My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: retaining walls
Orono
>
Property Files
>
Street Address
>
H
>
Hunter Drive
>
1070 Hunter Drive - 25-118-23-42-0008 (Formeraly 300 Sixth Ave N)
>
Correspondence
>
Re: retaining walls
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:15:17 PM
Creation date
8/16/2017 8:56:10 AM
Metadata
Fields
Template:
x Address Old
House Number
1070
Street Name
Hunter
Street Type
Drive
Address
1070 Hunter Drive
Document Type
Correspondence
PIN
2511823420008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�- �v�d �'4,��� �,r-� <br /> ` � ::,.u.:t:�.. v-:_i::�.+.g.�:.�3�=_a <br /> _- 4�'� _ , r �g IVIL ESIGN <br /> � �� PRQFESSiONALS <br /> i,._ .. . i..3.�..� <br /> i.:air..anir,t�_.�...._.._:»:�n <br /> INNOVATIVE ENGINEERING SOLUTIONS <br /> May 31, 2016 <br /> Rick Moeller • <br /> Heins Nursery <br /> RE: Divine Suroey Retaining Walls(16-d462) <br /> MooneyLake,Minnesota ��%vr�►1y <br /> � Design Assumptionss <br /> . Boulder:24"Deep Unirs <br /> Wall.Batterc 15.0° Design: Coulomb <br /> Live Loa� 50 PSF Dead Load: 0 PSF <br /> Toe Slope: Noize Back Slope: 3H:1V <br /> Seismic: N/A Applied Bearings 2,600 PSF <br /> Soil Design Properties: � y c <br /> Rerained Soil 26° 120 PCF 0 PSF (Sandy I.ean Clay) <br /> Foundarion Soil 26° 120 PCF 0 PSF {Sandy Lean Clay} <br /> Notes: <br /> No soils information was provided for this final design.The onsite material is assumed to be a Sandy Lean <br /> Clay with an intemal friction angle of 26°. Where unsuitable soils are found, a sul�cut may Ue required and <br /> structural fill shall Ue placed and compacted to provide an adequate bearing foundation. The proposed wall <br /> shall be Uackfilled with a Sandy Lean Clay material up at a 1H:1V off the back of the bottom block. The <br /> above minimum soil suength parameters shall be verified prior to constniction.CDP shall be contaeted if the <br /> above soil strength parameters cannot l.�e met and a redesig�i may l�e required. <br /> A global stability analysis has been performed using the soil design parameters as listeci al�ove. The project <br /> geotechnical engineer shall confirm global stabiiity based on the �roposed wall design and the actual <br /> parameters of the onsite soils. <br /> Walt Iayouts and elevarions obtained kom plans prepared by Gronberg&Ass�iates, Inc. dated 11/19/15. <br /> All Building runoff shall be directed away from the back of walls <br /> During wall construction, e�ccavation shall remain within the construction limits shown oi1 the plai�s. Ail <br /> available means and methods used to keep excavation within the construction limits shail l�e incidental. The <br /> contractor shall coordinate relocation of all exisring conduits and services with the utility provider. <br /> We appreciate the opportunity of providing services to you. If you have any questions or comments regardiug <br /> this project,please feel free to contact us. <br /> Sincerely; <br /> jonathan J.-Van Zee <br /> f ndl�l►�ion PrnfPccinn�ic . Ah(l�f I.mrlolr Avn S SnirP�fl(1 R1Mminomn MA1 554�(1 • f��P(o5ilzn�.S�t� . ..�,.�,..,�,1...���,.,,,, <br />
The URL can be used to link to this page
Your browser does not support the video tag.