Loading...
HomeMy WebLinkAbout2017-01011 - new structure/COO City of Orono CERTIFICATE OF OCCUPANCY TEMPORARY CERTIFICATE Building Address: 1920 FAGERNESS POINT RD PIN: 17-117-23-23-0031 Legal Description: Fagerness Block 000 Lot 027 Zoning District: Permit No: 2017-01011 Work Activity: Single Family Construction Type: 2015 MN Residential Building Code Occupancy: IRC-1 Occupant Load: Fire Sprinkler: N Applicant: Lecy Bros Homes Applicant Address: 15012 Hwy 7 City,State,Zip: Minnetonka,MN 55345- Owner Name: George&Nora Daum Owner Address: 1920 Fagerness Pt Rd City,State,Zip: Wayzata,MN 55391- THE FOLLOWING ARE NOTED AS INCOMPLETE OR MISSING.THESE MUST BE CORRECTED OR COMPLETED AND REINSPECTED WITHIN THE SPECIFIED NUMBER OF DAYS OR THIS CERTIFICATE WILL BE VOID Failure to correct these deficiences will cause occupancy violation citations to be issued To be completed by 09/04/2018: As-built survey to be submitted and approved showing: - All exterior improvements completed(driveway,etc.)and shown on as-built survey - Final grading completed and shown on as-built survey Erosion control to remain in place until sod/vegetation is established I '1 -re '' , .i ve c_r ,ctions and to call for reinspec o with the i/me al , .ed: ,! Contracto. ` ,A y7.3 (.3QGIS Dat= Aler/_: _= Q-A c/i 6 ' :—im_ ' ici.. Date _ 1v- Search-Select Inspection Date Time Inspector Inspection Type Stat H Permit# Address Permit Type Property Type Construction Type i _ I I , _ Plumbing-Rough In 2018-D0508=°(920Fag ern essPoint Rd°Plumbing •Residential Fixtures-Multiple Plumbing-final2018-00508 1920 FagernessPointRd Plumbing IResidential Fixtures-Multiple 1 2128/2018 112:00 AM BRAT Set&Seal Done By:Public Works[P Y {2018-00189 1920 F ag ern ess Point Rd WaterMeter-Residential]Residential WaterMeter-Residential 1116/2018 52:00 AM TIASR Mechanical-Rough In P V 2017-01679 1920 Fagerness Point Rd Mechanical j Residential 'Fireplace-Gas 4/24/2018 112:00 AM METJ --Mechanical-Airiest P Y 72-017-01679 1920 Fag ern ess Point Rd'Mechanical (Residential Fireplace-Gas 4/24120181 I 12:00 AM MET/ Mechanical-Final 1 P 1 Y ;2017-01679 1920Fagerness Point Rd=Mechanical Residential Fireplace Gas 12/12/2017112:00 AM METJ Mechanical Rough In Y 2017-01612 1920 Fagerness PointRdl Mechanical Residential Mechanical Multiple 1/22/2018 12:00 AM JASR Mechanical-Airiest 1P Y 2017-01612 1920FagernessPoint Rd{Mechanical Residential _...._.Mechanical-Multiple 3/7/2018 1200 AM METJ Manometer Test with Final IP Y2017-01612 1920FagernessPointRd1Mecharucal ResidentialMechanical-Multiple 4/19/2018 12:00 AM JASR Mechanical-Final P Y12017-01612 1920 Fagerness Point Rd Mechanical 1Residential {Mechanical-Multiple 1/22/2018 12:00AM JASR Mechanical-Roughh P IY 12017-01612 1920 Fagerness PointRd1Mechanical `Residential !Mechanical-Multiple 4 43/7/2018 1200AM METJ Mechanical-RoughIn IP V 12017-01612 1920 Fagerness PointRdiMechanical 1Residential i Mechanical-Multiple 11/16/2017 12:00 AM SOBR Sewer Connection/Air Testi Final P Y 12017-01511 1920 Fag ern ess Point Rd:Sewer&Water 'Residential 1Connection 12//12017 12:00 AM JASR Plumbing-Rough In P V 2017-01246.1920 Fag ern essPoint RdlPlumbing –lIResidential (Fixtures-Multiple 4/19/2018 12:00 AM JASR Plumbing-Final 1P Y 2017-01246 1920FagernessPointRdfiPlumbing ;Residential ;Fixtures-Multiple 1/912018 12:00 AM METJ PlumbingRough In _ , - g TP Y ;2017-01245 19?€Y Fa ernes Point Rd Plumbing �Residential 'Fix#urea-Multiple 10/512017 12:00 AM SOBR Final P 12017-01221 9 ! Y 2017 01221 1920 Eagerness Point Rd Sewer&Water Residential Disconnection 10/10/2017 12:00 AMSOBR Sewer Con n ection/Air Test/Final P YJ2017-01221 1920 Fagerness Point RdrSewer&Water ,Residential ;Disconnection 10/11/2017 12:00 AM JAM/ (Before)Backfill P IY 12017-01185 1920 Fagernes%Point Rd D molition Residential !Demo-PrincipalStructurej 4/24/2018 12:00 AM METJ Final Y P !2017-01185 1920 Fag ernessPoint Rd:Demolition Residential 1 Dem o-Principal Structurei -11 I — Silt Fence(Install ed&Inspected) 1 2017-01011 1920 Fagerness Point RdiNew Structure Residential 1Single Family 1119/2017 12:00 AM ROGP Footing Reber) IP V 20/701011 1920 Fagerness Point Rd NetivStructure Residential �SingleFamily I 12/1212017T-1-21-:0-0Alu4 METJ Radon Rock Bed(Poly) JP Y ;2017-01011 1920 Fag ern essPoint Rd{New Structure Residential Single Family 11114/2017112:00 AM METJ Poured Wall(Foundation) IP Y 12017-01011 1920 Fagern essPoint Rd New Structure Residential Single Family 1 Foundation Water Proof(Drain Tile)I 12017-01011 1920 Fagerness Point Rd New Structure Residential Single Family i 12:00AM GMAT Foundation SurveyB14Water 2017-01011 1920 Fag Point Rd New Structure 1 11/16/2017 Residential 1 Single Family 11 1/23/2018 •12:00 AM JASR Framing IP Y 12017-01011 1920 Fagern ess Point Rd New Structure !Residential SingleFamily 1/29/2018 112:00 AM METJ Insulation P IY 2017-01011 1920 Fagerness Point Rd!New Structure Residential 1 Single Family Lath 1 1-1- 2017-01011 12:00 AM METJ Final P ..Y 2017-01011 1992Faef 0gnessPointRd New Structure Residential ;Single Family 4/24/2018 Fag ness Point Rdl New Structure Residential I Single Family As-Built Survey -.2017-01011 1920 Fagerness Point New Structure ,Residential Single Family Escrow Refund Requested 1 2017-01011 1920 Fagern ess Point Rd1 New Structure 1 Residential 1 Single Family — Escrow Refunded 2017-01011 1920 Fagerness Point New Structure Residential Single Family Torque Logs 2017-01011 1920 Fagerness Point Rd;New Structure Residential i Single Family 12/14120/7 12:00 AM ROGP Footing(orRebar) P Y 2017-01011 1920 Fagerness PointRdlNewStructure Residential Single Family Escrow Refund Requested 2016-01152 