Loading...
HomeMy WebLinkAbout2013-01306 - new structure . . . CITY OF ORONO * z 0 1 3 - 0 1 3 0 6 * 2750 KELLEY PARKWAY DATE ISSUED: OU13/2014 ORONO,MN 55356- 952 249-4600 FAX: 952 249-4616 ADDRESS : 1376 NORTH ARM DR PIN : 07-117-23-41-0052 LEGAL DESC : SAGA HILL REVISED : LOT 000 BLOCK 008 PERMIT TYPE : NEW STRUCTURE PROPERTY TYPE : RESIDENTIAL CONSTRUCTION TYPE : SINGLE FAMILY ACTIVITY : 101-SINGLE FAMILY HOUSES,DETACHED VALUATION : $ 165,000.00 NOTE: SEPARATE PERMITS REQUIRED:PLUMBING, MECHANICAL,SEPTIC,FIREPLACE,GRADING,FIRE, WATER CONNECTION,SEWER CONNECTION,LAWN IRRIGATION,OTHER �� , WELL(STATE),ELECTRICAL(STATE) NOTE: PRIOR TO THE START OF FRAMING AN AS-BUILT FOUNDATION SURVE3'MUST BE SUBMITTED AND APPROVED BY CITY OR A STOP WORK ORDER WILL BE ISSUED. INITIAL: ���2 NOTE: AN APPROVED AS BUILT SURVEY IS REQUIRED PRIbR TO CERTIFICATE OF OCCUPANCY ISSUANCE. INITIAL:`�_ NOTE: BE AWARE,IN THE EVENT WEATHER OR OTHER CONDITIONS PREVENT THE COMPLETION OF AN AS-BUILT SURVEY AT THE TIME THE CERTIFICATE OF OCCUPANCY IS REQUESTED,A TEMPORARY CERTIFICATE OF OCCUPANCY MAY BE ISSUED APPLICANT PERMIT FEE SCHEDULE 1,446.75 STATE SURCHARGE(VALUATION) 82.50 FIELDSTONE FAMILY HOMES 801 CLIFF RD E S.A.C. 0.00 BURNSVILLE,MN 55337- TOTAL 1,529.25 (952)469-8800 Payment(s) Minnesota State License#: BUIL-BC631164 CHECK 5505 1,529.25 OWNER BOWEN,WILLIAM 1376 NORTH ARM DR MOiJND,MN 55364- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires sepazate permits. All provisions of laws and ordinances goveming this type of work shall be compied with whether or not speci£ed herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required insgections are requested in conformance with the State Building Code.This permit may be revoked at any time for due cause. ����-�' �� �3 � > � � � Applicant Permitee Signature Date Issued By i nature ��77(� Date City of Orono Building Permit Application for New Structures or Additions Mailing Address: ,.. Q PO Box 66 Permit number. b( -6 3(� � �� Crystal Bay, MN 55323-0066 oate received: �2- �l -�3 �1 StreetAddress:' Received by: ��� y\, ,� 2750 Kelley Parkway Plan review fee: F�� c? Orono, MN 55356 �'�fSHO�� Main: 952-259-4600 TotalFee: d013'Ol3D Fax: 952-249-4616 www.ci.orono.mn.us This application form must be completed in full and all required information must be submitted. Incomplete applications will be returned. (Please print) GENERAL INFORMATInN� �/ Job Site Address: � � N�; � (L b„� �j �' ,,� Will this be a Parade of Homes, Remodelers Showcase Home or other Display Home? ❑ Yes No If yes, a special event permit is required with Police DepaRment and City Council approval 60 days prior to the event. Shuttle bus service will be required unless applicant demonstrates sufficient on-site parking is available. Non-permitted events will not be allowed. CONTRACTOR/APPLICANT N ORMATION: Name: ' ,��'��'� ✓� �. State License# � Expiration Date: -l�f Phone: cell -�(, � " - office � - Mailing Address: p '� �� Cit : ' � ZIP: � Contact Person: f , v�1�� e � T�y�.(l�Applicant is: on ractor,�/ Homeowner �c��ae o�e� Email and/or Fax: ,��... L✓,� j i t��y� +�4����Cc�+e'-.a•C;r�ti -//����a'� !�1(G�s�`�r'���,lJ��o�*cg. C�.-•-� PROPERTY OWN R INFORMATION: Q Name: r�'G� �S ((%� Phone(day): - � C7- Address: J �„-•.• ;2 d Cit : Q ZIP: �� Email and/or Fax (��',' .z ' � ARCHITECT/ ENGINEER INFORMATION• Name: `,=c/(� �.� �'�,►�,�� j r���-P� Phone (day): 5�_��y-�/� Address: $�/ Gl,� /LD GF�- City: /°��,in ��e ZIP: -33 7 Email and/or Fax: ,�,4 v�-�� � 5 �.6n�_ PROJECT INFORMATION: Description of project: 1.Type of Project 2. Proposed Use 3.Structure Type 4.Sewage Disposal& New Construction Water Supply I� �Single Family with �Residence ❑Addition attached garage ❑ Garage/Accessory Bldg. �ublic Sewer ❑Accessory Building ❑ Single Family with ❑ Deck ❑ Relocation detached garage ❑ Office/Commercial ❑ Private Sewer ❑ Other:(specify) ❑ Multiple Family/Condo ❑Warehouse ❑ Public ❑ Storage ❑ Public Water *"Any earth movement may require ❑ Commercial ❑ Other(specify) MCWD review&permits. ❑ Industrial Private Well Minnehaha Creek Watershed District(MCWD) ❑ Other:(SpeCify) 18202 Minnetonka Blvd Deephaven,MN 55391 Phone: 952-471-0590 Fax: 952-471-0682 www.minnehahacreek.or Estimated Construction Valuation (excluding land) $ ��`��G� •�/� Packet Last Updated: 04/19/2013 Page 22 of 23 STRUCTURE INFORMATION: 1.Structure Dimensions 1. Structure Dimensions(continued) 2.Type of Construction a. Length(ft.)= �� Number of bedrooms=� �ood/Frame b.Width(ft.)= �� Number of garage stalls: ❑ Masonry Areas in sauare feet Attached = � ❑ Metal ❑ Pole Bldg. c. Basement= ��.1 •�- Detached = ❑ ICF d. 15�Story = �_ r � ❑ On-site Prefab e. 2"d Story= ❑ Off-site Prefab f. YZ Story = ❑ Other(please specify): g.Total Area= �� � ��� REQUIRED SUBMITTALS: All of the information must be submitted in order for your application to be processed: Not Enclo ed A licable ❑ Permit A lication ❑ Pro osed Buildin Plans ❑ ❑ MN State Ener Code Calculations and Mechanical Code Re uirements Form ❑ Surve meetin all re uirements � Stormwater Pollution Prevention Plan ❑ Hardcover Calcutation s Se tic S stem Site Evaluation Re ort ❑ O Access Permit ❑ Wetland Buffer Im rovement Plan ❑ f� En ineered Plans for Retainin Walls 4 feet or above ❑ ❑ Minnehaha Creek Watershed District Permit s �tJ Y w���� ❑ ❑ Plan Review Fee ❑ ❑ Other: APPLICANT/OWNER ACKNOWLEDGEMENT: • Agrees to provide all information required or requested by the Building Department; • Agrees to pay the City of Orono for engineering consultant review costs in excess of$500; • Certifies that the information supplied is true and correct to the best of his/her knowledge. The applicant recognizes that they are solely responsible for submitting a complete application being aware that upon failure to do so, the staff has no alternative but to reject it until it is complete; • Acknowledges the Escrow Agreement is completed and signed; • Understands some or all of the information that you are asked to provide on this application is classified by State law as either private or confidential. Private data is information which generally cannot be given to the public but can be given to the subject of the data. Confidential data is information which generally cannot be given to either the public or the subject of the data. Our purpose and intended use of this information is to annually update our records and records of other governmental agencies required by law. If you refuse to supply the information,the application may not be issued. • Agrees that in the event that weather or other conditions prevent the completion of an as-built survey at the time the Certificate of Occupancy is requested, a tempprary Certificate of Occupancy may be issued upon receipt of a $10,000 escrow to ensure completion of the as-builtfs�fvey and all site improvements. ApplicanYs Signature: Date: / ����� � � � Owner's Signature: � � ' '� `a-�"�f Date: Packet Last Updated: 04/19/2013 Page 23 of 23 , . � � ���.