Loading...
HomeMy WebLinkAbout2011-00009 - repair fire damage , CITY OF ORONO PERMIT NO.: 2011-00009 ' 2750 KELLEY PARKWAY ORONO, MN 55356- DATE ISSUED: OU12/2011 952 249-4600 FAX: 952 249-4616 ADDRESS : 601 MINNETONKA HGLD LA PIN : 06-117-23-41-0091 LEGAL DESC : MINNETONKA SUMMIT PARK : LOT 000 BLOCK 009 PERMIT TYPE : ADDITION/REMODEL/REPAIR PROPERTY TYPE : RESIDENTIAL CONSTRUCTION TYPE : ADDN/REMODEL/REPAIR ACTIVITY : 434-RESIDENTIAL VALUATION : $ 79,031.17 NOTE: SEPERATE PERMITS REQUIRED: PLUMBING,ELECTRICAL(STATE) REPAIR FIRE DAMAGE APPLICANT PERMIT FEE SCHEDULE 906.75 GIERTSEN COMPANY PLAN REVIEW 58939 8385 l OTH AVE N GOLDEN VALLEY, MN 55427- STATE SURCHARGE(VALUATION) 39.52 (763)546-1300 TOTAL 1,535.66 Minnesota State License#: 1796 OWNER VANCAMP,NATHAN&WENDY 601 MINNETONKA HGLD LA LONG LAKE, MN 55356- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if consuuction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conform with the State Building Code.This permit may be revoked at any ti for dUe cause. �` l /Zl /f � l /aZ� / pplican ee Signature Date I s d By igna ure Date SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE. • � � ��, � �b��� �� , � --�,�' '�' City of Orono Building Permit Application for New Structures or Additions Mailing Address: Permit number: �D� - b��� Qv�,� PO Box 66 � � � Crystal Bay, MN 55323-0066 Date received: � -j- � � ��`��'�'�"' Received by: a �7 :�` s. Street Address' �' �� '� '�`�� ti 2750 Kelle Parkwa � � p Y Y Plan review�e: L9kESHOg� Orono, MN 55356 g�� - Total Fee:}�U j ,����j� Main: 952-249-4600 Fax: 952-249-4616 www.ci.orono.mn.us / This application form must be completed in full and all required information must be submitted. Incomplete applications will be returned. (P/ease print) GENERAL INFORMATION: Job Site Address: Q/ � � % , ,� �� �C�v2 �-l�t lL—� Will this be a Parade of Homes, Remodelers Showcase Ho e or other Display Home? ❑ Yes o lf yes,a special event permit is required with Police Department and City Council approval 60 days prior to the event. Shuttle bus service w�ll be required unless applicant demonstrates su/ficient on-site parking is available. Non-permitted events will not be allowed. CONTRACTOR/APPLICANT INFORMATION: Name: �i Pr t3tVl �'r�. Of /�.�n� State License# � Expiration Date: '�--3/ -/Z. Phone: �� �,.- ��[c (office) (o/Z- '7C?3- �S`3/ (cell) Mailing Address: ��g�� /��� ��� ^/ City:� !rf �/a/fLh ZIP: 5,5's�Z7 Contact Person: gC V/J� �/f-p� Applicant is: oniractor' / Ho eowner (CircleOne) Email and/or Fax: hc V��h r= Gi%G�'f3Cr� O . GD� PROPERTY OWNER INFORMATION: /� Name: ,/��Q �CI`; �h C..Q,rr�,p Phone(day): 2/ - "8- z ' Address: p Cit : �/CG ZIP: ,s$",�� Email and/or Fax ARCHITECT/ENGINEER INFORMATION: Name: Phone(day): Address: Cit : ZIP: Email and/or Fax: PROJECT INFORMATION: 1.Type of Project 2. Proposed Use 3.Structure Type 4.Sewage Disposal& Water Supply ❑ New Construction �]Single Family with �Residence ❑Addition attached garage ❑ Garage/Accessory Bldg. ❑ Public Sewer ❑Accessory Building ❑ Single Family with ❑ Deck ❑ Relocation I / detached garage ❑Office/Commercial ❑ Private Sewer �Other:(specify) [�l+�l,G1 �G� ❑Multiple Family/Condo ❑Warehouse ❑ Public ❑ Storage ❑ Public Water **Any earth movement may require ❑Commercial ❑ Other(specify) MCWD review&permits. ❑ Industrial ❑ Private Well Minnehaha Creek Watershed District(MCWD) ❑Other:(specify) 18202 Minnetonka Blvd Deephaven,MN 55391 Phone: 952-471-0590 Fax: 952-471-0682 www.minnehahacreek.or Estimated Construction Valuation(excluding land) $ �� ` Last Updated: 12/21/2010 - 19- STRUCTURE INFORMATION: 1. Structure Dimensions 1. Structure Dimensions(continued) 2.Type of Construction a. Length(ft.)= Number of bedrooms= ❑Wood/Frame ❑ Masonry b.Width(ft.)= Number of garage stalls: ❑Metal Attached= ❑ Pole Bidg. Areas in square feet Detached= ❑ ICF ❑On-site Prefab c. Basement= ❑Off-site Prefab d. 151 Story = ❑Other(please specify): e.2nd StOry= f. YZ Story = g.Total Area= REQUIRED SUBMITTALS: All of the information must be submitted in order for your application to be processed: Not Enclosed A licable ❑ ❑ Permit A lication ❑ ❑ Pro osed Buildin Plans ❑ ❑ MN State Ener Code Calculations and Mechanical Code Re uirements Form ❑ ❑ Surve meetin all re uirements ❑ ❑ Stormwater Pollution Prevention Plan ❑ ❑ Hardcover Calculation s ❑ ❑ Se tic S stem Site Evaluation Re ort ❑ ❑ Access Permit ❑ ❑ Wetland Buffer Im rovement Plan ❑ ❑ En ineered Plans for Retainin Walls 4 feet or above ❑ ❑ Plan Review Fee • ❑ ❑ Other . APPLICANT ACKNOWLEDGEMENT: • Agrees to provide all information required or requested by the Building Department; • Agrees to pay the City of Orono for engineering consultant review costs in excess of$500; • Certifies that the information supplied is true and correct to the best of his/her knowledge. The applicant recognizes that they are solely responsible for submitting a complete application being aware that upon failure to do so, the staff has no alternative but to reject it until it is complete; • Acknowledges the Escrow Agreement is completed and signed; • Some or all of the information that you are asked to provide on this application is classified by State law as either private or confidential. Private data is information which generally cannot be given to the public but can be given to the subject of the data. Confidential data is information which generally cannot be given to either the public or the subject of the data. Our purpose and intended use of this information is to annually update our records and records of other governmental agencies required by law. If you refuse to supply the information,the application may not be issued. � ApplicanYs Signature: Date: /— �� < � Last Updated: 12/21/2010 -20- f ' ` Plan_Review Checkiist for New $tructures / Additions Address/ PID/Legal: (�O 1 ►'Y\ 1 VJ�L"-TDNI�r4 I'��bl`l lhvv./JS C�V`1L� Description of work: _ l—t i2,V (� Y�v,1,� e �2.�,�/��(Z Septic review by: _ N/1/� Date Approved: Zoning review by: Date Approved: Building review by: Date Approved: / - i�- ?