1920 Fagerness Point Rd Escrow Fee-Applicant ?Residential Escrow Fee-Applicant Escrow Refunded 2016-01152 1920 Fagerness Point Rd EscrowFee-Applicant Residential `EscrowFee-Applicant 1/22/2008 12:00 AM TEMP Final P Y 2007-11347 1920 Fagerness Pt Rd Minor Alterations ;Residential 1 Siding 8114/2001 12:00 AM LOMA Re-roof P Y 12001-04145 1920 Fagerness Pt Rd Minor Alterations Residential 1 Roofing-Asphalt 11/13/2001 12:00AM TEMP Final P 1Y 12001-04145 1920 Fagerness Pt Rd Minor Alterations Residential iRoofing-Asphalt / SOf- 1/ AT/7 TIME CITY OF ORONO CALLED IN �� INSPECTION NOTICE /SCHEDULED /�/ 7 r k) PERMIT NO.<)l 7 / I! CO •LETED ✓ /� ADDRESS /9 7 ) / ' .� / ,/ edi— IT' 1) OWNER T y4 PHONE NO. 012'7(15—l 7 3cT CONTRACTOR 0.3 DESCRIPTION 1/ V 1 ( rvi / if W ❑ FOOTING 0 MO-FINAL SEPTIC NAL Q ❑ POURED WALL 0 PLUMBING RI ❑ EXCAV/GRADING/FILLING O ❑ FOUNDATION DRAIN TILE 0 PLUMBING FINAL 0 TREE REMOVAL ❑ LATHE 0 MECHANICAL RI 0 SITE INSPECTION Q 0 FRAMING 0 MECHANICAL FINAL ❑ RATED WALLS is ❑ INSULATION 0 WOOD BURNER/FIREPLACE 0 COMPLAINT Q ElFINAL 0 WATER HOOK-UP ElFOLLOW-UP 2 0 AS BUILT-SURVEY El SEWER HOOK-UP ElFOUNDATION/REMOVAL v ❑ DEMO-SITE 0 SEPTIC INSTALL 2 OWNERICONTRACTOR TO MEET YOU:_YES_NO vii COMMENTS: W a 6 l eor6� r�k ,(a�1 o - R a-Pb.t yeL� ow o-f- A:5`->"- v cc ®3'`�, b rI'e 0 14. QO9e4 ei-rith to wS -- 5 r=ye. - - - 4 0, S I` �p e,, - "`� im im cc W ad.wciRK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE CCW LI CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY O 0 CORRECT WORK,CALL FOR REINSPECTION TEMPORARY ✓ BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on site: Inspector. L/���pi:-./W---- White Copy/Inspector's File Canary Copy/Site Notice 32--t— .--<64 DATE TIME CITY OF ORONO CALLED IN _�— / / / INSPECTION OTICE alb` SCHEDULED / /7 l: PERMIT NO.c.,2 // �� CO PLETED ADDRESS / 9?1`) J\-EL.f1,.d /0- OWNER T EPHONE NO. ' 76:`i 1.-5511 CONTRACTOF�`-'7 .5 . 3: DESCRIPTION e--thi/e-- Y1.44-1 W ❑ FOOTING 0 DEMO-FINAL 0 SEPTIC FINAL Ll.. ❑ POURED WALL 0 PLUMBING RI 0 EXCAV/GRADING/FILLING Q ❑ FOUNDATION DRAIN TILE 0 PLUMBING FINAL 0 TREE REMOVAL ❑ LATHE 0 MECHANICAL RI/ 0 SITE INSPECTION Q 0 FRAMING 0 MECHANICAL FINAL 0 RATED WALLS ❑ INSULATION 0 WOOD BURNER/FIREPLACE 0 COMPLAINT ;IT▪ 0 FINAL 0 WATER HOOK-UP 0 FOLLOW-UP W 0 AS BUILT-SURVEY 0 SEWER HOOK-UP 0 FOUNDATION/REMOVAL v ❑ DEMO-SITE 0 SEPTIC INSTALL Z OWNER/CONTRACTOR TO MEET YOU: YES NO r0.) COMMENTS: cc Li, Adall Q. J s �� V C cz 41.E 1 0'4 tr o Ckiaimy ;i i/dre.e.- W ec Q iiiLie 2 (. lr!