Laserfiche WebLink
HAUG � <br /> ALO 1/10/14 <br /> � Daily Soil Observation Notes <br /> Project No: Date: Report No: <br /> Project Name: Project Location: <br /> Client: Temp/Weather: <br /> Project Manager: Time Arrived: Departed: <br /> x� <br /> ` � N A t :;� <br /> Areas Observed: ❑ Building Pad ❑House Pad ❑Roadway ❑Parking/Walks ❑ Footing <br /> ❑Proof Roll ❑Other(describe): <br /> Soil report available? ❑ Yes ❑No Report reviewed? ❑Yes ❑No Report prepared by: <br /> Finish floor evaluation: Bottom of footing elevation: Bottom of excavation elevation: <br /> Approved plans available? ❑Yes ❑No Specified compaction: Fill source: <br /> Oversizing appears adequate? ❑NA ' Yes ❑No Soils observed agree with Soils report? ❑Yes ❑No <br /> Soils appear adequate for design loads? QYes ❑No Proposed project bearing capacity(psf): <br /> Contractor notified of results? QYes ❑No Name of person notified: <br /> Was a copy of this report left on site? QYes ❑No If so,whom was it submitted to? <br /> N <br /> ,- <br /> � <br /> ; <br /> Notes/Comments: <br /> , , <br /> Performed By: Reviewed By: Date: <br /> 7his is a preliminary report and is provided solely as evidence that field observations and/or testing was performed.Observations and/or conclusions and/or <br /> recommendation conveyed in the final report may vary from,and shall take precedence over,those indicated in a preliminary report. <br />