HomeMy WebLinkAbout2017-00826 - plumbing DATE TIME
CITY OF ORONO CALLED IN
INSPECTION NOTICE / SCHEDULED j-31-1$` 3.60
PERMIT NO.p7Oh'COV� COMPLETED
ADDRESS 76,5 6f-1 ) k-/
OWNER j_, T LEPHONE NO / ' %� -
CONTRACTOR 5lu. / l €-S t i y
DESCRIPTION ��, 1_40
W ❑ FOOTING 0 DEMO-' INAL 0 SEPTIC FINAL
Q ❑ POURED WALL 0 PLUMBING RI ❑ EXCAV/GRADING/FILLING
y ❑ FOUNDATION DRAIN TILE JEQLUMBING FINAL 0 TREE REMOVAL
2 ❑ LATHE 0 MECHANICAL RI 0 SITE INSPECTION
Q 0 FRAMING 0 MECHANICAL FINAL 0 RATED WALLS
• ❑ INSULATION 0 WOOD BURNER/FIREPLACE 0 COMPLAINT
Q ElFINAL ElWATER HOOK-UP 0 FOLLOW-UP
lAj ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP 0 FOUNDATION/REMOVAL
r ❑ DEMO-SITE 0 SEPTIC INSTALL
2• OWNERICONTRACTOR TO MEET YOU:_YES_NO
r(., COMMENTS: f tlfJ4D /,- kW,4,
a '-' 4":01Zeot res .'- 5 e -/ Se JeQ. _
% 5h1 6--oc fro tinsel) a✓ L..%idird7e
N.. - / i. W. .4-rP it 1/a foe - D4
0
4.
et W t-tA,r IL eitivvy34,6r—
Q
2
tu
cc tee,w4evc-- rcoc V K:4 Ga►�
a
W ❑WORK SATISFACTORY:PROCEED / PROJECT COMPLETE
CCW
0 CORRECT WORK&PROCEED 0 ISSUE CERTIFICATE OF OCCUPANCY
OO 0 CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑PHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (952) 249-4600
Owner/Contractor on site:
Inspector. v /
White Copy/Inspector's File Canary Copy/Site Notice