MEMORANDUM �"Fu LL �
�
�
a
#
To: Annefte LeSueur �
�to1v1: Jennifer Yoos �
PR07ECT: Atelier LeSueur -- --- ---
SUB7ECT: Conversation with Lyle Oman, Orono Building Inspector Cuningham
Hamilton
DA�: Monday, August 28, 1995 puiter, P.A.
cc: Russell Saulon (Atelier LeSueur), Lyle Oman (City of Orono) Architects
201 Main St.S.E.
Annette, I have contacted Lyle Oman in response to your concerns Suite 325
regardina the letter you received from the city of Orono. Minneapo�is,MN
55414
As a clarification, he did intend that all construction work would be
Telephone: .
completed by the start of school in the fall. After further discussion, he is willing 612-s�9-saoo
to extend this requirement and take into consideration the cunent financial Facsimi�e:
situation of the school. He requests that we meet to set up a time frame for code 612-379-4400
modifications and set a priority for construction items that involve life safety
John W.Cuningham,FAIA
issues. These items would include exiting at all levels of the building, reattaching John E.Hamilton,AIA
the fire escape and providing a handicapped ramp to the first level. �ohn E.cluiter,AIA
Thomas L Hoskens,AIA
Since you currently have an enrollment that is lower than anticipated you
might be able to modify your use of the building. A temporary option might be
to limit use in specific areas (e.g., basement or second floor) and make
corrections sooner in areas that you intend to use fully (first floor).
Please contact me at your earliest convenience to set up a meeting to
discuss these issues and options that might be available to resolve them.