Loading...
HomeMy WebLinkAbout2012-00260 - plumbing CITY OF ORONO * 2 0 1 2 - 0 0 z 6 B * 2750 KELLEY PARKWAY DATE ISSUED: 04/1U2012 � ORONO, MN 55356- 952 249-4600 FAX: 952 249-4616 ADDRESS : 2180 NORTH SHORE DR PIN : 10-117-23-31-0098 LEGAL DESC : MARKVILLE : LOT 000 BLOCK 003 PERMIT TYPE : PLUMBING(>$500) PROPERTY TYPE : COMMERCIAL-BUSINESS CONSTRUCTION TYPE : FIXTURES-MULTIPLE NOTE: BASEMENT:2 KITCHEN SINK,I DISHWASHER,2 FLOOR DRAINS, 1 WASHER 1 ST FLOOR:3 LAV,2 KITCHEN SINK,2 FLOOR DRAINS 2ND FLOOR:3 WC,4 LAV, 1 FLOOR SINK VALUATION OF PLUMBING 12700 APPLICANT PLUMBING FIXTURE FEE 158.75 CITY VIEW PLUMBING&HEATING STATE SURCHARGE PLBG(VALUATION) 6.35 1880 WAYZATA BLVD W P.O. BOX 150 TOTAL 165.10 LONG LAKE,MN 55356 (952)473-8793 OWNER ORONO LLC,MSSP 855 VILLAGE CENTER DRIVE#382 ST PAUL,MN 55109- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and dces not grant permission for additional or related work which requires sepazate permits. All provisions of laws and ordinances goveming this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the State Building Code.This permit may be revolSe�t any time for e c se. �r f l ll l� pp icant Permitee ignature Date � / � Issued By g ture ate SEPARATE PERMITS REQUIRED FOR WORK OTHER N DESCRIBED ABO FOR ITY USE ONLY � City of Orono �[ J �a�� ��¢ ��4; P.O.Box 66 Date Received: l I ermit# �� � ��;,��` 7 2750 Kelley Parkway n ��� y � �� Crystal Bay,MN 55323 Approve�fy: Am�u t S: /�5. � �\"������o�� (9S2)249-4600—Main ��~. � (952)249-4616—Faa CITY OF ORONO - PLUMBING PERMIT (All Commercial Permits Must be ApProved by the State Prior to City Approval) htt ://ww���.dli.mn. ov/CCLD/PDF/ e lumb lanrev� . dl' GENERAL INFORMATION 1. You may apply for plumbing permits by mail or in person at the City offices. Applications will be reviewed and a permit will be issued within two working days. 2. Permit cards will be sent by return mail after a review is completed. PERM[TS ARE NOT VALID UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS POSTED ON THE JOB SITE. 3. Plumbing permits may be issued ONLY to licensed plumbing contractors and to property owners residing in the dwelling. 4. When any new construction or remodeling is involved,a separate building permit must be obtained. 5. All work must be done in accordance with State Code requirements. 6. All work must be inspected and air tested before it is covered. Call(952)249-4600. (24-48 hour notice required) TYPE OF PERM[T Check All That A 1 ❑ Residential �(�Commercial(Approval Required) ❑ New �Additional ❑ Repairs ❑ Replace ❑ In Accessory Structure? *You will need prior approval and may need CUP.(Per Orono City Code,Chapter 78,Article IV) Job Site/Owner Information: ! Site Address: ���� �a�� , --��t?� �1 �� Owner: �r.1 , �✓ ��� Mailing Address: ��S 1/;)Jo G2, 't'��� c�ty: �� Pa � i z�p: 5 s�� a�� Home Phone: ����. �3 � ,� �6� Alternate Phone: Contractor Information: Contractor: C� U i C � Contact Person: �v�✓1 n G'��r���1�/�/ Address: �g�0 � W lnk�vzc�T��'B�v�� State Bond #: �C(��Lu 7�{ City: ' ��1 �-� Zip:�53�� Expiration Date: o- 31 a4 )J Phone: �5��13�7�� Alternate Phone:� C�l� ����3 bj� ❑ Insurance—Current: ��3 1 FIXTURE BSMT 1 2 OTHER FIXTURE BSMT 1 2 OTHER TYPE FL FL TYPE FL FL Water Closet 3 Floor Drains �, � Lavatory � � Sewer Ejector Bathtub Laundry Tray Shower � Washer / Kitchen Sink � Water Heater Disposal Water Softener Dishwasher Wet Baz Sillcocks Miscellaneous 1 IdOcS;h ❑ Yes,this section applies The replacement of only one Residential fixture or appliance that meets all three of the following requirements: 1. Does not require modification to electrical or gas service. 2. Has a total cost of$500.00 or less;excludine the cost of the fixture or appliance:and 3. Is improved,installed or replaced by the homeowner or licensed plumbing contractor. Skip next section,if this applies; Cost of Permit $ 15.00 State Surcharge $ 5.00 Mail-In Fee(If Applicable) $ 2.00 Total Permit Fee $ (Permit Fees Continued On Next Page) 2 If above does not apply;follow guidelines below: 1. CONTRACT PRICE * is 1.25%of contract price with a(Minimum Fee of$50.00) �.