� ���EE1� ��E��C�����' F�� ['�E� ���E��T���� E �,QE�[��4�l� AddresslParrnit Niwmt��r: �� f � 1 �� � �r � � ��Q.� Description of wock: 1�f �l�6V �` �` �dl� Septic review by: � ��te ApProved: � �...' �...7' � Zoning review by: Date Approvecf: b� ��� ; . Building review by: Date Approved:,� Gradfng revi�ew by: �'i : ^ Date Approved: : /� a�' , � Zoning Di�trict: Zoning FEfe#:" �� Reso#: lteso Date: /'r : . o Zon�ng: Lot Area: ��� F AC 4'itidth: Lot Cov rage: �i� SF�/o Survey Subrnitteci: �Yes � No Date of Survey: ��I�/� 6� � Re�ised da�el?l� Rro osed Setbacks. Front(Lake3 Rear(Street) ( W S E w 1 ( i� S E 1�l I: Other�uiidings 1�letland Sid� Sicte , ; _ . D�#ined Hefght: n �,� Pe�k t�e�ght: FFf:��� FF�minu� 6 feet"=�(Existir�g Corstoai R�rimeter(linear feetj= 5Q°k= #o#Stories Ok?�ES ; FOR A BUILDING W1TH A BASEMENT OR CRAWL SPAGE: ' . . , /��,.y TAe distance between ihe lowest �'OR A BUILDING ON A S�AB FOUNDATiONC� , ` � � ,START WITH proposed floar(of the basement or�raMA' � ' spac�)and the highest point of the roof.' STAR7 WITH T�distance b6tween the top of Slab and If you heve a... `. , the highest po't�t of th6"reof. • GABLE OR HIPPED ROOF(no If you fiave a.;. : • GABL�O�`t HIPRED ROOF(no wintlows): SLbVact haH fhe windows);SuMract fialf tl�e'distanc distanoe between the highest point qpttiveen the hi�hest poirlt bf the roc of the roof to the bw point of�e '� 'SUBTRi4CTION correspontling gable oF fiipped roof SUBTRACTION ��e,low�fo�nt of�hQ cqrr�sptmciin ,..s` (BAS�Q ON ROOF , `9�ble or hipped roof . GABLE OR•HIPPED ROOF(with (BASED ON . 'C,�ABLE pR HIPPEA R04�"(with � . TYp� . windows): SubVact half the � ROOF TYPE) Y windovVs� -SUbtr��t 1i�If Uie df�tanc � ' dis�nee be.tweenthe top of the , . > .. . ::between�e iop of,ttie higfieSt .> Mighest window and the highest . wint�pw'v�ni!tF�highe5t poii5t of the ; � . • , point of the roof ,, , , - . _ , roof -;>;; ` ' • ALt OTHER R60F TYPES(flat, '. � • ; ALL OTH�R RbQF TYPES�fi8t, � } mansard,etc):No subtraction. mansaril� � No subttadioh. AkDDtTiON Add tMe dlSfa�Ce beiyiee��1e tOp cf sfab SWbfrBCf. e dista�Ce between fhe' �Y' t.�� � �SUBTRACTIOM � �Eq ON and.t(�e higheSt e�dadng gr�de,edjacent f� s '� � ;�ASEb ON�XISTING ������space floor and the €XISTIWG 4ie founda�lon. hiphest existing grade ad cent to the �' �' J ��` ` <Gi2ADES) � , : GRAUES ,: . ' . , foundatibn OR 1 o feet(whichev@r is lessj. �EaUAIS Defln' bWltfing he1gML. • .� ' ; ��7 EQUALS (�eflned building he1gM ; �.f .�,/' '' : . ` : � : ' :' . ' .' . � :' - , , ' � . , ,=. , Shoreland Distri�t `` MCWb Perrrrit Received Avera e Lakeshore$et ck Met? , Btu > � Yes � No G N/A CI Yes No � Yes O No G Yes Q No N!A � rmit Number. � .,..., Z, : �etbaal�: � �fi�rmvirat�r Quality Existin� Proposed llari�nce Re ui Overla District Tier- Fiardcaver Hacctcover � �d CUP Required a . . . � Yes , o G Yes No � � J���� TYpe(S)� T e s : �`�l�' �� t�� Yp � ) Updated: January 2013 v:\formslplan review checkiist 2013.docx REthl!lARKS (in-house): fees ta be Cfia ed • "�''fa' �'1� � . . . - - �p >�:'.`%� ��i f . .. . .. . ..".m � ' ., . ... ..r,.., v, .N, .r . , ...- v . ,. .- . Plan Review . � - . . � , , . ,.. ... ,.; ��- . . : . . :.�: t� i� -_ .�a, � � � � _ . ... _, . _,. ..:� . .... - . lnvestigatiot�Fee ' . . �,y.� . ' � g �; . . � � �1V��ii��aYiil`��'V#l�.:;. _ �.rySE..'i,e�,f �"� J �t7.i . . : . . . .. . ' .o...: . . . .. . � . . . . Ot�t@1($p@Cif�/� S uare Foota e S .er 5 uare Foota e Basement � x ' l & ,SO = $ / ��j;.�'a 1�`Floor 90 3 X �'s 5• ?3 = S � `�Y , ��j 2`"'Floor 1 f Y�► X 5�5; 7.� ' $ l o y.1 bt�-.s�� , Garage ��5, X; , �(D, `'e) _ � �� �9 3.�$ Estim�te�i Construction Value: � �39,g`I3 .�� Orono ir�spections Required ;Vilork Reguiring Separate Pemtets ' Required State Pennit�s ' i3 Si#e .� Plum6ing G Grading/fiNing ' �Wsll . Q Hardcover Removal � Mechanical CI Fire Electrical Footing p Se�fic t7 Water Conr�ection j�Poured•Wall .Pl Fireplace Ja' wer C�necti�on �oundaticsn Surve Et asonry Lawn Irrigation � Y �'Radan R�ck 8ed Mf9• ' �Frarr�ing fl Other(specify) Insulation -Built Survey ': ,Fina1 II ;etland 8u#fer E] Otlier lspecify) , • . . ` REIV�ARK3 (in-house): �Mer Rev�ew: Reviewed by: � Date Approved: Access: Existing: ,C! YES t1 NO New: II YES L1 NO UFF1CIAl REMARKS-TO BE OT�D ON PER1Vf[T ND tNiT�A�.LED '� ' ��� � Updated: January 2013 v:\forms�plan review checklisY2013.docx ' . � � . DATA PRIVACY ADVISORY In accordance with Minnesota State Statute 13.04 Rights of Subjects of Data, Subd. 2, "Tennessen warning", we would like to inform you that your request for a permit or license from the City of Orono or any of its departments may require you to furnish certain private or confidential information. You are notified that: 1. The information you furnish will be used to determine your qualification for the permit or license requested. 2. You may refuse to supply data, but refusal may require that the City deny the permit or license. 3. The information may be shared with other local, state or federal agencies to the extent necessary to process the permit or license. 4. If your requested permit or license requires Council action to approve, some information may become public. 5. You have certain rights under Minnesota State Statute 13.04 (see following page) to review private data on yourself. 6. Your full name is required to process this application or permit. - �C ll�S�� �ti y ��e `^ _ /Y�.� w�t�-e First Middle Last �� ( � � C 1��� 6L� . Address �71,c P /t�,�-�1��-� �°vl� � S�� 7 '/�s�'y6�--�J�� City State Zip Phone I understand my r' stated above. ignature Packet Last Updated: 04/19/2013 Page 20 of 23 � i , . (Top a tnenss r.�«wd 1br r.cordiAg daf� TRusTEE'S DEED Mnn�ota tM�orm Comwy�nai�p BWtMcs �����T_ • Fcnn 10.4.1(ZM3l � e� 17��� DEED TAX DUE: ��03�� DATE Sepb�mber 18,2013• . � F4R VAi.UABIE CONSIDERATION. VY�rt E Bo�er�, as Trusbee ofi WlMlam E Revocable Trust und� . • p�inpe�iy�Hennep�Courtty� nnew�Is�a�Y�deacribed as 1bNo�rs� �ik�airra O�le Ca ranb«s)"). r�eat ' �^�./I Lo�s 15 auxi 48,�odc 8,Ssga F��R�.aooadk��c the�at thersof on flls and of rocord tn the a�lice of the Regis�er af Oesds,M►and for Hennepin Counly,Mh�esot�. / �-� ��c G�. `��.