Loading...
HomeMy WebLinkAboutRe: plan review response (� � Adv�rr�.aq� � Gp�j� Advantnge Point Group, Inc. � �r.�p Engineering�Architectural Consulting Services L_ _ , June 8,2006 �tECEIVE� Mr. Lyle Oman,Building Official City of Orono J U N 1 2 2006 P.O.Box 66 Crystal Bay,MN 55323 �ITY OF ORONO Re: Response to Plan Review Hill School,2180 North Shore Drive,Wayzata,MN The following comments are in response to the Plan Review for the Hill School Addition. 1. Address the Code Amendment and Plan Review Policy as applicable to the 2180 North Shore Drive. As per discussions with Lyle Oman and the State Elevator Code Official we plan to use draft curtains of 1/2" Plexiglas down a minimum of 12 inches below the ceiling at the elevator lobbies. A smoke detector is to be installed on the ceiling above the elevator entry and connected to the elevator recall. See attached Drawings showing the drajt curtains and smoke detectors for each level. Please call the following if there are any questions at 651-645-8576 ext 206 Submitted By: Advantage Point Group,Inc. �t�:�,..��'1�� ����. Charles W.Hively,Archite� cC. Rutledge Construction Co., 1409 South 7`h Street,Hopkins,MN 55343 Bill Worms,Advantage Point Group,Inc 2523 Wabash Avenue, St. Pnul, Minnesota 55114 Office: 651/645-8576 Fax: 651/645-5237 Advnntage Point 6roup consists of Advantage Point Group,Inc., and The Auditing Advantage,Inc. An Equal Opportunity Employer