Loading...
HomeMy WebLinkAboutSoil observation notes „._�;::��,�.,}�,,.5 �-�-_� �._� - . .,.:_a..�� � �� � � ”' Daily Soil Observation Notes Project No: : Date: Report No: Project Name: Project Location: Client: Temp/We�ther: Project Manager: Time Arrived: Departed: i Areas Observed: ❑ Building Pad ❑House Pad ❑Roadway ❑Parking/Walks ❑ Footing �' ❑Proof Roll ❑Other(describe): Soil report available? ❑ Yes QNo Report reviewed? ❑Yes ❑No Report prepared by: Finish floor evaluation: eottom of footing elevation: Bottom of excavation elevation: Approved plans available? ❑Yes ❑No Specified compaction: Fill source: Oversizing appears adequate? ❑NA Q Yes ❑No Soils observed agree with Soils report? ❑Yes ❑No Soils appear adequate for design loads? C3Yes ❑No ProF�osed project bearing capacity(psf): Contractor notified of results? (]Yes ❑No Nam�e of person notified: Was a copy of this report left on site? _,�]Yes ❑No If so,whom wes it submitted to?� . x.' N ��. ,. _ s. ;� �� �; ��.:�� , , ; , .r . , .. : #,,. � � �, ; �=,. �. �M_ _ � �:, � � _� Notes/Comments: , ,, - '� � Ca "; i r'� .. ;,, , � . � ..F n. .i , .�'t � � �.." .r ', , ', .�/�/ Performed By: Reviewed By: Date: This is a preliminary report and is provided solely as evidence that field observations and/or testing was performed.Observations and/or conclusions and/or recommendation conveyed in the final report may vary from,and shall take precedence over,those indicated in a preliminary report. HAUGo ALO 1/10/14 � Daily Soil Observation Notes Project No: Date: Report No: Project Name: Project Location: Client: Temp/Weather: Project Manager: Time Arrived: Departed: ,,. i � « -� , . Areas Observed: ❑ Building Pad ❑House Pad ❑Roadway ❑Parking/Walks ❑ Footing ❑Proof Roll ❑Other(describe): Soil report available? ❑ Yes ❑No Report reviewed? ❑Yes ❑No Report prepared by: Finish floor evaluation: Bottom of footing elevation: Bottom of excavation elevation: Approved plans available? ❑Yes ❑No Specified compaction: Fill source: Oversizing appears adequate? NA ❑Yes ❑No Soils observed agree with Soils report? ❑Yes ❑No Soils appear adequate for design loads? ❑Yes ❑No Proposed project bearing capacity(psf): Contractor notified of results? []Yes ❑No Name of person notified: Was a copy of this report left on site? ❑Yes ❑No If so,whom was it submitted to? �`� r�_..�- s � ', 1 �� �� ���_,� K� � N � '� -��=> ��;- � `� �� � � `� ;����� . , , � � \ .�_ � � '' / " e �e �_ Notes/Comments� �,"':.�� r\ �_,� � : -��-. � ,. r � ;r� _ �� �, . . � 5 t ♦,' � -� '�-� � � � . . . � �'�._.. , � � ,.. + •� '�r, �,. --c Performed By: �':_ Reviewed By: Date: This is a preliminary report and is provided solely as evidence that field observations and/or testing was performed.Observations and/or conclusions and/or recommendation conveyed in the final report may vary from,and shall take precedence over,those indicated in a preliminary report.