�c'r�5�}.j,r abatrad propeRy C.1red�c he�ll a�or patf of the des�bed ro�l p�eKY is Re�d{Tomer+sl a �ogetl�w�h s�henee�amerrts and appurt�st�ces beiongk�g therem. Ch�k�pplkxWs bo�c a� p The sMer o��n�s s�aoa na w�aN►a arn►,�.on tt�o dsealbsd ro�l ptopaely. �. S� A wN dhdos�r+s owtlAcals a000n�r�s tHs doaanent ar h�s • rn�mi �3�t�o��lod,inpet VWC ��dT�WNl16un E.Bow►en. D !sr►�4'en�9iuwdh 1he prcperqi de�aibed in this inelnanent and! cu�f�►that�s�ous aid ewanbar of v�Is a�fie qsecxibed re� dNClOsuro oeA�ls. s�Ihe IaR prsviO4la�/flled Mldil ��d Tmws) RETY�It T0� . BA�XERS CLQSIN6 SEgY10ES 399 il 98RNSIIILLE P[11Y . suiTE too BURNSYtLtE. KM 5b8�� Fp�No.13.St P�1�� ( •- � . • l�C � �'J�1� �� �� � V�. � Melanie Curtis � From: Ashfeld, Daniel [Daniel.Ashfeld@bestbuy.comJ Sent: Tuesday, January 14, 2014 9:39 AM To: Melanie Curtis; 'Joel Route' Cc: Christine Mattson; Lyle Oman; Jesse�ave;-T�nt-�ohr�so�'; 'bryanw@fieldstonefamilyhorr�s.com'; Barb Silus;`9flonica Fadness Subject: RE: 1376 North Arm Driy�- Permit#2013-01306 i . Melanie, Yes, I acknowledge this information below. Thank you, Daniel Ashfeld Operations Manager, Marketplace Daniel.Ashfeld@bestbuy.com 612-291-1000 Office 612-807-3943 Cell From: Melanie Curtis [mailto:MCurtis@ci.orono.mn.us] Sent: Tuesday, January 14, 2014 9:37 AM To: Ashfeld, Daniel; 'Joel Route' Cc: Christine Mattson; Lyle Oman; Jesse Struve; 'Trent Johnson'; 'bryanw@fieldstonefamilyhomes.com'; Barb Silus; Monica Fadness Subject: RE: 1376 North Arm Drive - Permit #2013-01306 Dan If you would simply acknowledge your receipt of the information to me it will be sufficient for the permit file. Thank you Melanie Curtis � 952.249.4627 � mcurtis@ci.orono.mn.us From: Ashfeld, Daniel [mailto:Daniel.Ashfeld@bestbuy.com] Sent: Tuesday, January 14, 2014 9:36 AM To: Melanie Curtis; 'Joel Route' Cc: Christine Mattson; Lyle Oman; Jesse Struve; 'Trent Johnson'; 'bryanw@fieldstonefamilyhomes.com'; Barb Silus; Monica Fadness Subject: RE: 1376 North Arm Drive - Permit #2013-01306 Joel, Do you need me to initial these? Daniel Ashfeld Operations Manager, Marketplace Daniel.Ashfeld @bestbuv.com 612-291-1000 Office 612-807-3943 Cell From: Melanie Curtis [mailto:MCurtis@ci.orono.mn.us] Sent: Tuesday, January 14, 2014 9:33 AM 1 � , . . To: 'Joel Route' Cc: Christine Mattson; Lyle Oman; Jesse Struve; 'Trent Johnson'; Ashfeld, Daniel; 'bryanw@fieldstonefamilyhomes.com'; Barb Silus; Monica Fadness Subject: 1376 North Arm Drive - Permit #2013-01306 ]oel As you are aware, your permit #2013-01036 for 1376 North Arm Drive was issued yesterday. Our permitting software was recently updated and we have discovered an apparent glitch in the permit card format. The standard informational disclaimer wording printed on each permit regarding Temporary Certificates of Occupancy (TCO) is cut off... I want to make sure you are aware of the TCO escrow requirement of $10,000. This is what was apparently cut off of the disclaimer. Please be aware, the informational disclaimer on the permit card should read: Separate Permits Required: Plumbing, Mechanical, Septic, Fireplace, Electrical (State) NOTE: Prior to the start of framing an As-Built Foundation Survey must be submitted and approved by city or a stop work order will be issued. Initial: NOTE: For any retaining walls 4 feet or higher or not meeting the required separation submittal of wall plans signed by a registered professional engineer will be required prior to the release of the escrow. (initials) NOTE: An approved As Built Survey is required prior to Certificate of Occupancy issuance. Initial: NOTE: Be aware, in the event weather or other conditions prevent the completion of an as-built survey at the time the Certificate of Occupancy is requested, a temporary Certificate of Occupancy may be issued upon receipt of a $10,000 escrow to ensure completion of the as-built survey and all site improvements. Initial: Please contact me if you have any questions on this matter. I will place a copy of this email in the property file as your notification about the TCO escrow and as-built foundation survey and final as-built survey requirement. Thank you and I apologize for any inconvenience. Melanie Melanie Curtis Planning &Zoning Coordinator City of Orono 2750 Kelley Parkway Orono, MN 55356 Direct Dial: 952.249.4627 Fax: 952.249.4616 Planning &Zoning Office 952.249.4620 Email: mcurtisCu�ci.orono.mn.us Website: www.ci.orono.mn.us 2 V I � ORO � NO COPY � City of Orono ' �on%�\ Hardcover Calculation Worksheet i �����FS��o��` Property Address: 1 3 -7 C� /�o��t't A rr't l�� ` f � Prepared by: _ Date: �ro�2 �'����+ee��ti� C� �-�+C I Z- I C�-1 3 � Stormwater Quality Overlay District Tier: (Circle one) Tier 1�Tier 2 ier 3 Tier 4 Tier 5 � .� Step 2: PROPOSED HARDCOVER � a In the following table, identify all items of proposed hardcover on the property, keyed by letter to Certificate of Survey (survey must accompany this form). Include all existing hardcover items that are intended to remain, as well as all proposed hardcover items that wiil be added. Use as many lines as necessary to accurately depict proposed hardcover status of the property. For Tier 1 properties, identify any features by � letter which are split at the 75' setback line and calculate hardcover square footage separately for each portion. Key to Hardcover Item (Describe) Length x Width Total Surve S uare Feet Example Gara e 24'x 30' ` 720 S,F:) A ov E' �a, e Se rve 1 �O S.F. B r ti ez 5 rva. E S.F. C �? wo.. ee Su��e. -7 S.F. � Sr ew IC S�e �ve� 3 S.F. E � � r - �e Sic) e vse See urv S.F. � F S.F. G S.F. � H S.F. I� I S.F. � J S.F. K S.F. L S.F. M S.F. �C N S.F. r. O S.F. P S.F. � Q S.F. r R S.F. �; S S.F. � T S.F. � U S.F. �� V S.F. � W S.F. X S.F. � Y S.F. �! Z S.F. � 1 Total Pro osed Hardcover 3Ss S.F. � � ;Excluda6leNardcover See:Clt CodeSec78-1684 : " � S.F. ' i: S.F. �i S.F. G S.F. �i S.F. �G 2 Total Excludable Nardcover S.F. 3 Net Pro osed Hardcover Subtract line 2 from line 1 '3 SS`� S.F. 4 Totai Lot Area z� "t � 3 S.F. Proposed Hardcover Percentage [(3);(4)� �cl! 3� % Packet Last Updated: 04/1�J/2013 � Page 15 of 23 j 1 � GL��3� �L�t DATE TIME V CITY OF ORONO cnLLED IN o7-� INSPECTION�NOO��E D�3D SCHEDULED a� /O:� PERMIT NO. �i COMPLETED ADDRESS /37� ✓U�� f�rrz � OWNER TELEPHONE NO. �`Z �Z 7�T9 CONTRACTOR �����--� � DESCRIPTION ���'�� , �P� ��7 �� � ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAWGRADiNG/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORENVETLANDS V3 ❑ FRAMING ❑ MECHANICAL FINAL Q ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION' Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT v ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP i ❑ DEMO-FINAL O SEPTIC INSTALL ❑ HARD COVER REMOVAL � ❑ PLUMBING RI � SEPTIC FINAL ❑ UNDATIOWREMOV 2 OWNERICONTRACTOR TO MEEf U:_YES_ � y COMMENTS: o� � j O �. o� O W � Q � 2 � W � , d W RKSATISFACTORY:PROCEED ❑PROJECT COMPLETE � ❑CORRECT W'ORK 3 PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY W 0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE CObERiNG PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑pHOTO TAKEN �NSPECTOR WILL REfURN ❑CITATION ISSUED O STOP ORDER POSTED.CALL INSPECTOR ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249 4600 OwnerlContraator on site: inspector. White Copyflnspector's File C nary CopylSite Notice � ��^ DA�� TIME ✓ CITY OF ORON� n�� c� � INSPECTION N TICE SCHEDULED ���� —,�c. � PERMIT NO. - COMPLETED ADDRESS l�7� n' G��K-/'�G�i� OWNER TELEPHONE NO. - �a-78�9 CONTRACTOR � DESCRIPTION �-�� � D FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FIWNG � ❑ POURED WALL ❑ MECHANICAL RI O LAKESHORFJWETLANDS O O FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z '�INSULATION ❑ WOOD BURNER/FIREPLACE O SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT v ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COV REMOVAL � ❑ PLUMBING RI ❑ SEPTIC FINAL O FOUNbAT10N/REMOVAL 2 ONfNERICOMRACTOR TO MEET YOU:_YES_NO � COMMENTS: �" �Q bU � �►' F , � � rr�:r— � — IC�r„�is — � .o i �•rc AP — 0 � ` �{w� � h, L.