/!cr�Q 4.'1°t jL-9a7 W Wc(741,4:1, +19 pleyv, a WRK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE CC 0 CO ECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY O ❑CORRECT WORK,CALL FOR REINSPECTION71.1TEMPORARY 0 BEFORE COVERING PERMANENT LI CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN IDSTOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 OwnerlCon • . >on site: Air Inspector i � ' . Aa White Copyllnspector's File Canary CopylSite Notice Com ' DATE TIME i CITY OF ORONO CALLED IN INSPECTION NOTICE SCHEDULED /ij : /70 PERMIT NO. (90 �' U la I COMPL ED ADDRESS / --A; / PI- R OWNER - fq E . • ONE NO.> 2)- lag 9ab/ CONTRACTOR 5 , DESCRIPTION afYi -71.. ty ❑ FOOTING 0 DEMO-FINAL 0 SEPTIC FINAL Q ❑ POURED WALL 0 PLUMBING RI 0 EXCAV/GRADING/FILLING Q ❑ FOUNDATION DRAIN TILE 0 PLUMBING FINAL 0 TREE REMOVAL ❑ LATHE 0 MECHANICAL RI 0 SITE INSPECTION Q 0 FRAMING 0 MECHANICAL FINAL 0 RATED WALLS Z ❑ INSULATION 0 WOOD BURNER/FIREPLACE 0 COMPLAINT Q ❑ FINAL 0 WATER HOOK-UP 0 FOLLOW-UP W ❑ AS BUILT-SURVEY 0 SEWER HOOK-UP 0 FOUNDATION/REMOVAL v ❑ DEMO-SITE 0 SEPTIC INSTALL Z OWNERICONTRACTOR TO MEET YOU:_YES_NO v) COMMENTS: /,,591./1 er� 1+a f 170 ) i-S t.,-:+1-.1r% a Lt a4 .S-6 a '.S 1-.'>n I S l fa:4 q,..2 1.,,,,s4 o &rt.&47 td at,krI C V 1(L \- ' t a � uh , N\l/ o „,,,,. Ca " rlt .'-.' 4- IQ CC Q 2 W Z WCC 1 I CI W ❑WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE WN CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY 0 CI CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED O INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on site: Inspector. r, 41 ihN White Copy/Inspector's File Canary Copy/Site Notice C.:_, DATE TIME CITY OF ORONO CALLED IN INSPECTION NOTICE , SCHEDULED 1-;29-/g /4 30 PERMIT NO., O(7 Q Cl I COMPLETED ADDRESS /9 C �� ;�/1-E-s 5 PT/ 4C-U / OWNER TELEPHONE NO. 4•'S/ /1 `,5V/ CONTRACTOR Z-6-Cy I f of S .. /`(i DESCRIPTION / 2M 5 W ❑ FOOTING 0 DEMO-FINAL 0 SEPTIC FINAL Q ❑ POURED WALL 0 PLUMBING RI 0 EXCAV/GRADING/FILLING Q ❑ FOUNDATION DRAIN TILE 0 PLUMBING FINAL 0 TREE REMOVAL ❑ LATHE 0 MECHANICAL RI 0 SITE INSPECTION _ 0 FRAMING 0 MECHANICAL FINAL 0 RATED WALLS is XINSULATION ❑ WOOD BURNER/FIREPLACE 0 COMPLAINT Q ❑ FINAL ID WATER HOOK-UP 0 FOLLOW-UP W ❑ AS BUILT-SURVEY 0 SEWER HOOK-UP 0 FOUNDATION/REMOVAL 2 J ❑ DEMO-SITE 0 SEPTIC INSTALL 2 OWNERICONTRACTOR TO MEET YOU: YES_NO • COMMENTS: F(44464S eo v reJbdt 'Mt/f 0 ccQ. o :kfie/f5 b4a p 1, .,g .cc ,,/ r o C r' seG/-L• Agit cIasee saFr-e 4 W Q 44.L. QUA• ra�wc 4ql v#mss- a f4, 1C1'ene a ''45 aim— Gdrrercl.%s 1r,/oceo0J W WZ 0 I..K�s 04- r�t5,p• IQ• WOR ATISFACTORY:PROCEED ❑ PROJECT COMPLETE Ct W 0 CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY CI 0 CORRECT WORK,CALL FOR REINSPECTION TEMPORARY OV BEFORE COVERING PERMANENT 0 CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED 0 INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on site: Inspector. (9 / White Copy/Inspector's File Canary CopylSite Notice SQ5t C., .--- v DATE TIME 1/ CITY OF ORONO CALLED IN INSPECTION NQ 41C/gi -NO// S HEDULED / //D•T(/ PERMIT NO. aV OMPLETED // ADDRESS / 9 Z1 / 41 Pr ,� OWNER _% 1" LEPHONE NO.0/ f-2 ' / CONTRACTOR f / • DESCRIPTIONl"?