HomeMy WebLinkAboutRe: as-built Christine Mattson From: Adam Edwards Sent: Tuesday,July 25, 2017 10:23 AM To: Christine Mattson Subject: RE: 135 Luce Line Ridge/#2016-01465 Chris, The as built appears to generally conform with the approved plan with the following exceptions: 1. Gravel has been placed to the east of the new garage. 2. A retaining wall has been built to the west of the new garage. Spot elevations indicate that it is below the 4 ft threshold. 3. A boulder flume has been built to the northeast of the garage. An inspector should conduct a site visit and confirm the following: 1.The survey accurately depicts conditions on the ground. 2.The site is stabilized to the point the any remaining erosion control can be removed. 3.The retaining wall to the west of the garage does not exceed 4ft in height. Adam From:Christine Mattson Sent: Monday,July 24, 2017 8:11 AM To:Adam Edwards<aedwards@ci.orono.mn.us> Subject: RE: 135 Luce Line Ridge/#2016-01465 Adam, We received an as-built survey for 135 Luce Line Ridge. Please review and provide comments. Thank you! From:Adam Edwards Sent:Tuesday, December 20, 201611:08 AM To:Christine Mattson<CMattson@ci.orono.mn.us> Subject: RE: 135 Luce Line Ridge/#2016-01465 Stamped grading plan approved From:Christine Mattson Sent:Tuesday, December 20, 2016 10:17 AM To:Adam Edwards<aedwards@ci.orono.mn.us> Subject: FW: 135 Luce Line Ridge/#2016-01465 Adam, 1 Below is updated information. The file is in your inbox. Thank you! From: Mike Johnsrud [mailto:mhiohnsrud@comcast.netl Sent: Monday, December 19, 2016 5:55 PM To:Christine Mattson<CMattson@ci.orono.mn.us>; brian@bvconstructiomm�.com Cc: Irci@earthlink.net; Roger Peitso<rpeitso@ci.orono.mn.us> Subject: RE: 135 Luce Line Ridge/#2016-01465 Christine, Our survey is complete and I will be bringing it in tomorrow morning. Also, as we discussed on the phone, here are the answers to the other items you addressed in your letter dated 12/8/2016. 1. Certificate of Survey. I will bring in the revised survey tomorrow a. a.i - Contours - Complete b. a.ii — General information. We will not be disturbing the area where this building is going. The building is framed"pole type"but the building will look like it was stick framed. There will not be typical foundation disturbances because this is not a typical excavated foundation. The area where this building is going is relatively flat as outlined by the contours. i. Erosion control —The ground is frozen and snow covered and there won't be erosion because there is not a typical excavation. ii. Construction access —the access will be our driveway (approx. 150�. If you referring to tire/wheel debris possibly getting into the street, again, this will not be a typical excavation and no material will need to be hauled away. iii. Stockpile location — I assume you mean for excavation. We will be boring holes (not the typical excavated foundation). If you would like, I can place erosion control logs around the perimeter of the area. No material will need to be stockpiled for hauling away. c. a.iii — Grading plan —Again, the area where this building is going is relatively flat. Grading is not necessary for placement of this building. I asked the surveyor about this item specifically and he did not place any erosion control because there isn't any excavating necessary for this project. However; as I stated earlier, I could place erosion control logs around the perimeter of the area if you would like. 2. Landscape plan a. There will not be any changes to the landscape with this project. We plan on having grass and mulch around this building that mirrors the rest of our yard. 3. Oversized Accessory Structure Covenant a. Michael Harold Johnsrud — Husband b. Suzanne Denise Johnsrud —Wife I will come into the office tomorrow morning. I will ask for you to verify that the answers above are sufFcient to your concerns. Thanks, Mike]ohnsrud From: Christine Mattson [mailto:CMattson@ci.orono.mn.usl Sent: Thursday, December 08, 2016 10:41 AM 2 � - To: 'brian@bvconstructiomm�.com' Cc: 'mhjohnsrud@comcast.net'; 'Ircj@earthlink.net'; Roger Peitso Subject: 135 Luce Line Ridge/ #2016-01465 Brian, Attached is a copy of the letter and enclosures being mailed today. Please don't hesitate to contact me if you have any questions. Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway � Orono I MN � 55356(physical addressJ PO Box 66 � Crystal Bay � MN � 55323-0066(mailing addressJ '� 952.249.4620 I B 952.249.4616 � cmattson@ci.orono.mn.us � �] www.ci.orono.mn.us Office Hours: Monday- Friday 8 am to 4:30 pm OUR OFFICE WILL BE CLOSED: Friday, December 23,2016 Monday, December 26,2016 Monday,January 2,2017 Monday,January 16,2017 3