•L• /�` ��L t �G'� -� /ild L•!. O f���s.0 � — f��.t1i- C�w��l _n v'r�r�s�e�D �" Q ^ �i►t A'�i�'U�to�.t — S �tls�2 � 2 W ��L "$ CO�e r /n .G� �}- �� — � � � �TISFACTORI!PROCEED O PROJECT COMPLETE W ❑CORRECT WORK&PROCEED O ISSUE CERTIFICATE OF OCCUPANCY � ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE CONERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ pHOTO TAKEN INSPECTOR NfILL REfURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. ne 2a hours in advance. (952) 249-4600 Ow IContractor on s' 'Ta . Inspector: White Copyflnapecto�'s File Canary CopylSite Notke � DAT TIME � �� CITY OF ORONO CALLED IN ( � INSPECTION NOTIC�E SCHEDULED -�� c3 �'D PERMIT NO. ^`� ► ��-(-'� �'> COMPLETED ��- ADDRESS �-1 �c' I�, � `t�,� r �'e'1 _R OWNER TELEPHO NO. �' I�-=�� -��' CONTRACTOR �� �' � �St� ��}i'h�( - ^ , )--i cma�� � ��� k�C_�� G�� f l�f C'j � I r, `.7z. �� ��, � � DESCRIPTION C �` � ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORENVETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL Q ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB O WATER HOOK-UP ❑ PROGRESS � � FINAL / ❑ SEWER HOOK-UP ❑ COMPLAINT � ❑ DEMO-SITE � SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL v � PLUMBING RI 0 SEPTIC FINAL ❑ FOUNDATION/REMOVAL � OWNERICONTRACTOR TO MEEf YOU:_YES_NO v�i COMMENTS: a FC�f��is�. 4>��r ar6G�h. d— /f15�ll o _—��'�h�� — � L � �/'cf►w Tt�G . /�1� ol ��7r[G '�� W � Q � 2 W � W � J � � /�fLYABK.SATISFACTORY:PROCEED ❑ PROJECT COMPIEfE � (��CORRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY 0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE CO'VERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. p pHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. C t inspection 24 hours in advance. (952� 249-4600 Ownerf ntractor on site• ai� Inspector. �r�... � White Copyllnspector's File Canary CopylSite Notice ��Q � DAT TIME � `CITY OF ORONO CALLED I –1 INSPECTION NOTI SCHEDUL�� PERMIT NO —�«�� COMPLETED � ADDRESS �.�7� /�/U/T/�, �'Y��� OWNER TELEPHONE NO. g5Z ��� 9-�-3d CONTRACTOR ��e1���1J7�� �c2%Y'u-�1 � DESCRIPTION ��Q��� � � �FOOTING ❑ PLUMB FINAL ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORFJWETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL � ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL 2 OWNERICONTRACTOR TO MEET YOU:_YES_NO y COMMENTS: a $ �,U�C's - aK � � 0 � � �-S D e� ✓J�`n — 0 � W � (�� � YJ�rr Q � z � lo�e c�au�r p� �e�r�c •-o �..� � r 'h. �' �ras� 6 � �'7C�WORK SATISFACTORY:PROCEED ❑PROJECT COMPLEfE � w /�Z,`DRRECT WORK 8 PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY � ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECdVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. � pHOTOTAKEN INSPECTOR WFLL REfURN ❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Ca11 for the next inspection 2a hours in advance. (g52) 249-46�� OwnerlContractor on site: Inspector. ` � White Copyflnspector's File Canary CopylSite Notice �� � //i��� D T ~� T���� CITY OF ORONO CALLED IN INSPECTION NOTI SCHEDU � — � PERMIT NOv� � 'd��b COMPLETED ADDRESS � ✓� �/V� �� � OWNER TELEPHONE NO.��� ��� g3� CONTRACTOR ��e��� lCG2'�f �d�J77� � DESCRIPTION ���'Q`" ��'P � � ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORENVEfLANDS y ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP p PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT J ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL 2 OWNERICONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: ' �{�D4 �`"Y►'�.1� ^ ,�—U,wT`(,�i� a � �4 l�d�l �r�.�,�y �' D�G j ' w,, � �, �r"u�' O � ' �� � I �o a � db�i�ir� 0�J"��.vl ° '�!l ,c►�,��,� t���.�� W Q .�vi�'1 � Dl-! a daµ,- a W � W � J � �W�ORK SATISFACTORY:PROCEED ❑ PROJECT COMPLEfE W ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY O �CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. p pHOTO TAKEN INSPECTOR WILL RETURN O STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED ❑INSPECTION REQUIRED_CALL TO ARRANGE ACCESS. Cail for the next inspection 24 hours in advance. (952) 249-4600 OwnerlContractor on site- Inspector. .P�_����/''`� White Copyllnspector's File Canary CopylSite Notice i / �D � AT�/ TIME CIn OF ORONO CALLED IN � INSPECTION�1Q �EO 130� SCHEDULED ' ��, PERMR NO. �-U COMPLETED ADDRESS � 3710 �Vory.�f�m ,�r OWNER TELEPHONE�10.�5�3 �7 � � CONTRACTOR �e����� t�� �, DESCRIPTION L�'� "� � � ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FIWNG Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL Q ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � O FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT v O DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP = O DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATIOWREMOVAL 2 01NNERICONTRACTOFi TO MEET YOU:_YES_NO v�i COMMENTS: � y �,,v C • i—�����I 4' � GI� � .. j ` /� � �r/,� P/l 5!�/"r,¢J�� �I✓Dril�� � � ,�` /" .4G✓ ._ � � ���_.�:� 0 � Q f�� �� �e✓ � z � W � � J d W WORKSATISFACTORY:PROCEED ❑PROJECT COMPLETE � ❑CORRECT WORK 8 PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY W 0 �CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE CO'VERING PERMANENT ❑CORRECTUNSAFECONDITIONWRHIN HOURS. ❑pHOTOTAKEN INSPECTOR WILL RETURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑INSPECTION RE(]UIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 OwnerlContractor on site: Inspector: �� 1�� White Copyllnspector's File Cenary CopylSite Notiee D TIME ,1`� CITY OF ORONO CALLED IN ' � INSPECTION NOTICE SCHEDULED - - o�:6 PERMIT NO. '� � COMPLETED ADDRESS �'� r OWNER TELEPHONE NO. Z Z- �� C�NTRACT�A lL�Ic�ST1'7t-Q �Q-m 9���yrLLG � DESCRIPTION ��� �/G"-`7 � � ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FIWNG Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORENVETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL Q ❑ TREE REMOVAL Z ❑ INSULATION 0 WOOD BURNER/FIREPLACE � SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � �[FINAL � SEWER HOOK-UP ❑ COMPLAINT � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL � ❑ PLUMBING RI ❑ SEPTIC FINAL � FOUNDATION/REMOVAL 2 OWNERICONTRACTOR TO MEET YOU:_YES_NO y COMMENTS: �/�=� /Cini 1 • 7- rv - /S/ o� � < 4 � .7aty-� d is.