�O� � Grading review by: Date Approved: Zoning File#: Resolution#: Resolution Date: Zonin District Fire De artment Post Office School ' trict Zoning: Lot Area: SF/AC Width: D th: Survey Submitt : � Yes � No Date of Survey: Pro osed Setbacks. Front(Lake) ar(Street) ( N S E W ) ( N S E W ) Other Buildings Wetfand Side Side Building Defined Height: Building Peak H ght: FOR A BUILDING WITH A BASEMENT OR CRA L SPACE: F R A BUILDING ON A SLAB FOUNDATION: START the distance between the b ement floor/ START the distance between the slab and the WITH crawl space floor and the high st roof peak, WITH highest roof peak, the top of the cornice the top of the cornice of a flat ro the dec of a flat roof, the deck line of a mansard line of a mansard roof, or the uppe os roof, or the uppermost point on a round or oint on a round or other arch-t e r other arch-t e roof SUBTRACT half the distance between the high t SUBTRACT half the distance between the highest window and highest roof peak o pitche window and highest roof peak of a roof itched roof SUBTRACT the distance between the sement floor/ ADD the distance between the slab and the crawl space floor and t highest existing highest existing grade within the grade within the fou tion or 10 feet, foundation whichever is less. E ALS Defined buildin hei ht EQUALS Defined buildin ei ht Lot Coverage: SF % Shoreland Dis ct MCWD Permit Received Avera e Lake ore Setback Bluff � Yes � No 0 Yes � No 0 N/A p Yes 0 No � N/A � Yes 0 No Permit Number: Setback: Hard ver Zones Existin P�oposed Variance Re uired CUP Re uired 0-75' � Yes ❑ No Yes 0 No 75-250' Type�s�: Typ S�: 250-500' 500-1000' REMARKS (in-house): (� C1-� lr Updated: 07/01/2009 z:\forms�plan review checklist.docx Fees to be Cha ed �!ES NO � � � ��r�, rx a ��.1.�. ., x-,.k,,, , � ����'::�' ._.+...��:`� t !z'.:Y kW`_S � f . � . � -.. .. - ,.. .. ..: . ._' ...,,. .. . .�_ . . .- ... .. . . ... .. _ . �.. Plan Review �/ i�ra`�e�a � .; _ g . .. , . Investi ation Fee ' ��1�����'be���9►��'its _ -:�t�:. : , � .. _ _ < :. _. Sewer Connection �a���ie���� ,� ' t. '�. � � -;x :� �: ...._ .. .. . ,.. ,� �. _... , Park Fee �te�r] ieiC�';i� �;�� ,x _ , ,� Other(s eci �15�@���1[0'?B�S`�i@�'�a�� �� ""' ` - _ a' - '� . . .. . ,. . ... ._ .... Calculated B : UBC: Construction Type: S uare Foota e $ er S uare Foota e Basement x = $ 1 Floor X = $ 2" Fi00r X = $ Gara e X = $ Estimated Construction Value: $ '?�1, b31 . l� Orono Inspections Reauired Work Reauirina Separate Permits Reauired State Permits � Site Plumbing � Grading / Filling � Well 0 Hardcover Removal � Mechanical � Fire ,0'Electrical � Footing � Septic ❑ Water Connection 0 Foundation Survey � Fireplace 0 Sewer Connection J�'Framing 0 Masonry � Lawn Irrigation �Insulation 0 Mfg. . 0 Wall Board 0 Other(specify) 0 As-Built Survey �Final G Other s eci REMARKS (in-house): Other Review: Reviewed by: Date Approved: Access:Existing: 0 YES 0 NO New: 0 YES 0 NO REMARKS (TO BE NOTED ON PERMIT AND INITIALLED BY PERSON PULLING PERM(T) Updated: 07/01/2009 z:\forms�plan review checklist.docx , � . Giertsen Company of Minnesota F�� 8385 10"'Avenue North ��,� Golden Valley, MN 55427 763-546-1300 Lic# 1796 ClienC Nattian Vancamp Home: (218} 348-2309 Property: 601 Minnetonka Highlands Drive Long Lake, MN 55356 Operator Info: Operator_ OWNER Estimator_ Leon Olmschenk Business: (612) 280-8355 Type of Es[imate: Fire , Date Entered: 12/13/20I0 Date Assigned: Price LisC MNMN7X_NOV10 Labor Efficiency: Restoration/Service/Remodel Estimate: VANCAMP-STRUCTURE ���� ��q� �r� � _ - ' GIYY OF ORONO ' '�iJlLUI�VG PER I P N RE1l1EW iNSPECTCFi �rNt..