-ziu1 / V e L/ ....W ❑ FOOTING 0 DEMO-FINAL ❑ SEPTIC FINAL Q ❑ POURED WALL 0 PLUMBING RI 0 EXCAV/GRADING/FILLING " 0 FOUNDATION DRAIN TILE ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ LATHE 0 MECHANICAL RI 0 SITE INSPECTION Q 0 FRAMING 0 MECHANICAL FINAL 0 RATED WALLS ❑ INSULATION ❑ WOOD BURNER/FIREPLACE 0 COMPLAINT v }:EINAL 0 WATER HOOK-UP 0 FOLLOW-UP tai 0 AS BUILT-SURVEY 0 SEWER HOOK-UP 0 FOUNDATION/REMOVAL v ❑ DEMO-SITE 0 SEPTIC INSTALL Q OWNER/CONTRACTOR TO MEET YOU:_YES NO y COMMENTS: / 'C. /- r 1a : - -023 —/� a VS�CC a_IleAetese(44s - plec . mos/lobs e �/ 'Om 'P. cc O >--- �ou�e{ �Oor �cse• ✓esI.41ts /o4,6e' i .:.. 04e�,(- ° roO,A .- £ /I qbt, 4 4t�.G ;4sk/ . r /..6. W cr - E7ress - o K 564r-is o4./« �4,.� 4 ,6-- C Q a - 5 ...t ...i. c-.0 . G,O _ - p,� IQ - if( y,/d r k a iii,It i e. - no J4.4.,„, 0 71%-s T...ee ES C�Pror•Qe .0.,‘- 6a-le- .5w1 Vele orauscrow 0 02e5,,,(4 /(- a ❑WORK SATISFACTORY:PROCEED OJECT COMPLETE CC W ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY 0 El CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on site: Inspector. 9-7/1", White Copyllnspector's File Canary Copy/Site Notice DUCT LEAKAGE TEST Building Knowledge, Inc. PO Box 1376 Burnsville, MN 55337 Phone: 952-944-5605 Date of Test:4/18/18 Technician: Pat O'Malley Test File: 1920 Fagerness Point Road_Duct Test_18APRIL18 Customer: West Metro Mechanical Building Address: 1920 Eagerness Point Road 220 N Franklin Street Orono, MN Norwood Young America, MN Phone: 952-215-8174 Fax: Test Results 1. Measured Duct Leakage: 29.0 CFM /5.5 sq. in. (+/-0.0%) 2. Duct Leakage as a Percent of System Airflow: 7.2% 3. Duct Leakage as a Percent of Building Floor Area: 2.8% 4. Leakage Split: Supply Side: 14.5 CFM /2.7 sq. in. Return Side: 14.5 CFM/2.7 sq. in. 5. Duct Leakage Curve: Flow Coefficient (C): 4.2 Exponent (n): 0.600(Assumed) 6 Test Settings: Test Mode: Depressurization Test Pressure: 25.0 Pa Equipment: Series B Minneapolis Duct Blaster Test Type: Total Leakage (Duct Blaster Only) Estimated Efficiency Loss from Duct Leakage: 1. Annual System Efficiency Loss: 27.5% Building and System Parameters: Floor Area: 1025 sq.ft. Average Supply Operating Pressure: 373 Pa System Airflow: 400 CFM Average Return Operating Pressure: 373 Pa Supply Leakage Split: 50% Supply Leakage Penalty: 1.0 Return Leakage Split: 50% Return Leakage Penalty: 0.5 Percentage of Measured Leakage Connected to Outside: 100%(29.0 CFM) 41( D DUCT LEAKAGE TEST Page 2 Date of Test:4/18/18 Test File: 1920 Fagerness Point Road_Duct Test_18APRIL18 Data Points- Data Entered Manually; Duct Fan Fan Flow Fan Pressure (Pa) Pressure(Pa) (CFM) % Error Configuration 0.0 n/a -25.0 22.6 29 0.0 Ring 3 0.0 n/a Comments MN Code Duct Leakage Target=<3 CFM25 per 100 square feet of floor area Target