HomeMy WebLinkAboutROW agreement CITY OF ORONO
HENNEPIN COUNTY, MINNESOTA
RIGHT-OF-WAY
PERMIT AGREEMENT
L RIGHT-OF-WAY PERMIT. Subject to the terms and conditions established by
city o din ces and as set fo h herein, the CITY OF ORONO ("City") hereby grants a permit
to �a� so�,r�� ��C ("Permittee")to allow the use of publicl wned o �
m a ed rights-of-w y for the installation, repair, and maintenance of q 5e�.�.- S� �' ✓��j���
a� �35 /✓f��+n.`t �rt. Permittee agrees to the terms of this Right-of-Way Permit Agreement.
2. PROPERTY. The right-of-way permit is for the right-of-way located in the City
of Orono, County of Hennepin, State of Minnesota, described on the attached Exhibit "A".
3. DEPOSIT OF ESCROW FUNDS. Contemporaneousl�with the execution of
this Permit Agreement, the Permittee shall deposit A'�o• and
no/100ths ($�.00) Dollars with the City. All accrue interest, if any, shall be paid to
the City to reimburse the City for its cost in administering the escrow acr��,��
4. PURPOSE OF ESCROW. The purpose �
reimbursement to the City for all out-of-pocket costs the ,,, � damage
to public property, right-of-way, or infrastructure that is c ����'U� planning,
engineering, or legal consultant review) associated with tl �j�} � , ��x� -���
. Eligible expenses shall be consiste ��� ,Q� ld incur
to correct any issues related to construction in the City's ri ��`
5. CONDITIONS. The permit is issued subject to the following conditions:
A. Permittee will comply with Minnesota Statutes § 216D.01-.09 (the State's
One Call Excavation Notice System) prior to conducting any work in the
right-of-�=�^-•
��� i reconstructio operatio , repair,
,
� /S.� /�.�.�1� ✓� shall be
�
�gulations of the Crty.
. � ' .
��� �" �� �r disturb the paved surface of any public
�, �� y�� � Nithout first having obtained permission
ity may impose reasonable conditions.
( � � the right-of-way, the Permittee shall restore
`� its foundation, to as good condition as
�� ��
�tain the same in good condition for two
hall be completed as promptly as weather
�� ��
J
166160 1
5
permits, and if the Permittee shall not promptly perform and complete the
work,remove all dirt, rubbish, equipment and material, and put the public
right-of-way in the same condition, the City shall have, after demand to
the Permittee to cure and the passage of a reasonable period of time
following the demand,but not to exceed five (5) days,the right to make
the restoration at the expense of the Permittee. The City shall draw on the
escrow to pay for all expenses associated with the work performed.
6. CLOSING ESCROW. The balance on deposit in the escrow, if any, shall be
returned to the Permittee when the review has been completed and deemed acceptable by the
City.
7. REVOCATION AND LAPSE. This permit will lapse if,within one(1) year of
the issuance of t 's permit,the allowed construction has not been completed.
Dated: a , 2013
CITY: PERMITTEE:
CITY OF ORONO
By: By: __.
Ci Administrator , Its Chairperson