�7 d��4 x.0125$ (contract price) (minimum 550.00) 2. STATE SURCHARGE x.0005 $ (contract price) 3. POSTAGE&HANDLING(Only on Mail-In Applications) $_ 2.00 4. TOTAL PERMIT FEE(Add Lines 1-3 Above) $ ■ * CONTRACT PRICE or JOB COST means the actual or estimated dollar amount charged for the permitted work including materials,labor,profit,and other fixed costs. It is the amount to be charged to the customer for the work done. If any material, equipment, labor or installations are furnished by the owner,tenant or any other party,the reasonable mazket value of such items must be added to the estimated cost or contract price for permit fee purposes. In the event that there is a dispute on the amount of the job cost, the City may request the submission of a signed copy of the actual contract. The undersigned hereby applies to the City for issuance of a Plumbing Permit, agrees to do all work in strict accordance with the ordinances of the City and the regulations of the State of Minnesota, and certifies that all statements made on this application are complete, true and correct. Applicant's Signature: Date: "d ��� � I� � 3 ' 443 Lafayette Road N. MINNE�GTA DEPARTMEhIT �F' (651)284-5005 St. Paul, Minnesota 55155 � � ]� p/� � Ic 1-800-DIAL-DLI www.dli.mn.gov l..,C1DV� � ���V r���Y TTY: (651)297-4198 � Division of Construction Codes and Licensing REPORT ON PLANS Plans and specifications on plumbing: Creative Kids Academy,2180 North Shore Dr., Orono,Hennepin County, Minnesota, Plan No. PLB1203-00024 OWNERSHIP: Rajir Garg, 855 Village Center Dr, St. Paul,MN 55127 SUBMITTER(S): City View Plumbing and Heating Company I, 1880 B W Wayzata Blvd, Long Lake, MN 55356 Date Received: Apri15,2012, March 2, 2012 Date Reviewed: April 6,2012 SCOPE: This review is limited to the design of this particular project only insofar as the provisions of the Minnesota Plumbing Code, as amended, apply, and does not cover the water supply or sewerage system to which this plumbing system is connected. The review is based upon the supposition that the data on which the design is based are correct, and that necessary legal authority has been obtained to construct the project. The responsibility for the design of structural features and the efficiency of equipment must be taken by the project designer. Approval is contingent upon satisfactory disposition of any requirements included in this report. Special care should be talcen to insure that the material and installation of the plumbing system are in accordance with the provisions of the Minnesota Plumbing Code. A copy of the approved plans,specifications,and this Report on Plans must be retained at the project location for future reference. INSPECTIONS: All plumbing installations must be tested and inspected in accordance with the requirements of the Minnesota Plumbing Code. As specified in Minnesota Rules,part 4715.2830, no plumbing work may be covered prior to completing the required tests and inspections. Provisions must be made for applying an air test at the time of the roughing-in inspection as outlined in Minnesota Rules,part 4715.2820, subpart 2, of the code. A manometer test, as specified in Minnesota Rules,part 4715.2820, subpart 3, is required at the time of the finished plumbing inspection. It is the responsibility of the contractor/installer to notify the Minnesota Department of Labor and Industry when an installation for a state contract job, Minnesota Department of Health licensed healthcare facility, or project in an area where there is no local administrative authority is ready for an inspection and test. To schedule inspections,contact the state plumbing standards representative for your region. For your regional inspector's contact information,visit our website at http://www.dli.mn.gov/CCLD/CCLDContactus.asp REQUIREMENT(S): 1. All commercial kitchen sinks,with the exception of mop sinks and hand sinks, shall be provided with 3/4- inch hot and cold water supply branch lines as a minimum(see Minnesota Rules, part 4715.1730, subpart 2). The pot and preparation sinks shall comply with this requirement. 2. The horizontal branch serving a dishwasher, pot sink,and the floor drain must be at least 2-1/2 inches in size. 3. Any pot or scullery sink must be provided with waste outlets not less than 2 inches in diameter(see Minnesota Rules,part 4715.1390, subpart 1). Verify compliance for this requirement. 4. Water supply connections to fixtures or equipment which have submerged inlets,or inlets below the spill line of the fixture or equipment,must be provided with an air gap arrangement, approved backflow preventer or backflow preventer assembly as specified in Minnesota Rules,part 4715.2000 and part 4715.2010. This information can be provided to you in alternative formats(Braille,large print or audio). An Equal Opportunity Empioyer • Creative Kids Academy Plumbing Plan No. PLB 1203-00024 Page 2 Apri16,2012 5. Verify that the existing water supply and waste systems are sized to accommodate the added fixtures(see Minnesota Rules,part 47153800 and part 4715.2310). 6. Sufficient hot water shall be provided to adequately serve fixtures that require hot water for the proper functioning of the fixtures. 