� ,_ DA?E���• �..01�_ PE:'r1+:�1T P10. ' . .�f�t'�iL'��L'L+tl.i':�.'!1'r�I� �i.ii Ci AS�PR�.;',�:'�;';°i;, U�;;`:�:"^T:._�:,iS A,S��l�TED �i ��.4T ��,:;�;•,-,,::;�-- `' � , - ,•, T f1. �Le ��t .,ui:�)I 'f1E;: nrr,;��ar�,:, .`<..J 1:i�.,.. .�:'aW��l. hJl:,•U;K S�'..:!1)2 f�Jfl9 !1 fi'1+ .J�1 t' tti,:.�� ,.� <-.f ��':.%i...�d .:II(�Ilt� ?.fiC i:ui'I�i'y'ltJG�A. +1BG:Yl�?Ci1C�Ti3 7i1U'..i�l',��I!ISI�1' `S��' ,.iti.i±ID�li'�:.�;: �'fF�l3 i9:'18'N. KEEP THtS ri�����;��'i����C P11 A..,TI{hES SPE�[AL 1�IIOTE SEE ATT,clCF-�E� �HEET FOR t��r sr�,w�cr.�c.r�.c�o� COd?E ���°��"::;���:.'.�.�rtC=�T� � ........_.�..._._�,..._.�.._. �D/ %2�,� �l� �� e� , � � Giertsen Company of Minnesota 8385 lOm Avenue North ��� Golden Valley,MN 55427 763-546-1300 Lic# 1796 VANCAMP-STRUCTURE Upper Level N�y IxWxH 12'S"x 9'9"x g� 322.17 SF Walls 121.06 SF Ceiling - '�. 443.23 SF Walls&Ceiling 121.06 SF Floor 13.45 SY Flooring 39.33 LF Floor Perimeter 99.33 SF Long Wall 78.00 SF Short Wall 44.33 LF Ceil,Perimeter Missing Wall: 1- 5'X 6'6" Opens into Excerior Goes to Floor Subroom 1: Closet LxWxH 6'2"x 2'1"x 8' i 132.00 SF Walls 12.85 SF Ceiling "� - 144.85 SF Walls&Ceiling 12.85 SF Floor 1.43 SY Flooring 16.50 LF Floor Perimeter 'Y� 49.33 SF Long Wall 16.67 SF Short Wall � 16.50 LF CeII.Perimeter DESCRIPTION • QNTY REMOVE REPLACE ' TOTAL Structure Below Ceiling 1. SeaI&paint acoustic ceiling(popcom) 133.91 SF 0.00 0.75 100.43 texture 2. Mask wall-plastic,paper,tape(per LF) 60.83 LF 0.00 0.85 51.71 3. Detach&Reset Light fixture 1.00 EA 0.00 0.00 50.36 WalLs 4. Seal then paint the wa1Ls(2 coats) 454.I7 SF 0.00 0.57 258.88 5. R&R Window blind-double cell-7.1 to 3.00 EA 8.63 125.37 402.00 14 SF Floor 6. Remove Carpet 133.91 SF 0.23 0.00 30.80 �• C�t 154.00 SF 0.00 2.98 458.92 15%waste added for Carpet 8. R&R Carpet pad 133.91 SF 0.10 0.61 95.08 Itel samples not sent in yet� 9. Finish baseboard- 1 coat urethane 55.83 LF 0.00 0.64 35.73 ANCAMP-SfRUCTURE 12/13/2010 Page:2 lP0/ /2��lca t�y�oL- . + Giertsen Company of Minnesota 8385 10'�Avenue North �:;;,� Golden Valley,MN 55427 763-546-1300 Lic# 1796 CONTINUED-Nursey DESCRIPTION QNTy REMOVE REPLACE TOTAL 10. Finish casing- 1 caat urethane 74.00 LF 0.00 0.63 46.62 11. Finish door slab only- 1 coat urethane- 2.00 EA 0.00 20.99 41.98 ext (per side) 12. Finish door/win him&jamb- 1 coat 2.00 EA 0.00 14.41 28.g2 urethane (per side) Totals: Nursey 1,601.33 . Master Bath LxWxH 6'x 5'2"x 8' �s•- 154.75 SF Walls 31.00 SF Ceiling � ' �� 185.75 SF Walls&Ceiling 31.00 SF Floor 3.44 SY Flooring 18.92 LF Floor Perimeter � 48.00 SF Long Wall 41.33 SF Short Wall 22.33 LF Ceil.Perimeter . Missing Wall: 1- 3'S"X 7' Opens Iinto Exterior Goes to Floor . Subroom 1: Offset LxWacH 3'S"x 2'10"x?' �;.. 