
W ❑ FOOTING 0 DEMO-FINAL ❑ SEPTIC FINAL
Q ❑ POURED WALL 0 PLUMBING RI ❑ EXCAV/GRADING/FILLING
Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL
❑ RADON SLAB ❑ MECHANICAL RI 0 SITE INSPECTION
Q 0 FRAMING ❑ MECHANICAL FINAL 0 RATED WALLS
• ❑ INSULATION ❑ WOOD BURNER/FIREPLACE 0 COMPLAINT
0 FINAL ❑ WATER HOOK-UP 0 FOLLOW-UP
W ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL
J ❑ DEMO-SITE 0 SEPTIC INSTALL
2 OWNER/CONTRACTOR TO MEET YOU: YES_NO
• COMMENTS: X. /7 7'L.hie jn PIA tt i G-V.1 S
a lie a.I. 7� s�pL..f�v�5f7 »
2
0
ct
O
W
CC
Q
W
W
CC
d
NI WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
✓ BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (952) 249-4600
OwnerlContractor on site:
Inspector.
White Copy/Inspector's File Canary Copy/Site Notice
\\. L.0
DATE TIME
CITY OF ORONO CALLED IN
INSPECTION NOTICE _ SCHEDULED _Jv2-y-/ 7 .V:.30
PERMIT NO.0..C17 , COMPLETED
ADDRESS C) /- ri -�yZ., L/:�'tI2_ O
OWNER �% TELEPHONE N447/" --'3-' cI
CONTRACTOR � 'Cnsf.
DESCRIPTION kerkr
._
W FOOTING 0 DEMO-FINAL j( 0 SEPTIC FINAL
Q ❑ POURED WALL 0 PLUMBING RI 0 EXCAV/GRADING/FILLING
O ❑ FOUNDATION DRAIN TILE 0 PLUMBING FINAL 0 TREE REMOVAL
❑ LATHE 0 MECHANICAL RI 0 SITE INSPECTION
Q 0 FRAMING 0 MECHANICAL FINAL 0 RATED WALLS
Z
❑ INSULATION 0 WOOD BURNER/FIREPLACE 0 COMPLAINT
Q 0 FINAL 0 WATER HOOK-UP 0 FOLLOW-UP
W ❑ AS BUILT-SURVEY 0 SEWER HOOK-UP 0 FOUNDATION/REMOVAL
✓ ❑ DEMO-SITE 0 SEPTIC INSTALL
Q OWNER/CONTRACTOR TO MEET YOU:_YES_NO
COMMENTS:` ZeC.�GS - hoe.' se y�eydiS. 5eZ'i-S -
cc
4.1 - ., c! - 6i-64 -revecc - d
ec
''cc — re-64,-- ip' i �..1.7 ,mer.
o
4. • (6 A afar r- i -1.5104//14y leak_ hers
W
cc
-f h-S �'i re. — &E.-14..x, ga pe
W (e4.-4,c> fr✓ c','deeT g;, —
CC cst?ec_c-c6 OK / e z '- ,
d -erbt-c-' f65. c' o••"- �.�oee.-tj
W O WORK SATISFACTORY:PROCEED U PROJECT COMPLETE
RECT WORK&PROCEED U ISSUE CERTIFICATE OF OCCUPANCY
O UCO RECT WORK,CALL FOR REINSPECTION TEMPORARY
C.I BEFORE COVERING PERMANENT
U CORRECT UNSAFE CONDITION WITHIN HOURS. U PHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR U CITATION ISSUED
U INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (952) 249-4600
Owner/Contractor on site:
Inspector.0//11^-1 .)-1----
White Copy/Inspector's File Canary Copy/Site Notice
`P ,/
DATE TIME
CITY OF ORONO CALLED IN
INSPECTION NOTICE SCHEDULED \a,12-1 3'•OCA
PERMIT NO. JJ II COMPLETED
ADDRESS q10 T� Y'1Ck \
OWNER TELEPHONE NO. (Q(Z- 2.,4 kf 99
CONTRACTOR IC3 r Q
DESCRIPTION Y-CLX W7J
0 FOOTING 0 DEMO-FINAL 0 SEPTIC FINAL
za POURED WALL 0 PLUMBING RI 0 EXCAV/GRADING/FILLING
O0 FOUNDATION WATERPROOF 0 PLUMBING FINAL 0 TREE REMOVAL
❑ RADON SLAB 0 MECHANICAL RI 0 SITE INSPECTION
0 FRAMING 0 MECHANICAL FINAL 0 RATED WALLS
❑ INSULATION 0 WOOD BURNER/FIREPLACE 0 COMPLAINT
Q 0 FINAL 0 WATER HOOK-UP 0 FOLLOW-UP
W ❑ AS BUILT-SURVEY 0 SEWER HOOK-UP 0 FOUNDATION/REMOVAL
❑ DEMO-SITE 0 SEPTIC INSTALL
OWNERICONTRACTOR TO MEET YOU: YES_NO
9 COMMENTS: ,a*rir'A! L✓•ll I St ay,
5; P/4 -VA in p __,011,—p
j
o . 1577e- pit ?lc,ce
Gere YeJ ph . .01" 4.11
a;
cc Al,)411k-4:5 DI) s.�-e-
W
W
CC
lel WORK SATISFACTORY:PROCEED ❑PROJECT COMPLETE
CC ❑CORRECT WORK&PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY
0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
.1 BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. O PHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR I=1 CITATION ISSUED
O INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (952) 249-4600
OwnerlContractor on site:
Inspector. ✓4 S v /1 g
White Copyinspector's File Canary CopylSite Notice
SCA—. /
' i
----- DATE p TIME
CITY OF ORONO CALLED IN /- /
INSPECTION NQTICE _ g HEDULED / — D—/Ay /- .0-0
PERMIT NO. c�0/7 LMP - .D
ADDRESS -/ 80 ' / (!'(K -
OWNER �C� ✓l�� PHONE NO. 'I�VL�A`0
CONTRACTOR 14 /' ,
DESCRIPTION � W/ �/ /L/
\`� ,
W ❑ FOOTING ❑ DEMO-FINAL 1 0 SEPTIC F/AL
11.