7. Requirements for water heater: a. Water heaters, including their controls and valves,must be installed so that they are capable of being reached safely and quickly for inspection, repair,or replacement without requiring the use of tools or the removal of obstacles,panels,or similar obstructions(see Minnesota Rules, part 4715.2240). b. A full-way valve must be provided on the cold water supply line to the water heater(see Minnesota Rules,part 4715.1800). c. Pressure/temperature relief valve must be piped and discharged to an approved location within 18 inches of the floor. 8. Consideration shall be made for the drain material receiving the dishwasher hot waste discharge if there is a booster heater in the dishwasher. If plastic pipe is used,the waste line shall be properly supported on continuous metal strips for the entire length. 9. Equipment installation requirements: a. All water treahnent and food/beverage equipment along with supply piping for potable water must conform to the applicable NSF drinking water standards. b. Water supply piping serving food or beverage equipment which is not part of a certified equipment meeting NSF standards must be installed with code approved material for water distribution piping. 10. Requirements for indirect waste piping: a Indirect waste piping from multiple food/ice storage bins shall discharge independently to the drainage system. b. Indirect piping ftom the coolers/equipment shall be at least 3/4 inches in size. c. Indirect waste piping from devices and equipment not regularly classified as plumbing fixtures must be of code approved material and be trapped(MN Rules,part 4715.1510). 11. In all buildings other than dwellings, shutoff valves shall be installed which permit the water supply to all equipment in each separate room or to each individual fixture to be shut off without interference with the water supply to any other room or portion of the building(see Minnesota Rules,part 4715.1800, subpart 6). 12. Referred to additional general requirements and information dated 4/2012 in the attached handout for the project. NOTE(S): 1. The scope of this project consists of the installation of dishwasher,floor drains,prep sinks, pot and scullery sink,hand sinks, and adding one toilet/lavatory in upper level. All other restrooms/fixtures are existing. 2. This facility will be served by existing municipal water and sewer services. � Creative Kids Academy Plumbing Plan No. PLB 1203-00024 Page 3 Apri16, 2012 3. This plan review is for the plumbing systems only and does not pertain to the licensing reyuirements for the facility. The Hennepin County health licensing authority will report separately on any licensing requirements which must be met. 4. The plans and specifications were prepared by a licensed plumber. Only the plumber who has prepared the plans may use the plans for construction. If another plumber is contracted to install the plumbing,they must submit their own plans and specifications for the project. Authorization for construction in accordance with the approved plans may be withdrawn if construction is not undertaken within a period of two years. The fact that the plans have been approved does not necessarily mean that recommendations or requirements for change will not be made at some later time when changed conditions, additional information, or advanced knowledge make improvements necessary. Approved: � Cathy M.Tran, PE Public Health Engineer Plumbing Plan Review and Inspections Unit 651/284-5898 cc: City View Plumbing and Heating Company Raj ir Garg City of Orono Building Official Hennepin County EHS File Enclosure(s) � DATE TIME " CITY OF ORONO CALLED IN INSPECTION NOTICE SCHEDULED � PERMIT NO.���a-DO°��o 0 COMPLETED ADDRESS a��O iU47�� 4��P� OWNER , TELEPHONE NO. ��Z�g 5 ���� CONTRACTOR V��� � DESCRIPTION �l � ❑ FOOTING ❑ PLUMBING FINA ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORFJWETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL O ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT v ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP i ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL � OWNER/CONTRACTOR TO MEET YOU:_YES_NO ��., COMMENTS: � W a J O �� � O � �/�.� ♦ \ Q(� I� 2 W � W � � � ORKSATISFACTORY:PROCEED ❑ PROJECTCOMPLEfE W ❑CO T WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFOREC�/ERING PERMANENT ❑CORRECTUNSAFECANOITIONWITHIN HOURS. � pHOTOTAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED ❑iNSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (g52) 249-4600 OwnerlContractor on site: Inspector. ,.,,,,��7 White Copyllnspector's File Canary CopylSite Notice