HomeMy WebLinkAbout2017-00907 - roofing DATE TIME 1/
CITY OF ORONO CALLED IN 9- 7—l 7
INSPECTION NOTICESCHEDULED , t6'- -i 2 eX
PERMIT NO. oZ0/7-co Rio-7 OMPLETED —
ADDRESS :7 7 S .e �t Pi/.lam
OWNER TELEPHONE N /✓" 7c-5:5-07
CONTRACTOR ro - G(
E DESCRIPTION �4
/ /
) 2/"
W ❑ FOOTING ❑ DEMO-FINAL 0 SEPTIC FINAL •
Q ❑ POURED WALL 0 PLUMBING RI ❑ EXCAV/GRADING/FILLING
ElFOUNDATION WATERPROOF 0 PLUMBING FINAL ElTREE REMOVAL
C
Z ❑ RADON SLAB 0 MECHANICAL RI ❑ SITE INSPECTION
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS
Is ❑-INSULATION 0 WOOD BURNER/FIREPLACE 0 COMPLAINT
✓ 0 WATER HOOK-UP 0 FOLLOW-UP
W AS BUILT-SURVEY ❑ SEWER HOOK-UP 0 FOUNDATION/REMOVAL
v ❑ DEMO-SITE ElSEPTIC INSTALL
2 OWNERICONTRACTOR TO MEET YOU:_YES_NO
• COMMENTS:
42O.
OC
O rpi C
I. JE t wtiTf4 /CEJ
o
W
cc
W
ic
14.1 0 WORK SATISFACTORY:PROCEED J$ROJECT COMPLETE
CC
W 0 CORRECT WORK&PROCEED 0 ISSUE CERTIFICATE OF OCCUPANCY
O 0 CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
cj BEFORE COVERING PERMANENT
0 CORRECT UNSAFE CONDITION WITHIN HOURS. 0 PHOTO TAKEN
INSPECTOR WILL RETURN
0
0 STOP ORDER POSTED.CALL INSPECTOR CITATION ISSUED
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection?thours in advance. (952) 249-4600
OwnedContra ite: J
Inspector:
White Copy/Inspector's FIN Canary Copy/Site Notice