❑ POURED WALL 0 PLUMBING RI ❑ EXCAV/GRADING/FILLI
' J FOUNDATION DRAIN TILE 0 PLUMBING FINAL 0 TREE REMOVAL
Z ❑ LATHE ❑ MECHANICAL RI ❑ SITE INSPECTION
Q 0 FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS
• ❑ INSULATION ❑ WOOD BURNER/FIREPLACE 0 COMPLAINT
Q 0 FINAL 0 WATER HOOK-UP 0 FOLLOW-UP
i ❑ AS BUILT-SURVEY 0 SEWER HOOK-UP 0 FOUNDATION/REMOVAL
J ❑ DEMO-SITE 0 SEPTIC INSTALL
Q OWNER/CONTRACTOR TO MEET YOU:_YES_NO
2
2 COMMENTS: rat.4-d4t.5,1. SQ.,ve y - c::::e ,9e-r C."(
ccW
Q.
0
CC
R7.
o �" �i'�l�L.Qw•fi chat / � L/P g e '7/c)� '
W �S�L
cc
.".....-fok A-4 14&et diedr,"`",Ee...xte•rthe) , roviee,iP
W �V to l/l:Oe �h;gc, Od'L.✓ ✓y)G�"
cc 1, c4 <l 1i( /015, .
O
W ❑WORK SATISFACTORY:PROCEED ❑PROJECT COMPLETE
W 6$RRECT WORK&PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY
CI ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR CI CITATION ISSUED
saiINSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (952) 249-4600
Owner/Contractor on site:
Inspector. /A' 7L
White Copyllnspector's File Canary Copy/Site Notice
DATE TIME
CITY OF ORONO CALLED IN
INSPECTION NOTICE Qw JSCHEDULED < I
PERMIT NO. 11 ? f�''OMPLETED
ADDRESS 1 YL� 1`t" (dc:C4 (,
OWNER TELEPHONE NO.CO tit-u lad
CONTRACTOR 1 b cc& f
DESCRIPTION6 1\14,
W ❑ FOOTING 0 DEMO-FINAL 0 SEPTIC FINAL
❑ POURED WALL 0 PLUMBING RI ❑ EXCAV/GRADING/FILLING
" 0 FOUNDATION DRAIN TILE 0 PLUMBING FINAL 0 TREE REMOVAL
❑ LATHE 0 MECHANICAL RI 0 SITE INSPECTION
Q 0 FRAMING 0 MECHANICAL FINAL 0 RATED WALLS
is 0 INSULATION 0 WOOD BURNER/FIREPLACE 0 COMPLAINT
Q
0 FINAL 0 WATER HOOK-UP 0 FOLLOW-UP
W ❑ AS BUILT-SURVEY 0 SEWER HOOK-UP 0 FOUNDATION/REMOVAL
❑ DEMO-SITE 0 SEPTIC INSTALL
OWNERICONTRACTOR TO MEET YOU:_YES_NO
y COMMENTS: !r Oirrooi n S aifain XCC
,�
ot%/ •6:'r, 1`ft, 17 k J ct awl La tP. £rc't eo�f
cc ddGrS1, 4 chi a
.a0L, ' CO re,/ _ at
c
z
W
CC
W 0 WORK SATISFACTORY:PROCEED ❑PROJECT COMPLETE
CC• 0 CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
• 0 CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑PHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (952) 249-4600
Owner/Contractor on site:
Inspector:
White Copyllnspector's File Canary CopylSite Notice
CERTIFICATE OF SURVEY FOR
JERRY AND TIFFANE FERRER
OF LOT 1, BLOCK 1, TANAGER ESTATES
HENNEPIN COUNTY, MINNESOTA
-
/
I \ \ \ I I 986.38---------------------
\ S 57047' 6" W I
\ _
g =9460
�W=948. 529.06
\ \ \ 22.00 / Exls I — \ B F94-81 _
..1.......... RAIN TINGGA\ �/=944. \ / /
RDEN2
ROPOSED RAIN
77.03 I T59.52 _ _ _ _ I;a p6 PROPOSED RDEN 4A PROPO ED / ��
/ / r - J, `N I N1�VL=944.0 WEIR OPO //
NW �t r--- DRIVEWAY T =956.0
=936 / ^O n r 6, / "e�I-653.5 HWS 945.0 /
HWS= N ' �' �l �o s (�) 46 9 TW_953.0 \ EMERGENCY