leakage=3 CFM25* (1,025/100) =31 CFM25 Actual leakage=29 CFM25=2.8 CFM25/sq.ft. 29 CFM25<31 CFM25= PASS h � Christine Mattson From: Christine Mattson Sent: Thursday, November 16, 2017 9:37 AM To: 'Mike Mann' Cc: Roger Peitso; Melanie Curtis; Monica Fadness; Nola Dickhausen Subject: RE: 1920 Fagerness Point Road/#2017-01011 Mike, We have reviewed and approved the foundation as-built. The foundation as-built survey was submitted based on measurements taken from the top of the form, prior to the pouring of the concrete.You may keep your inspection schedule for Friday. A copy of this email authorizing you to proceed should be kept on with the inspection card. Please don't hesitate to contact us if you have any questions. Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway E Orono [ MN 1 55356 (physical address) PO Box 66 Crystal Bay I MN ` 55323-0066 (mailing address) 9 952.249.4620 E 8 952.249.4616 M cmattson@ci.orono.mn.us 1 -8 www.ci.orono.mn.us Office Hours: Monday- Friday 8 am to 4:30 pm OUR OFFICE WILL BE CLOSED: November 23&24, 2017 December 22& December 25, 2017 January 1, 2018 From: Mike Mann [mailto:mikemann@lecybros.com] Sent:Tuesday, November 14, 2017 9:14 AM To: Roger Peitso<rpeitso@ci.orono.mn.us>; Melanie Curtis<MCurtis@ci.orono.mn.us>; Christine Mattson <CMattson@ci.orono.mn.us> Subject: RE: 1920 Fagerness Roger- I've forwarded your email to the surveyor. He will be emailing you directly this morning. Thanks. Mike From: Roger Peitso [mailto:rpeitso@ci.orono.mn.us] Sent:Tuesday, November 14, 2017 9:10 AM To: Mike Mann <mikemann@lecybros.com>; Melanie Curtis<MCurtis@ci.orono.mn.us>; Christine Mattson <CMattson@ci.orono.mn.us> Subject: RE: 1920 Fagerness Mike, 1 I see that you have sent us the asbuilt survey but I am not sure how the surveyor checked the heights the foundation because we have an inspection scheduled for the poured walls at 11:30am today.So we will not accept this survey because it would be impossible for the surveyor to check heights yet.When you have an updated survey please send it in and we will review it.Any questions please call. Sincerely, City of Orono Roger Peitso Building Official Phone: 952-249-4600 Direct: 952-249-4625 Email: rpeitso@ci.orono.mn.us Fax: 952-249-4616 From: Mike Mann [mailto:mikemann@lecybros.com] Sent:Tuesday, November 14, 2017 8:29 AM To: Melanie Curtis<MCurtis@ci.orono.mn.us>; Christine Mattson <CMattson@ci.orono.mn.us>; Roger Peitso <rpeitso@ci.orono.mn.us> Subject: 1920 Fagerness Please see attached foundation "as built" survey for new home currently under construction. Let me know if you need a hard copy as well. Thanks. Mike Mike Mann Estimator/Purchasing ,;z.ec Aros. HOMES ork REMODELING 15012 Highway 7 Minnetonka, MN 55345 Direct 952.746.3783 Office 952.944.9499 Fax 952.942.1068 mikemann@lecybros.com www.lecybros.com 2