HomeMy WebLinkAboutRe: rotting deck DATE TIME
CITY OF ORONO CALLED IN � =-5�
INSPECTION NOTICE SCHEDULED a
PERMIT NO. COMPLETED U�
ADDRESS
OWNER CONTR.
TELEPHONE NO.
� DESCRIPTION
� 01 FOOTING 11 MECHANICAL RI i6 WE�LTEST PUMP
Q 02 FRAMING 11 MECHANICAL FINAL 18 EXCAVIGRADINGIFILLING
� 03 INSULATION 24125 WOOD BURNER/FIREPLACE 19 LAKESHORE/WETLANDS
�
Z 04 WALL BD. 12 WATER HOOK-UP 34 TREE REMOVAL
Q 05 FINAL 13 METER SET(TURN ON �TE INSPECTION
� 07 DEMO—SITE 14 SEWER HOOK-UP PROGRESS
� 07 DEMO—FINAL 27 SEPTIC MAINT. 21 COMPLAINT
= 09 PLUMBING RI 15 SEPTIC INSTALL. 22 FOLLOW-UP
J 10 PLUMBING FINAL 23 SEPTIC FINAL
� OWNERICONTRACTOR TO EEf YOU:_YES_NO �
� COMMENTS: T � i
�
W
a
J C!`'
0
a
� — 5 S (
o .
� �
W
�
Q
�
2 c
� G 1�CP S��9.T
W
�
j
d
W ❑WORKSATISFACTORY:PROCEED ❑ PROJECTCOMPLETE
� ❑CORRECT WORK 8 PROCEED C ISSUE CERTIFICATE OF OCCUPANCY
W
� ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
� BEFORECOVERING PERMANENT
❑CORRECTUNSAFECONDITIONWITHIN HOURS. � PHOTOTAKEN
INSPECTOR WILL RETURN
❑STOP OROER POSTED.CALL INSPECTOR n CITATION ISSUED
❑ INSPECTION RE�UIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance.473-73�J7
OwnerlContr�r p�site:
inspector. �U
White Copyllnspec r's File Canary CopylSite Notice
A _
//��O ��
� �
� ��, 0
�'��t:��, � C ITY of ORONO
� (���� ,'�(� cS� Nt�,,,����i ore��
� E ° 1 d';� �, Post Otlice Box 66
,
� Crystal Bay,Minnesota 55323-OOG6
'��,91��+,�7��'�?t�� 1��G
kE3H04
May 5, 1992
Mr. Rod Wallace
5135 Weeks Road
Excelsior, Minnesota 55331
Dear Mr. Wallace:
The deck at the rear of 941 North Arm is rotted beyond repair.
Unfortunately this deck was built wi in the setback area of the lot
and will require a variance to replace.
941 North Arm has frontage on two parallel streets, thus it is defined
as a through lot. Structures on through lots must meet the front yard
setback ( 35 ' ) to both streets.
To replace this deck will require the following:
l. Must be built 35 ' back from street lot line.
2 . As built survey of house and lot.
3 . Building permit.
or
1. Variance to street setback.
2. As built survey.
3 . Building permit.
The deadline date for completed variance applications is May 22nd for
June 15th Planning Commission meeting.
TELLPI IONG-473-7357• FAX-473-0510
,
� - .
Mr. Wallace �
May 5, 1992
Page 2
If you have any further questions, please call.
Since el ,
�
Bruce Vang
Field Inspe tor
BV/ch
Enc. Variance Application
Permit Application
Survey
cc: Lyle Oman, Building Official
Jeanne A. Mabusth, Building & Zoning Administrator�/