��i- •�'7�7�� , — � - SntoL'es �v o -; � � ��4��5 �Lc`/t�tss. 4�idY� - OC � ' � re —!� W � - N- c� � .�� a Q � � / /! W � �R!G �t/.��E�S C�o vw,p/a7'�c — � j d W� ❑WORKSATISFACTORY:PROCEED O PROJECT COMPLETE � ❑CORRECT YYORK&PROCEED �1SSUE CERTIFICATE OF OCCUPANCY O ❑CORRECT WORK,CALL FOR REtNSPECTION _�TEMPORARY V BEFORECOVERINC, �RMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. p pHOTO TAKEN INSPECTOR WILL RETURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call ext inspection 24 hours in advance. (952) 249-4600 ctor on site• • �� Inspector: ^� White CopyAnapecMPs File Canary CopylSite Notfce PROJECT N0. 15369.0o CERTIFICAT� OF SURVEY 000.o DENOTES EXISTING ELEVATION PREPARED FOR: "9 �' � 48�4� -�46 5 ���0 �OP� (000.o) DENOTES PROPOSED ELEVATION FIELDSTONE FAMILY HOMES �� �� �'� ��'�� \�� --- INDICATES DIRECTION OF � ` x944.9 ��13��%� SURFACE DRAINAGE �953.8 \ �9s2_ 9so �'94B �99 � �970•801 = FINISHED GARAGE FLOOR ELEVATION ` �SUMMIT AVENUE ���\ � ��\ s�� �� � �s�i.�31 - TOP OF FOUNDATION ELEVATION (GARAGE) LOT AREA : 24,743 SQ. FT (PGB�ICLY DEDICATED � � �` �� �x94 .3 (s�2.33� = TOP OF FOUNDATION ELEVATION (HOUSE� t10USE AREA : I ,670 SQ. FT PER PLAT�F-SR�T"NT[[95q � �� ` � � � � ��5) = FIRST FLOOR ELEVATION PORCf1 AREA : 84 SQ. PT x955.7_ _ _ REVISED) � � ` � �\ � (964.33) = BASEMENT FLOOR ELEVATION DRIVEWAY AREA : I ,757 SQ. FT J � �� �/956 � �� \ �.� 1 SIDEWALK AREA : 39 SQ. FT � �� ��. �� 4` � �� \\x944.7 NOTE: DROP GARAGE 1.2 FEET CANTILEVER AREA : 9 SQ. FT � � ��- � - � °��'� �� R � BUYER: ASHFELD � ^ ��D IP Bassw���� ~� ��� ��'��� ,,� \�� \�� � ADDRESS: 1376 NORTH ARM D ----- � � �� � � � �� � \\ � RIVE � �'`� - �p�6�LL'�� � �z�, �. \ `\ QA DENOTES HARDCOVER KEY, SEE ATTACHED STORMWATER QUALITY OVERLAY �.. - - - � �OAK 30° � i1. �j �� �� 945.6 \ SHEET FOR HARDCOVER CALCULATIONS DISTRICT : TIER 2 6O'% x96�B � � � � ip � ALLOWED HARDCOVER ,� /� � � 962 �g62'� g 3'-��MPL 14��-� � �� �� �� \` � Note: PERCENTAGE / `--- - ps s�� N 36^ � �� �1 �\ ��\� � This survey was done with no titie commitment and per client, a / �S '8sr � m '6 '�ash 24" � �� �� encroachment agreement with the city of Orono is in the process 30% OF GROSS LOT AREA �-� a, \ � K 16' \9 �s2 SO \� 945.7 TOTAL PROPOSED EXISTI NG ` � - ���� ���� _� � �� �'�� , S4� � \� ��. HARDCOVER : 3,559 SQ. FT. GARAGE �A i-+ 2¢" ���d' �i,y��ro�T'o �. �`� � �- �'�`9s \ �- � � \ 8 .� �� Git of Orono p 9 MPL 8° �� ��� � b� \ \ � \ � wv Plan mg���9-e�an �ieviaw PROPOSED HARDCOVER �'+ � 6� a �� � � � �� ELM �z�� � � � 948'8 � y � � '� \ � � � � Sit Pian Review Date: PERCENTAGE : 14.37% Z6.5 96 PL I O��-� � .•9 A� s ,�h�1 QO� �8,� . � � 962 \ 14.,�, �� - '���� //x954J � i �p �s� O J �- � -9 � r,a° � � o Building Height : � � I� � 96� g �2 9?� 2�.�� ��c,�o� 9 \ � - - `�� s�.s �PPROVEn x966.6 � o C� I j '�� /� o. Z� � s co Distance from basement floor to ~� (A� � o � 6 � o� highest point of the roof: 36.58' � C�3�'N 68 6�1 � a� //E-vv\``2 �96 \ 6 9 � � � � � a.o � N! D �9 �.. ,� ^/o� (ie � � io. N �o.oio_o �\ PPROVED WITH FEVISIGNS(ses notes) Half the distance between the highest O � oaK i 6° �9 E �� PC��'`1� �° 6 D �' x ` � � � � � f� .�-r� ��P'�t�#: point of the roof to the low point of the � � ^ �- o . �' 2 0`0 �( � ^, ,� corresponding roof: 4.11' � '3s " ���Q ti�5;� 80� ` ,,o° � 9 �° ���6 � D i s t a n c e b e t w e e n t h e b a s e m e n t fl o o r x 9 6 9.8 ���'o o '��� ( � �, 5 ��F�UBLICtY�p CATED L T 1 5 �, o � ? O L / / �,osr,�i " �� � �ER�T Of�S�HILL� ��I'/ I � � S and the highest existing grade \ � °� °h����°o � �, l� I Fpf j P\a l E V I S E�) \ C .q T j ti a djacen t to t he foundation : 6.5' / '' > e.�� -� J � V G x 9 7 3.2 \ P I E 6" P L 2 4 4 �5•�. O � f�L O" x 9 5 . 1 � F� 3 6.5 8-4.1 1-6.5=2 5.9 7' B u i l d i n g H eig h t � -�- / 0 6 j�� �r S'��S�, � ��,.� I � ao�o�N � r� � ` F� �J � I 59� � � � 9, �O � ��I 6" 'AS �6 I I x955.I \ x953.2 � �� � � 96 .7 O� � 973.8 / 2 � g� � � K3 ��� � AK24� �� , J� �� �/ 954-- - 1 � � 9j qK � � � // / I � � � ' MP�26" f � yjs 6 9)Q .o �/ I I I 1 , / � 6�R / \ r��i i� i� � i �� I { 963.fF / �/i � Fi 1 1 1 1 K � )l ` X I � ' � MPL I b✓ ��, v i � °� v \� �M � � � � � 1 � N I � �, , � °jn ^o�/� �P�AIE 6'j�F 19�� • J'� 5C96;9 � � '� ` ��' - - -956-- - � �/ 58.9 � O� SCALE : 1" = 30' � �� 1 � �OINE 4 T� ��'° F',�39.0 � � , � � `- _ _ �� � Q�\�� Legal Descri tion: 1� ��, � '2" � y ' !� �� 9 � � � ` i -958._ ,� _ � 2, �o �,� � ` �PR b" S/P !2"� 96 I � `.. / `C '� !�- � t � 97 R I O"� `970.7 5 ( , I � � ` �9 ��-i �Q\�Q'��, ` �978.I� � I 969�� � �-r � ` ��� ` 6p 58.5�Q-�Q�li�P\ LOTS 15 & 16, BLOCK 8, � � ��".���;+f' � � EXISTING - �• SAGA HILL REVISED, �970� ` \ 0���o``�P / + 1 " � F SIT,g PLAN G ' ING P�� hOUSE HENNEPIN COUNTY, MINNESO T A j � �,, � ��'�o v E D � � �'QJ�'P � ! � � � . �V E D W I T E V I S l O�d S I here by certify to ankers Title that this is a Q CONSULTING ENGINEERS, ��=�. � � - � -��OW 1 true and correct re resentation of a tract as RO(�E P�NNERS and LAND SURVEYORS`•�. � \ 972 � s�� ' shown and describe hereon. As prepared by ENGINEERING me this 27TH da f NOVEMBER, 2013. / � " Y COMPANY, INC. ��'.. \� �-' ��-_ � . �___ . v - DEC 3 1 2013 ��� �"""" Minn. Reg. No. 19086 � 1000 EAST 146th ST.. STE. 240� BURNSVILLE, MN 55337 PH (952)432-3000 ''• � r/ RUSSELL P. DAML PROJECt N0. 15369.0o CERTIFIC�TE OF SURVEY � - - - 000.o DENOTES EXISTING EL PREPARED FOR: � 4 ��_� x �°�`'��` ��6 5 ��`� -- ���� NDICATES DIRECTION 0�ATION FIELDSTONE FAMILY HOMES J � � x944.9 SURFACE DRAINAGE // � � � (s�o.so) = FINISHED GARAGE FLOOR ELEVATION \ `` \ x953.8 \ � s51� ` � '9Sp '�4a\ ss, ` �SUMMIT AVENUE �� \ � �� � � � � � i � -S �i-�3� = TOP OF FOUNDATION ELEVATION (GARAGE) LOT AREA : 24,743 SQ. FT (Pd$�CLY DEDICATED � ��\ \ ��\ �� �x94".3 ���-�� '�� _(��2.33) = TOP OF FOUNDATION ELEVATION (HOUSE) f10U5E AREA : I ,670 SQ. PT PER PLAT�F-SI�GA HTLL9'4 �\ �� � � �G�� �s�4.o5� = FIRST FLOOR ELEVATION PORCt1 AREA : 84 SQ. FT x95s�'- - _ ,` REVISED) � � � �'✓ ( 6�_ = BASEMENT FLOOR ELEVATION DRIVEWAY AREA : I ,757 5Q. FT �� ��956 � � � � � �� ��`\ �\ � � � �\x9�4. NOTE: DROP GARAGE 12 FEET 51DEWALK AREA . 39 SQ. FT _ _ � � � � h� � � 4�� � � BUYER: ASHFELD CANTILEVER AREA : 9 SQ. FT ' �� � R� �° � �� �\ �B�s,,,,p�.! ��� ��8.�� •��,\ ��\ �� � � ADDRESS: 7 376 NORTH ARM DRIVE � 9 p- OA DENOTES HARDCOVER KEY, SEE ATTACHED �. \ STORMWATER QUALITY OVERLAY �o i -\ � 6 .�oA� 30" \���, i� � �� � ��45.6 \ SHEET FOR HARDCOVER CALCULATIONS DIS7RICT : TIER 2 �� �6�' \ �=� � �� �D�P� � � � i r --- -� � .� X- -y-�Q�_isP� i a��-� -, � � \ � Note: ALLOWED HARDCOVER � / 962. ��6� 962.3 �sy�\ N 36° � � �t � ��\\ � This survey was done with no title commitment and per client, a PERCENTAGE � �� �S •8g � � ��;r, �6� �ASti ° � .