From: Adam Edwards
Sent: Tuesday,July 25, 2017 10:23 AM
To: Christine Mattson
Subject: RE: 135 Luce Line Ridge/#2016-01465
Chris,
The as built appears to generally conform with the approved plan with the following exceptions:
1. Gravel has been placed to the east of the new garage.
2. A retaining wall has been built to the west of the new garage. Spot elevations indicate that it is below the 4
ft threshold.
3. A boulder flume has been built to the northeast of the garage.
An inspector should conduct a site visit and confirm the following:
1.The survey accurately depicts conditions on the ground.
2.The site is stabilized to the point the any remaining erosion control can be removed.
3.The retaining wall to the west of the garage does not exceed 4ft in height.
Adam
From:Christine Mattson
Sent: Monday,July 24, 2017 8:11 AM
To:Adam Edwards<aedwards@ci.orono.mn.us>
Subject: RE: 135 Luce Line Ridge/#2016-01465
Adam,
We received an as-built survey for 135 Luce Line Ridge. Please review and provide comments.
Thank you!
From:Adam Edwards
Sent:Tuesday, December 20, 201611:08 AM
To:Christine Mattson<CMattson@ci.orono.mn.us>
Subject: RE: 135 Luce Line Ridge/#2016-01465
Stamped grading plan approved
From:Christine Mattson
Sent:Tuesday, December 20, 2016 10:17 AM
To:Adam Edwards<aedwards@ci.orono.mn.us>
Subject: FW: 135 Luce Line Ridge/#2016-01465
Adam,
1
Below is updated information. The file is in your inbox. Thank you!
From: Mike Johnsrud [mailto:mhiohnsrud@comcast.netl
Sent: Monday, December 19, 2016 5:55 PM
To:Christine Mattson<CMattson@ci.orono.mn.us>; brian@bvconstructiomm�.com
Cc: Irci@earthlink.net; Roger Peitso<rpeitso@ci.orono.mn.us>
Subject: RE: 135 Luce Line Ridge/#2016-01465
Christine,
Our survey is complete and I will be bringing it in tomorrow morning. Also, as we discussed on the phone,
here are the answers to the other items you addressed in your letter dated 12/8/2016.
1. Certificate of Survey. I will bring in the revised survey tomorrow
a. a.i - Contours - Complete
b. a.ii — General information. We will not be disturbing the area where this building is
going. The building is framed"pole type"but the building will look like it was stick
framed. There will not be typical foundation disturbances because this is not a typical
excavated foundation. The area where this building is going is relatively flat as outlined by
the contours.
i. Erosion control —The ground is frozen and snow covered and there won't be erosion
because there is not a typical excavation.
ii. Construction access —the access will be our driveway (approx. 150�. If you
referring to tire/wheel debris possibly getting into the street, again, this will not be a
typical excavation and no material will need to be hauled away.
iii. Stockpile location — I assume you mean for excavation. We will be boring holes (not
the typical excavated foundation). If you would like, I can place erosion control logs
around the perimeter of the area. No material will need to be stockpiled for hauling
away.
c. a.iii — Grading plan —Again, the area where this building is going is relatively flat. Grading
is not necessary for placement of this building. I asked the surveyor about this item
specifically and he did not place any erosion control because there isn't any excavating
necessary for this project. However; as I stated earlier, I could place erosion control logs
around the perimeter of the area if you would like.
2. Landscape plan
a. There will not be any changes to the landscape with this project. We plan on having grass
and mulch around this building that mirrors the rest of our yard.
3. Oversized Accessory Structure Covenant
a. Michael Harold Johnsrud — Husband
b. Suzanne Denise Johnsrud —Wife
I will come into the office tomorrow morning. I will ask for you to verify that the answers above are sufFcient
to your concerns.
Thanks,
Mike]ohnsrud
From: Christine Mattson [mailto:CMattson@ci.orono.mn.usl
Sent: Thursday, December 08, 2016 10:41 AM
2
� -
To: 'brian@bvconstructiomm�.com'
Cc: 'mhjohnsrud@comcast.net'; 'Ircj@earthlink.net'; Roger Peitso
Subject: 135 Luce Line Ridge/ #2016-01465
Brian,
Attached is a copy of the letter and enclosures being mailed today. Please don't hesitate to contact me if you have any
questions.
Christine Mattson
Planning Assistant
City of Orono
2750 Kelley Parkway � Orono I MN � 55356(physical addressJ
PO Box 66 � Crystal Bay � MN � 55323-0066(mailing addressJ
'� 952.249.4620 I B 952.249.4616
� cmattson@ci.orono.mn.us � �] www.ci.orono.mn.us
Office Hours: Monday- Friday 8 am to 4:30 pm