HomeMy WebLinkAbout2001 - site inspection - permit needed DATE TIME
CITY OF ORONO CALLED IN
INSPECTION NOTIC�/� SCHEDULED
PERMIT NO. ��1C� COMPLETED y�l � �
ADDRESS .3�a ,l��C/�/"✓-e �L-K
OWNER CONTR.
TELEPHONE N0.
� DESCRIPTION _ �---��r v� C'CCfi✓✓�7`
� Ot FOOTING 11 MECHANICAL RI 18 EXCA�//GRADING/FILLING
Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
y 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q OS FINAL 14 SEWER HOOK-UP O6 PROGRESS
� 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
v 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
= 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
v 10 PLUMBING FINAL 36 FOUNOATION/REMOVAL
� OWNERICONTRACTOR TO MEET YOU:_YES_NO
� CO MENTS:
W
a ���'l't � GC-/ C�/�"'
o n��
�
o �
c �- ✓
� � � ����
�
Q
�
z
W
�
W
�
�
d
W ❑WORKSATISFACTORY:PROCEED ❑PROJECTCOMPLEfE
� ❑CORRECT WORK&PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY
W
0 RRECT WORK,CALI FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECTUNSAFECONDITION WITHIN HOURS. O PHOTOTAKEN
INSPECTOR WILL RETURN ❑CITATION ISSUED
�TOP ORDER POSTED.CAIL INSPECTOR
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (g52) 249-46��
OwnerlContractor on site:
Inspector.��C- �,��I S
White CopyllnspectoPs File Canary Copy/Site Notice