� �\ encroachment agreement with the city of Orono is in the process o � �-_ �, '�-Q�1� I G\� \ \ �s =p \��45.7 30/o OF GROSS LOT AREA ,. � s 2 TOTAL PROPOSED EXlSTING - ' - �T���v,� i2° _ � ` -o�.r, i � s � � � GARAGE �A Ii 24" � l� @ I� �� \ �`\ �� 4N��� HARDCOVER : 3,559 SQ. FT. �0``�6 ^ ' CiT'o � �`- ` � '�' s � �.' S8 � 1 -� �� � x.�� -966-� � \ `� \ � \ INV �" `` MPL 8" /�� � S'� � P� ','S _ .._. {e E�n.i.e� PROPOSED HARDCOVER �P++ ` � 6� � \ \ G� \ - _� \ \ 9�8 8 �� p Z6.5 I 966.9 � y / �,� 69.� `i&3� �� ,9e \, � PLM I 2" � \\� � x954.7 : � ��'. PERCENTAGE : 14.37/o � � s � 0 2.�sn,4���� • � � � � -�'3 PL I O' / ��i9� �` (9" ��'OQ J� \�1 9 \ � Y.8" `\ � � � O � ►� ` 96�� p���-' 9�7 Q��O �°c o 9 - �, 5�s� o Building Height: X96E.6 - a c� / 3 n o " r s6 1 � � i� o� ' ^� � � /��.``'� �o o�� (i 6� � �o. ; N io.oio-o s.o a � Distance from basement floor to -� � 60.11 ., highest point of the roof:36.58' � " 9`� � a � \ �6� � + ` Half the disiance between the hi hest � � 68 �� �9) E 3 /�P�`�'�j,��°0 6 D � " � � �x956.9 9 O � � oa�: i 6° 3 2 0�� � ��-re �sZ.s ��., � point of the roof to the low point of the T��� r � �•s �^ � � �°o & � o� �ir �y � �s'r�6 ��� � / C(iJ's�` C�J � 3 C��O� `� � �°o `° � corresponding roof:4.11' � x � �, o � ° , 5 ��RUBLICtY_p CATED Distance between the basement tloor ,,I��GG�� �,,li 969.8 j L T 15 �, 4'o°O� 9 O � / � � �r{s"�i ," i �h°' �" �PER�i,(�T Of�S� HILL�C�I'/S I � , �h� T and the highest existing grade r � � `''��°9h'(ie\��% �� �, 1� � � F9��P�'''� iREVISELQ) \ Rq\ adjacent to the foundation :6.5' FL 2a 9 `9�? o Mr� o � x9s . �- ) \ � �1,F��< x573.2 \ � ' � ' �PI E 6" // O 6� � �S(�, � � �- NK � O`�`1 � \ '"Y 36.58-4.11-6.5=25.97' Building Height ao� �l � � �} s9� , I \ �� _� ` � � /� / 9'� �\ ��Q , �r A511,I 6" � I x955.I � x953.2 / �/ ! ��,J � 96 .7 � ��O l ` 973.8 / K 3 ��� J / �� I�A�C 24� �� \� � � � / I � I , 954•,- J � � Gf� � I m 6�8 Ar J � /_ / , I./ ! �I I ' 1 , � � 6�� / // /v,,,� , �MP�26�� � 9) g)9 �0 7/� I / v �♦ � i♦ r♦ � i i� � � �x96�.Q � �G �� � } h< 1 t I I K �` )t ` ., f \ � � / �� ;,�" ' I MPL I b� �� �i i � 01 �i \.�' �M � ��i � , � 1 '` � � �1 � �' °��V o�� � -�P�DIE 6'j� n� 2''c� ��7.9 � � � ` _ "_ -956---' J � 58.9 � 1 � ' /O , � �"g ,�0 1� ,�� �`� 1 , � N � ` � �Q-�O SCALE : 1" = 30' �A 969.0 • � � _ � � \ � / �- / `�+ 1 � � � / ��' Q �� 1 � � � PINE 4" � c� � 6' , '�958.� \ �� !v 12" �" � � � a 1 � \�. -� � Q' � � Legai Description: � � � �PP 8�� SP�'����- r X 9E95 `� � ---� _�� o ��- ,,, � � � � R � �c�"-�- 970.7 � 1 � � `� t"'�96p �O� \V �9�a i i 1 970.9 ) � 9��.zx1 ��� EXISTING Q69�� � ` � � ,� , �� � ` '\\ sas P�"Q��'� LOTS 15 & 16 BLOCK 8 � � I9�o.� / � a ' SAGA HILL REVISED, � � � x �� ,�o � � �\ hoUSE � ��-��o��P� � HENNEPIN COUNTY, MINNESOTA � � �,� �A� � `�QJ�,P � 11 �� \` i hereby certify to ankers Title that this is a Q CONSULTING ENGINEERS, ����� � / true and correct re resentation of a tract as ���E PLANNERS and LAND SURVEYORS`• ' 1 972.7 �' 9�6`� , shown and describe hereon. As prepared by � x > � me this 27TH day f NOVEMBER, 2013. / ENGINEEt�iNG ��. � �_� � - CoM�r�NY, INc. `• ' ' P �..� � Minn. Reg. No. 19086 � 1000 EAST 146th ST., STE. 240. BURNSNLLE, MN 55337 PH (952)432-3000 �' � - RUSSELL P. DAML PROJECT N0. 15369.0o CERTIFICATE OF SURVEY ,� '/ , � 1� '�46.s �'/'1�-�N� 000.o DENOTES EXISTING ELEVATION PREPARED FOR: "9 d - �� (000.o) DENOTES PROPOSED ELEVATION Q � � I�� x 4a.�\� �� FIELDSTONE FAMILY HOMES � �� �� �- -�--- INDICATES DIRECTION oF � � � x944.9 SURFACE DRAINAGE `953.8 \ - 9s2_ 9so ��9Q8 �; � (s�o.so) = FINISHED GARAGE FLOOR ELEVATION � �SUMMIT AVENUE � � �\ � ��� 6�� �� � �9��.131 = TOP OF FOUNDATION ELEVATION (GA ' ' ) LOT AREA : 24,743 SQ. F� (PGB�CLY DEDICATED � � ,/ � �� �x94 .3 .5972.33) = TOP OF FOUNDATION ELEVATION (HOU t10USE AREA : I ,670 SQ. FT PER PLAT�F�SA�A HTCL95=� � \ � �/ \ � \� \ \ ��L = FIRST FLOOR ELE�/ATION � PORCi1 AP.EA : 84 SQ. FT X9ss.�_ - - _ REVISED) �� � 1 � � _f. s� 4.33� = BASEMENT FLOOR ELEVATION O DRIVEWAY AREA : I ,757 SQ. FT � � � _ ��sb � � � � � \ SIDEWALK AREA : 39 SQ. FT _ _ ` �` �� qh� � ,. , ��\ a\ �� \\x944 7 \ NOTE: DROP GARAGE 1.2 FEET � CANTILEVER AREA : 9 SQ. FT � � � _ � � BUYER: ASHFELD . \ � � � \ \ � � ��o iP B�5'"p�'i �� � �1`�� �7`5�,� �� � �' ADDRESS: 1376 NORTH ARM DRIVE �---- \ �- � � � , � � � � � g��� �� J�� �z�,�� � \ \ DA DENOTES HARDCOVER KEY, SEE ATTACHED STORMWATER QUALITY OVERLAY � OAK 30 � DISTRICT : TIER 2 �i � _ �96�8 � �,G � �� �� � �) iP� \��45.6 SHEET FOR HARDCOVER CALCULATIONS ALLOWED HARDCOVER , / � 962 ' _ �962� 962 3- �Q�_MP\-Q} � 6-� \�( ��� �� �\��� � Note: PERCENTAGE / ' - OS�`�bs � � / �� l �\ �\\ � This survey was done with no title commitment and per client, a . 30°/o OF GROSS LOT AREA / �s �8sr � � �QAK I 6�� �ASt1 24° � .� �\ encroachment agreement with the city of Orono is in the process n,_�`� -� ��- ��., � a `��AK 16' \s `�S2 `SO \�x945.7 TOTAL PROPOSED EXISTING _ - ��✓GWD 12�� /j -� � � '�'�� , S4� � `� �� HARDCOVER : 3,559 SQ. FT. GARP,GE .�A �i ?=_° ����� r�,�o,�oG��o � � \ �'���9 � � _�� �� \ 1- 966- 8 � �� �PT �MPL 8° i � �9�`S'� � �,`•' 9 \ \ � \ � iNv �� PROPOSED HARDCOVER 6� O �� � �' � ' - � � 948.8 � � � � � � ELM I 2" �� \ \ PERCENTAGE : 14.37/0 96�.9 'S' °� `�-� `�8 � � 9 � - _ x954.7 0 Z6.5 PL I O„� / �\,9� q� �� 9s8 ^�y QO� � � \ 62�A� I 4"/I " �` \ � l/ _ � � � 96�� SlQ,2 9,J e��OJ ?oU O' ,9`9 � � � \ Y.8" \ � t�` � Buiiding Height : .�,, '- - �, s�.s a Distance from basement floor to x966.6 - "� _ �N � 60.11 � � �9 A� ���� ,�o°Qo��� ��J 966� � I � ip N io oo�o_o a.o�� � � highest point of the roof: 36.58' 6 8 " a� /,�v � .9 � 964.7 " � \ Half the distance between the highest O � � oA�; I 6� �9) E ^ PC��'�L G°O c D �� � `�, " ` � � � �x956.9 poinf of the roof to the low point of the ' � �� � � ��s � t� �3s ^� Q-�e� �°0 80; �� oo°�° � ����' � -- � �6 � ��� I corresponding roof: 4.11' � � ��� `��� '` � �� �" �,� � s����gLICtY,p�D1�TED Distance between fhe basement floor x969.8 L�T 15 ?, O� °0 0,^ L / / /,a,,r,l i " �,h �� �ER�+�qT O�SAGP, H!��� F�I'� and ihe highest existing grade o, o�,y� ?o, ' �C � ( f -� I � �a,' � � G ST� I � � � ��9��e`,��° �� � Fo�P � REVISE4) \ .q iL adjacent to the foundation : 6.5� PL 24 7 `;9�� o Mr� o�� � A f\ � ' Xg5 1 1 R �'c�� G 3 6.5 8-4.1 1-6.5=2 5.97' Building He ight "973 2 � �PI JE 6° � 0 6� �, �s� �� I o� � -\ � �� \ \\ / / �1 � �'J"OD I/ ASF1�16" � � I A�� �\�J I I 1 59/5 � � 96 .7 ,�0� � 973.8 / 9,K 3 � I / PSr I 6" AK 24� I x955.I \\ x953.2// I�/ � � \ � � / � ?8 �� / /�� / '� I i 1 \954• 1� J / / sO / / o AY� � / � ' �M P j 2 G" � 9)6 9>4 0 ' � � I 1 � � 'Q \ r� i / i. .� i i .- i� � � � 963.¢ / /2 � fi I� 1 11 K a )( ` I x 1 I I � 1 I MPL Ib✓ n� �� � �� � .� \� �M � / � 1 � I � � � \, 1 `J °� � � -�'-P�DJE 6" � C_ �+� 5C967.9 � � � � ` - - -956- - - � „ _ , � �° / � � Fo ,�g`, ,�3 -�1 , I � �� /� 58.9 � o, r / SCALE . 