Loading...
HomeMy WebLinkAbout#6774-Prelim plat/rezoning-2017 ���p CITY OF ORONO RESOLUTION OF THE CITY COUNCIL y� � NO. 6774 L `qkESH��� A RESOLUTION GRANTING PRELIMINARY PLAT AND REZONING APPROVAL FOR PROPERTY LOCATED AT 800 NORTH ARM ROAD FILE N0. 16-3883 WHEREAS, Kevin Anderson, an individual (hereinafter the "Developer") is the agent for James Franzel, an individual, the owner of the property at 800 North Arm Drive (hereinafter the "Owner") within the City of Orono (hereinafter the "City") and legally described as follows: Lot 9,Auditors Subdivision No.362 and Outlot 1, Pirates Cove Hennepin County,Minnesota (hereinafter the "Property"); and WHEREAS, the Developer has requested Preliminary Plat Approval for subdivision of the Property for construction into 3 single family lots; and WHEREAS, on June 13, 2017 the Developer completed their application originally filed on October 19, 2016 for preliminary plat approval for the proposed subdivision of the Property; and WHEREAS, after due published and mailed notice in accordance with Minnesota Statutes 462.358 et. seq. and the City of Orono Zoning and Subdivision Codes,the Orono Planning Commission held a public hearing for the application and reviewed it on April 17, 2017, at which time all persons desiring to be heard concerning this application were given the opportunity to speak thereon; and WHEREAS,the Planning Commission on April 17, 2017 recommended on a vote of 6-0 that the Council approve the preliminary plat subject to a number of conditions and recommendations; and WHEREAS, the City Council hereby makes the following findings in regard to this application for Preliminary Plat approval: CITY OF ORONO RESOLUTION OF THE CITY COUNCIL 6774 NO. FINDINGS l. The Property is located within the Metropolitan Urban Service Area(MUSA) and is intended to be developed using municipal sewer and water. Municipal sewer will serve the property. 2. The property contains approximately 4.02 gross acres. 3. Conservation Design. Pursuant to the City's Conservation Design ordinances the Developer has submitted a Conservation Development report prepared by ISG dated January 3, 2017. Key elements of the report include a Natural Resources Inventory of the non-developing portions of the site including review of the MLCCS Land Cover Classification data, wetland delineations (approved by the MCWD), site vegetation review, and outlining of a basic Conservation Design Master Plan. 4. Wetlands on Site and/or Impacted. The property contains a small wetland generally along the shoreline, primarily in Lot 1. This wetland is not proposed to be impacted. The reported MCWD base buffer width requirement is reported as 25 feet. The City code requires a minimum structure setback of 10' from the wetland buffer. The City will require a Conservation and Flowage Easement over the wetlands being preserved. 5. Streets. All 3 lots will be served by a new private cul de sac to be platted as an Outlot and be constructed by the developer to City standards. A113 lots will have driveways accessing the new road system. 6. Easements Required. Standard perimeter drainage and utility easements around all property boundaries as well as conservation and flowage easements over the delineated wetlands will be required. A new easement is proposed to provide for vehicular access to the existing lift station serving the Project. 7. Park and Trail Dedication. There are no identifiable public parkland needs at this location. However, development of the proposed housing will generate additional use of existing City park facilities in the area. The Council finds that no park lands need to be dedicated and the park dedication should be in the form of a Cash Contribution in Lieu of Lands as allowed by the Municipal Code. Additionally,the Council finds that although no public trails along the property boundaries are planned. Park dedication will be $11,100.00 CITY OF ORONO RESOLUTION OF THE CITY COUNCIL No. b 7 7 4 8. Stormwater and Drainage Improvements & Fees. The property will be subject to the Stormwater and Drainage Trunk(SW&DT) Fee. The Trunk Fee established in the 2016 Fee Schedule for 1-acre zoning districts is$5,250 per acre for each new lot being created, with a fee cap of 1.0 acre per new lot. Per Section 14-284, if the existing residence is intended to remain (on Lot 3), only Lots 1 and 2 would be subject to the SW&DT Fee. The total SW&DT Fee will be $10,500, based on the 2017 fee schedule. 9. Utility Locations/Availability/Assessments/Connection Fees.The property was assessed for 2 sewer units and 280 feet of frontage as part of the 1973 sewer project. For the proposed subdivision, no additional footage charge would be required, but a third sewer unit at the 2417 Connection Charge rate of$5,100 would be due upon final plat approval. 10. The applicant has provided a Certificate of Survey and Preliminary Plat attached to this Resolution as Exhibit B. Council finds that the plans submitted are generally sufficient to indicate the intent of the developer and the potential impacts of the project. CONCLUSIONS, ORDER AND CONDITIONS NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Orono hereby approves the Preliminary Plat for development of the property at 800 North Arm Drive subject to the following declarations and conditions: A. Project Specific Conditions 1) The width of Lot 1 may be 100 feet at the OHWL,rather than the required 140 feet. 2) Work with Public Works Department to identify, stake and show on survey an appropriate corridor through the property for sewer maintenance vehicle access. 3) House on Lot 3, if rebuilt, must completely meet 75' lake setback. 4) Average setback for each of the lots will be per the conceptual building pads shown on preliminary plat. However, once those initial homes are constructed, any future rebuild on any of those lots must meet the average setback established per the standard method based on then-existing adjacent lakeshore homes. B. General conditions imposed on preliminary plats shall apply, and are as follow: 1) Significant trees identified to remain shall be protected with snow fence at the drip line, and no material storage may occur within the fenced area. CITY OF ORONO RESOLUTION OF�I�Ci,T^COUNCIL T � �t NO. 2) Applicant to confirm with SHPO that that there are no archaeological sites within the property. 