Loading...
HomeMy WebLinkAboutRe: bldg permit application � °� � �o_ o\\ `��j,:_��=,, � I' C ITY of ORONO l�`��' � Municipal Offices � ��?��,����°� �� il ti�:.���{'��',�G Street Address: Mailing Address: �9kESKp'S� 2750 Kelley Parkway P.O. Box 66 Orono, MN 55356 Crystal Bay, MN 55323-0066 May 25, 1994 James M. Cooperman & Assoc. 13931 Hillridge Drive Minnetonka, Minnesota 55305 Re: 2455 Scotch Pine Road Dear Mr. Cooperman: On May 12, 1994 this office received an application for a building permit to construct an elevator shaft at the above referenced property. A review of the application revealed the following: 1) Proposed addition not shown on survey. Presumed location does not meet the required 30' setback to the side property line. 2) Hardcover calculations not provided as required on lakeshore lots. Survey provided indicates the property was at 29.7% in the 75' to 250' zone in 1979. Allowable hardcover in this zone is 25%. 3) Building permit must be issued to a licensed contractor or the home owner - no contractor listed. Is elevator contractor doing entire job or just installation of equipment? Please contact me to discuss how you wish to proceed with this application. Sincerely, C�.�/��`ct^-- e Oman Building Official LO/ch cc: Jeanne A. Mabusth, Building Administrator Bruce L. Vang, Field Inspector Telephone (612) 473-7357 • FAX 473-0510