February 11, 2010 � Bonestroo
Melanie Curtis
Planning and Zoning Coordinator
City of Orono
Post Office Box 66
Crystal Bay, MN 55323
Re: 2180 North Shore Drive
File No. 000139-10000-1
File No. 10-3442
Dear Melanie:
We have reviewed the plans for a proposed garage at 2180 North Shore Drive. The plans are
dated 2-3-10. We have the following comments with regards to engineering matters:
• Most of the garage and a portion of the driveway are being placed over an area with
existing hard cover. The slight increase in hard cover will generate a negligible increase
in stormwater runoff to the north.
• It appears that a required stormwater pond was never constructed with the 2006 or
2007 building addition and parking lot expansion project. We recommend that the
construction of the approved pond be required regardless of the garage project
proceeding.
• This project will disturb more than 100 CY of material. Sediment and erosion control
information meeting the requirements of Orono's City Code 79-7(c)(2) must be
submitted. The minimum $2000 sediment and erosion control financial security should
be required of the owner for this permit.
If you have any questions, please call me at(651) 604-4894 or send an email to
darren.amundsenCa�bonestroo.com.
Yours very truly,
�� ��____,
Darren Amundsen
Cc: Tom Kellogg
2335 Highway 36 W
St.Paul,MN 55113
Tei651-636-4600
Fax 651-636-1311
www.bonestroo.com
February 17, 2010 �Bonestroo
Melanie Curtis
Planning and Zoning Coordinator
City of Orono
Post Office Box 66
Crystal Bay, MN 55323
Re: 2180 North Shore Drive
File No. 000139-10000-1
File No. 10-3442
Dear Melanie:
We have reviewed the plans for a proposed garage and grading at 2180 North Shore Drive. The
grading plan is dated 2-12-10 and the landscape plan is dated 2-10-10. We have the following
comments with regards to engineering matters:
• Most of the garage and a portion of the driveway are being placed over an area with
existing hard cover. This slight increase in hard cover will generate a negligible increase
in stormwater runoff to the north.
• The landscape plan and grading plan do not fully match each other. The landscaping
plan shows paver patios, rock paths, and the removal of existing sidewalks. The final
plans should match and appropriate items need to be included in hardcover calculations.
• A required stormwater pond was never constructed with the 2006 or 2007 building
addition and parking lot expansion project. The current plan shows a pond in the
northwest corner of the property. Pre and post construction stormwater calculations
should be submitted showing runoff rates not increasing for the 2, 10, and 100 year
storm events. In this case, the pre-construction conditions should date to before the
previous (2006-2007) building addition and parking lot improvements. The post
construction conditions should be the currently proposed plan.
• This project will disturb more than 100 CY of material. Sediment and erosion control
information meeting the requirements of Orono's City Code 79-7(c)(2) must be
submitted. The minimum $2000 sediment and erosion control financial security should
be required of the owner for this permit.
If you have any questions, please call me at(651) 604-4894 or send an email to
darren.amundsenCa�bonestroo.com.
Yours very truly,
�_.� �
---�
Darren Amundsen
Cc: Tom Kellogg