3) Appropriate traffic control signage within and pertinent to the site shall be installed by the Developer subject to the City Engineer's review and approval. 4) Applicant shall demonstrate to the satisfaction of the City Council that all requirements of the Minnehaha Creek Watershed District as administrator of the WCA regulations on Orono's behalf, are complied with. 5) Erosion control shall adhere to "Best Management Practices for Protecting Water Quality in Urban Areas" and to the approved SWPPP. All erosion controls as required by the City and the MCWD shall be in place prior to commencing grading and excavation on the site. All such erosion control measures shall be maintained in working order until the site is vegetated and stabilized. 6) The construction limits shall be clearly marked with adequate fencing to prevent any construction damage or disturbance of any trees and vegetation outside of the construction limits area. Developer shall identify trees to be preserved on site, shall mark them on a site plan, and shall take extraordinary measures such as fencing, signage, etc. to ensure they are not disturbed. 7) The applicable general engineering comments and or conditions provided by City Engineer Robert Bean dated July 21, 2016 and August 11, 2016 attached hereto as Exhibit C shall be suitably addressed by applicant in the development plan submittal. 8) This approval is based upon the known issues that may affect this project, but this approval does not limit the City from revising or amending these conditions as the review process continues. 9)This Approval shall be effective until June 26, 2018 per the provisions of Zoning Code Section 78-628. If General Development Plan and Final Plat Approval is not granted by that date, the terms and conditions of this resolution shall be null and void. The City Council at its sole discretion may extend this effective period. C. Plans and Specifications. The following plans and specifications shall be submitted for review and approval by the City and other appropriate jurisdictions: 1) Final plans and specifications for all proposed utility lines and services, including any proposed revisions to existing service facilities.Proposed plans shall be provided to the City for final review and approval with the Final Plan set. The Public Works Department and any other pertinent reviewing agencies shall review and approve all CITY OF ORONO RESOLUTION OF THE CITY COUNCIL b774 NO. utility improvements.Final sanitary sewer and watermain plans shall be provided and are subject to approval by the Public Works Department and City Engineer. 2) Final Street and Storm Sewer Plans. 3) Final Grading, Drainage and Erosion Control Plan and SWPPP showing existing and proposed contours, building locations, elevations, stormwater facilities and calculations, utilities and erosion control measures to be used during construction. General Development Plan Approval will not be granted until the Minnehaha Creek Watershed District has approved the stormwater plans. 4) Any additional plans and specifications deemed necessary by the City as review progresses. D. Platting Process.Applicant shall complete all requirements for Final Plat Approval as follows. The following list of final submittals must be submitted to the City Administrator 2 weeks prior to the regularly scheduled Council meeting on the second and fourth Mondays of the month. These submittals are as follows: 1). Record plat drawings in the form of two (3) mylar copies (one copy for the City's records and one for filing with Hennepin County) and one(1) copy reduced to 1" _ 200'. Drawing to include: A. Lot lines platted per preliminary plat survey/drawing by Gronberg and Associates dated May 15, 2017attached hereto as Exhibit B, except as modified herein. B. Dedication of "drainage and utility easements" 10' along exterior property lines and 5' along the interior property lines. C. Dedication of areas shown as wetlands. D. Dedication of"Drainage Easements"over all drainageways E. Name of plat. 2). Legal documents required: A. Title opinion addressed to the City or a title insurance policy in favor of the City. All owners, mortgage holders or others with property interest indicated therein shall sign the plat and all other documents affected by such interest. B. The applicant must provide certified copies of all recorded easements currently affecting the property. C. Signed Conservation and Flowage Easement to be granted over all delineated wetlands on the plat. CITY OF ORONO RESOLUTION OF THE CITY COUNCIL No. � 7 7 � D. Signed Developers Agreement and Letter of Credit for construction of improvements. The City Engineer shall establish the amount to be provided in the Letter of Credit. E. Signed Trail Easement over the northerly 10 feet of the property. 3). Final plat approval fee to be paid: Total due: $ 700.00 E. Development Agreement. Development Approval is contingent upon the successful execution of a Development Agreement between the applicant and the City. Such Agreement shall address all specific City requirements for the development. F. Financial Guarantee. The Development Agreement shall include a financial guarantee by the applicant to ensure the completion of site improvements. The City Engineer shall complete an estimate of improvement costs, including but not limited to private streets, curb & gutter, sidewalks, storm sewers, landscaping, grading, erosion control, utilities, driveways and parking areas, trails, sidewalks, retaining walls and stormwater management facility construction, and the applicant shall provide to the City a financial guarantee of 150% of the improvement costs. G. Fees. The following fees are due at the time of Final Plat approval. Storm Water and Drainage Trunk Fee. The property will be subject to the Stormwater and Drainage Trunk Fee, due at the time of final plat approval. The fee, based on the 2017 fee schedule, is 10,500.00. Park Dedication The City Code requires dedication of 8% of the land as public park, ar payment of the equivalent value in cash. The City Council has determined there is no need for dedication of land from the proposed development. Therefore the park dedication due at the time of Final Plat is $11,100. Sewer Connection Charges. Based on 2017 fee schedule, the fees are $5,100. Adopted by the Orono City Council on this_26th day of ,June , 2017. ATTEST: � -- Anna Carlson, Ciky Cle�k Dennis Walsh, Mayor