\ 93784 O R I 8W-950.0i''�iGOVER OW
\\ �� / \\ \ / i 3' r \O (�) LL v / 4 I :� TW=949.0 ��PT\ 945.0 / - 6 rt
\ \ ��\� // ' - wl i easement L� // S orO 8960 00 7�� A,:i.o _ v//�\ ;'BW=946.0 �T� /
HERITAGE
LANE
DRIVEWAY O
960— — — — — — PROPOSE -� �ti 4,S 0 \R� ?�
— — — — — RETAINING(U) — — — — �� ^ 95
/ \ -- — — — — — -962— — -WLALL
n
—
2. - 2• TW=961.5 0 \ \ 8 �O OOSS PO RS 9y � �' _ � � / �i �:�•
N;I /
E
------------964--- _ BW=958. =958.0 \ ( ' �� `'/
91 A
gy
%FRET INING
.968134 - /
/ . — �' -972— , \ • .._ � 47 \ I 1 � � / I / I \ I � I I I I I
/ �' — _/.............. X974
...............
LEGAL DESCRIPTION OF PREMISES
Lot 2, Block 1, TANAGER ESTATES
o : denotes iron marker
(908.3) denotes existing spot elevation, mean sea level datum
910.8 denotes proposed spot elevation
---917-- denotes existing contour line, mean sea level datum
denotes proposed contour line
denotes proposed 4" diameter deciduous tree (4 total to be planted)
Bearings shown are based upon an assumed datum.
This survey intends to show the boundaries and topography of the above described property,
existing spot elevations and topography, and the proposed location of a proposed house, driveway,
and grades thereon. It does not purport to show any other improvements or encroachments.
ZT—V/V
....._.....
601 60`
PROPOSED ELEVATIONS : (per architect, verify)
1) Upper garage = 956.5
2) Lower garage = 946.0
3) Top of foundation
4) Main floor
5) Basement
s
i
.1..- �.-.�J..................
f� � ................
....369.56
------------
S 4902Y
58,e W
0 30 60 120
SCALE IN FEET
m
0
L l ::3
Q L
Cto T
0 0
0 U L-
.21 U :3
cEv
D
acV)(n
v0�
!n �.0 C:
0J:2
�E750
-0 v °
4'-a Ecn
v
0 Q
0
L
tvC:3
— 3 v v
e
A 2, 6' rzt
�-
v�
zW
Z
zK
L0
�a�
wA
z
Hz�
a
w
z�
U�
w
A
0
N
In
3:
d)
a
O
V
�
J
�i
W
z
=
OZ z
W
Lo
0
y
U
TwTp�
V�
m
0
L l ::3
Q L
Cto T
0 0
0 U L-
.21 U :3
cEv
D
acV)(n
v0�
!n �.0 C:
0J:2
�E750
-0 v °
4'-a Ecn
v
0 Q
0
L
tvC:3
— 3 v v
e
A 2, 6' rzt
�-
- -
Jeremy Barnhart
From: Gtcferrer<gtcferrer@aol.com> ORONO COPY
Sent: Monday, September 18, 2017 11:17 AM
To: Jeremy Barnhart
Subject: cainsworth5@icloud.com tom@tompotterconstruction.com
Hi Jeremy,
The Hanson group (structural engineers) are putting a priority on the engineering of the wall and will have it ready for you
by Thursday of this week. I also talked to the Arborist for Task Masters and he recommends that we put in two Royal Red
Maples and between 6-8 aspen trees.
I am under the understanding that these are the last two items that you need to issue a permit. If there is something else,
please let us know ASAP.
We look forward to getting this started.
Thank you,
Tiffane' Ferrer
612-812-1226
1
qv Hej i jm�� LfItu__
wig-0o8!j3
N2W }}ftS,c-,-