1 - 30 � � / �-� /�� ' % �,�969.0 • � � - , � �,�' � \ \ / PiNE y�+" ,� �� , `� � I 958' � / ��� �\ / Legal Description: � / 1z�� � , � � J i � �� +SPR 8" SP. I 2"-�' � x 969 S a' � I ` I � - � / O�'P �-' x�978.III ,' N1 970.9 )� R(O � I ``970J 969i 1' I� J \ � ` � \ -��60 � � P�O�Q\P���� 58.5 LOTS 15 & 16 BLOCK 8 � � _ � � ' a I970.9 � 9�=+.z"1 �� EX15TING � ` �,Z,�v�P � SAGA HILL REVISED, � � , x i ,, � � � ' t10USE o��� o� � HENNEPIN COUNIY, MINNESOTA j 1 ���� ��A�/ °� � �'QJ P i � / � � � � . \ i nereby certify to ankers l itle that this is a �`� CONSULTING ENGINEERS, ���� � 1 / 1 true and correct re resentation of a tract as / ��(3E PLANNERS and LANO SURVEYORS�`�. ' � 972 � � '9j6� Sf10Wf1 and describe hereon. As Pt"@Pal'@d by - - -- ENGI(VEEf�I1VG . � � X / i� 1 me this 27TH day f NOVEMBER, 2013. / -'" \ � i i � 1�=!� �� ! ' COM('ANY, [NC. � � � �� � ' � - M inn. Reg. No. 19086 1000 EAST 146th SL, STE. 240, BURNSVILI.E, MN 55337 PH (952)432-3000 '� � �-,�� RUSSELL P. DAML / r , , . • . • • • • 1 • , emo To: Finance Department From: Christine Mattson, Planning Assistarrt CC: Street File ��' Date: August 11, 2014 Ca/L: 101-22205 Re: Escrow Refund Building permit#2013-01306 pertaining to 1376 North Arm Drive is complete. Please refund the$10,000 to the applicant, Dan& Erica Ashfeld. The following is attached: • Documentation from Campbell-Knutson stating they have no unbilled WIP • Documerrtation from Bolton-Menk stating they have unbilled WIP in the amount of$52. There is no other WIP for this project, so it falls under the$500 credit. • Original signed escrow agreement • Copy of cash register receipt showing escrow amount received Make check payable to: Dan 8� Erica Ashfeld DO NOT MAIL. APPLICANT WANTS TO PICK UP. w:�.street files\north arm dr11376�escrow refund request for 2013-01306.doac Christine Mattson From: Sherry Charboneau [SCharboneau@ck-law.com] Sent: Tuesday, August 05, 2014 5:04 PM To: Christine Mattson Subject: RE: Unbilled WIP Christine: I still happen to be working tonight. NO UNBILLED WIP for our firm on the apps listed below. Sherry Sherry L. Charboneau Legal Assistant CAMPBELL KNUTSON P.A. 1380 Corporate Center Curve•Suite 317. Eagan,MN 55121 '�(651)234-6230•Fax: (651)452-5550 . �scharboneauCa�ck-law.com•www.ck-law.com From: Christine Mattson fmailto:CMattsonCa�ci.orono.mn.usl Sent:Tuesday, August 05, 2014 4:53 PM To: Sherry Charboneau; David P. Martini Subject: Unbilled WIP Hi. Any unbilled WIP for the following? I would greatly appreciate a response before noon tomorrow,Wednesday,August 6`h. Thank you. Applicant Address Building Permit# Land Use# Reynolds, William & Mollie 665 Orchard Park Rd 2013-00100 Ashfeld, Dan 1376 North Arm Dr 2013-01306 Prchal, Derek 4705 Watertown Rd 2014-00278 14-3649 Maenner, Bradley 3590 Northern Ave 2013-00431 Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway ; Orono ; MN p 55356(physical addressJ PO Box 66 � Crystal Bay f MN { 55323-0066(mailing address) '� 952.249.4620 ; 8 952.249.4616 �cmattson@ci.orono.mn.us � �] www.ci.orono.mn.us Summer Office Hours: (Monday, May 19 through Friday,August 29,2014) 1 Christine Mattson From: David Martini [davidma@bolton-menk.com] Sent: Wednesday, August 06, 2014 3:30 PM To: Christine Mattson Subject: RE: Unbilled WIP It looks like we have the following WIP: $104 for 2013-001 0 52 for 2013-0130 $52 for 2014-00278 $124.50 for 2013-00431 David P. Martini, P.E. Bolton � Menk, Inc. P: (952) 448-8838 ext. 2458 M: (612) 756-4315 email: davidmaCa�bolton-menk.com From:Christine Mattson [mailto:CMattson@ci.orono.mn.us] Sent:Tuesday,August 05,2014 4:53 PM To:'Sherry Charboneau'; David Martini Subject: Unbilled WIP Hi. Any unbilled WIP for the following? I would greatly appreciate a response before noon tomorrow,Wednesday,August 6th. Thank you. Applicant Address Building Permit# Land Use# Reynolds, William&Mollie 665 Orchard Park Rd 2013-00100 Ashfeld, Dan 1376 North Arm Dr 2013-01306 Prchal, Derek 4705 Watertown Rd 2014-00278 14-3649 Maenner, Bradley 3590 Northern Ave 2013-00431 Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway i Orono I MN 1 55356(physica/addressJ PO Box 66 I, Crystal Bay � MN � 55323-0066(mailing addressJ '� 952.249.4620 ( 8 952.249.4616 �cmattson@ci.orono.mn.us j �1 www.ci.orono.mn.us Summer Office Hours: (Monday, May 19 through Friday,August 29,2014) i T�MPORARY CERT[FIGATE OF�CCUPANCY ESCROW AGREEMEN7 Orono Buitding Pe�mit#2013-01305 AGREEMENT made this�day af 1 ( 2D„� by and between the Cl'fY OF 4RON0, a Minnesot�municipai corporation{"City°)andaAf+Aiaaa-�ewer�.('Owners°). Recitafs V���� � `�y�� ����'I� � 1. Gonstruction of the new residence focated at �E37fi North Arm Drive the ("Subject Property"), legally described as Lots 15 8� 'f6, Block 8, Saga Hilf Revised in Orono, Nennepin County Minr�esota, is the subject of buifding permit appficatian number 2Q13- 01306 has been completed, 2. Winter conditions currentEy prpnibit Campletion of exteriQr imprvvements, finaE gfading, and vegetation establishment. An as-built survey cannot be accurately conducted at this time. 3. Owners requsst the City issue a Eemporary certifica;e of accupancy ("TCO") to the Owners so that the Owners may occupy the new res+dance. 4. The City wi11 issue a TCO only if the Qwners establish an escraw to ensure completion of exterior improvemenfs, confinu�tian of erosion contral and submittal of an as-built sur✓ey to the City. NOW THEREFORE,TH� PAR7IES AGREE AS F�LLOWS; 1. DEPOSIT O� ESCROW �UNDS. Contemporanea�sly with the executi�n of fhis Escrow Agreement, the Owners shall depasif $10,aQ0 with the City. A!I accrued interest, if any, shall be paid to tne City to reimburse tfie Gity for its cost in administering the escrow account. 2. PURPOSE UF E3CR�W. The purpose of the sscrow is to assure ;ompletion of any ex#erior improvemenfs, Pinal grading, establishmeni of vegetation as weli as guarantee reimbursement to the City far al1 out-of-pocket costs the City has incurred (including planning, engineering, in axcess of $500, or legal consulfartt revietiv) or wiil incur in reviewing the plan. Eligible expenses shall be consistent with expenses the Owners wou!d be responsiele for under a buildirg permit appiication. The escrow wifl aisa guarantee reimbursement to the City for all out-af-packet cos:s the City has incurred to assure that the work is compiated in accordance with the Stormwater Pollution Prev�ntian Plan and the pro�isions of Or�no City Code Chapter 79. The financiaE security ma� also be used by t�e Ci:y ta etiminate any hazardous conditions associated with the wa;lc and io repair any dar-�age to pu�lic pro�erty ar infrastructure that is caused by Ehe work (including planning, engineering, or legai consultant review) associated with buifding permit #2013-01306 if compiianc� with the apqroved building perrnit is not accomplis;�ed. 3. MONTHLY BILLING. As the City receives consuftan#bills for incurred costs, the City wil[ in turn send a biil to Fhe Gwners. Owners shail be respo�sible fo�payment to ihe City wifhin 30 days ofi the C3wners'recefpt of bill. a. DISBURSEMEPET FROM �SCROW ACCoUNT. ln fhe evenf that the Owners do nat make payment to the City within the timeframe outlined ir #3 above, shall issue a 51�p Work Order until the O�vners pay all expenses iRvoiced pursuant to#3. The City may draw from the escrow accouni withoui furthet approval of;he Gwners to reimburse the City for eligible expenses the Ci#y has incurred. 5. ClOSING E5CROW. 7he Balance on daposit in the escrow, i€any, shall be retumed ta the Owners when the review has been completed and written nofification is received f�om the Owners requesting the funcis. 15544t 6. GERTIFY UNPAID CFIARGES. lf the project is abandoned by Owner�, or if the eligib�e expenses iRcurred by the City exceed the amount in escrow, the City shall have the right to certify ihe unpaid balance to#he subject property pursuant to Minn. Sfat. §§Q15.01 and 366.092. 7. ACCESS TO SE1B.7£CT PROPERTY. The Owners hereby grant to the City, its agents, employees, officers and contracfars, the right to enter upon the subject praperty for the specific �urpose of inspecfin� and compfeting any sxterior improvements, final grading, establishrnent of vegetation and the restoration of the subject property should the Owners Rat complete the work by tha specified dates. CITY: CITY Of ORONO OWN $: � ` �� l��F� By: Its. fntsrnal Use Only:. : D Originat ta FinanCe�ep.a�ent G:Capy to Strest Fife 155441 ' (.,yi� ti �{'��'le � � . . . . . . � { - �7C�f �d�w�.� �.�[����l�vb4C:� � �, ' �ti'L+lM1 �'�+� �G7�j�'e �'.J� 'i.'�k:�_��'i.��j � ��5�.'..�ti��L.�IV� aAaL+k:YIYY� fS�� 1��5.{.\��N . I I r-1�p�sa�0��� �-.:d3?y i-tFaii�� , r°Y�\'l�:i�1b l3i1;i9E1�`s': •".i'' �� � ;�f^tN 1�a � � � � � T�!t� r:��;. ��Ct`fiW 4a?'rs � ' ;4;�t��.�.K� t' ,� ��t„��}jY, � � it'3 ?:��;,�+ � • ; D�.f_�rre� r?�ir..U�v��c�c,ef~ ::'����it ��._ �' � J, i. � i ��t�1.��'> � ' � IV4.Gt..s . . Gt�:?C�. � r��., (`�P �•►,�ek N+�. �a��� , ,�.. ����,r: � ri�l�4tar�c F�rf+a�y ;�cn��� Icir.. �`,cF�f9�d: t,`?�wj;i.t;C' � �a�:g� +�er�+�ex r:d n a _.,.�. �._}_ t�`s.;.7'�'(s14 1`� ���i � CITY OF ORONO * Z 0 1 4 — 0 fd 3 2 B * 2750 KELLEY PARKWAY DATE ISSUED: 04/17/2014 ORONO,MN 55356- (952) 249-4600 FAX: (952 249-4616 ADDRESS : 1376 NORTH ARM DR PIN : 07-117-23-41-0052 LEGAL DESC : SAGA HILL REVISED : LOT 000 BLOCK 008 PERMIT TYPE : ESCROW FEE-TIED TO BUILDING PERMIT PROPERTY TYPE : RESIDENTIAL CONSTRUCTION TYPE : ESCROW FEE-TIED TO BUILDING PERMIT NOTE: THIS$7500 IS FOR TEMPORARY CERITIFICATE OF OCCUPANCY APPLICANT ESCROW FEE-BUILDING 7,500.00 ESCROW FEE-EROSION CONTROL 0.00 FIELDSTONE FAMILY HOMES ESCROW FEE-GRADING 0.00 801 CLIFF RD E BURNSVILLE,MN 55337- TOTAL 7,500.00 (952)469-8800 Payment(s) Minnesota State License#: BUIL-BC631164 CHECK 12446 7,500.00 OWNER BOWEN, WILLIAM 1376 NORTH ARM DR MOUND, MN 55364- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances goveming this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of]80 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the State Building Code.This permit may be revoked at any time for due cause. / / Applicant Permitee Signature Date Issued By Signature Date BUILDING PERMIT ESCROW AGREEMENT Orono Building Permit#2013-01306 AGREEMENT made this �� day of '�i�1 20� , by and between the CITY OF ORONO, a Minnesota municipal corporation ("City") 11.o, 'd.L.�,r,3.Er�c sti�' ("Owners"). Recitals 1. A building permit application has been filed for a new single family home located at 1376 North Arm Drive, the ("Subject Property"), legally described as Lots 15 & 16, Block 8, Saga Hill Revised, Hennepin County Minnesota. 2. Owners request the City to review this application. 3. The City will commence its review of the application and incur costs associated with said review only if the Owner establishes an escrow to ensure reimbursement to the City of its costs. NOW THEREFORE,THE PARTIES AGREE AS FOLLOWS: 1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow Agreement, the Owners shall deposit$2,500 with the City. All accrued interest, if any, shall be paid to the City to reimburse the City for its cost in administering the escrow account. 2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City for all out-of-pocket costs the City has incurred (including planning, engineering, in excess of $500, or legal consultant review) or will incur in reviewing the plan. Eligible expenses shall be consistent with expenses the Owners would be responsible for under a building permit application. The escrow will also guarantee reimbursement to the City for all out-of-pocket costs the City has incurred to assure that the work is completed in accordance with the Stormwater Pollution Prevention Plan and the provisions of Orono City Code Chapter 79. The financial security may also be used by the City to eliminate any hazardous conditions associated with the work and to repair any damage to public property or infrastructure that is caused by the work (including planning, engineering, or legal consultant review) associated with building permit #2013-01306 if compliance with the approved building permit is not accomplished. 3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will in turn send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners' receipt of bill. 4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make payment to the City within the timeframe outlined in#3 above, shall issue a Stop Woric Order until the Owners pay all expenses invoiced pursuant to #3. The City may draw from the escrow account without further approval of the Owners to reimburse the City for eligible expenses the City has incurred. 5. CLOSING ESCROW. The Balance on deposit in the escrow, if any, shall be returned to the Owners when the review has been completed and written notification is received from the Owners requesting the funds. 6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible expenses incurred by the City exceed the amou in escrow, the City shall have the right to certify the unpaid balance to the subject property pursuant to Minn. St t.§§415.01 and 366.012. CITY: CITY OF O NO OWNER: By: � . .. . _ _. , ., Its: -r'L (�J����G��� "` Cit of �r�or�, �75� i{e21�y Parkway g�_�49-4604 Orono MN 5.5356 Receiat 1+�: 3.4SU291 3an 13, 2qi4 Fieldstone Fa�ily Homes Previous Balance: •� Permita �013-01346 137b Mart�r Rrm 1,445.75 Dr 1G1-3�51�1 Building Permits - perr�its P013-01306 137E North Rrm �•� Dr 1U1-2084� Dae to govts-5tate +_r Total: �+�`�'� Plannin�g and_Zoning 2p14-00036 lslb North Rrn 2,�.� Dr 101-22205 Deferred Rev-Developer Deposit ! Tc,tal: 2,540.44 Che�k 4 429.2� Check 1+�: 5505 � Payor: fieldstone Fa�aily No�es 4 �.� Total Applied: + Change Tendered: •� —______= 01/131�014 a1:0�CF�i