87.50 SF Walls 9.68 SF Ceiling ` 97.18 SF Walls&Ceiling 9.68 SF Floor � 1.08 SY Flooring 12.50 LF Floor Perimeter 23.92 SF Long Wall I9.83 SF Shoct Wall 12.50 LF Ceil.Ferimeter DESCRIPTION QNTY REMOVE REPLACE TOTAL Structure Below Ceil�n 13. Seal&paint acoustic ceiling(popcorn) 40.68 SF 0.00 0.75 30.51 texture 14. Mask waIl-plasCic,paper,tape(per I.F� 34.83 LF 0.00 0.85 29.61 15. Detach&Reset Light fixture 1.00 EA 0.00 0.00 50.36 Walls 16. Seal then paint the wa1Ls(Z coats) 242.25 SF O.UO 0.57 138.08 17. Detach&Reset Mirror-1/4"plate glass 12.00 SF 0.00 0.00 65.52 VANCAMP-STRUCTURE 12/13/ZO10 Page:3 �Q� i��� �y�-° ' � ___.__ Giertsen Company of Minnesota � 8385 10'"Avenue North s°' Golden Valley,MN 55427 763-546-1300 Lic# 1796 CONTINUED-Master Bath DESCRIPTION QNTY REMOVE REPLACE TOTAL Floor 18. Mask the floor pe�square foot-plastic 40.68 SF 0.00 0.17 6.92 and tape-4 mil 19. Finish baseboard- 1 coat urethane 31.42 LF 0.00 0.64 20.11 20. Finish casing- 1 caat urethane 74.00 LF 0.00 0.63 46.62 21. Finish door siab only- 1 coat urethane- Z_00 EA 0.00 20.99 41.98 ext(per side) Totals: Master Bath 429.71 Master Bed LxWxH 12'10"x 11'8"x 8' 366.00 SF Walls 149.72 SF Ceiling ("",1 %'f ^ �• 515.72 SF Walis&CeiIing 149.72 SF Floor �`������'� 16.64 SY Flooring 45.75 I.F Floor Perimeter 102.67 SF Long Wall 93.33 SF Shod Wall 45.75 LF Ceil.Pecitneter Missing Wall: 1- 3'3"X 8' Opens into Exterior Goes to Floor/Ceiling Subroam 1: Closet 1 LxWxH 4`4"x 2'2"x 8' 104.00 SF Walls 9.39 SF Ceiling ' '`- 113.39 SF Walls&Ceiling 9.39 SF Floor 1.04 SY Flooring 13.00 LF Floor Perimeter 34.67 SF Long WaII 17.33 SF Short Walt 13.00 LF Ceil.Perimeter Subroom 2: Clacet 2 IxWxH 4'4"x 2'2"x 8' � 104.00 SF Walls 9.39 SF Ceiling � ~ �• 113.39 SF Walls&Ceiling 9.39 SF Floor 1.04 SY Flooring 13.00 LF Floor Perimeter 34.67 SF Long Wall 17.33 SF Short Wall 13.� LF CeiI.Perimeter ANCAMP-STRUCTURE 12/13/2 1 0 0 Page:4 �D/ ����� t���-' .C��-z� Giertsen Company of Minnesota � 8385 10�'Avenue North { Golden Valley,MN 55427 `` 763-546-1300 Lic# I796 CONTINUED-Master Bed Subroom 3: Offset LxWxH 3'3"x 2' 7"x 8' �;._''_, , 93.33 SF Walls 8.40 SF Ceiling � ' 101.73 SF Walls&Ceiling 8.40 SF Floor 0.93 SY Flooring 11.67 LF Floor P�imeter 26.00 SF Long Wall 20.67 SF Short Wall 11.67 LF Ceil.Perimeter DESCRIPTION QNTy REMpVE REpI,qCE TOTAL Structure Below Ce�luig ZZ. Seal&paint acoustic ceiling(popcocn) 176.90 SF 0.00 0.75 132.68 texture 23. Mask wall-plastic.paper.tape(per L� 83.42 LF 0.00 0.85 70.91 24. Detach&Reset Light fixture 1.00 EA 0.00 0.00 50.36 � Walls 25. Seal dien paint the walls (Z coats) 667.33 SF 0.00 0.57 380.38 26. R&R Window blind-double cell- 7.1 3.00 EA 8.63 125.37 402.00 to 14 SF ' Floor � - � • 27. Remove Carpet 176.90 SF 0.23 0.00 40.69 Z8' Ca`pet 203.43 SF 0.00 2.98 606.22 15%waste added for Carpet� 29. R&R Carpet pad 176.90 SF 0.10 0.61 125.60 Itel samples not sent in yet. 30. Finish baseboard- 1 coat urethane 83.42 LF 0.00 0.64 53.39 31. Finish casing- 1 coat urethane 86.00 I.F 0.00 0.63 54.18 32. Finish door slab only- 1 coat ured�ane- 4.00 EA 0.00 20.99 83.96 ext(per side} 33. Finish doodwin trim&jamb- 1 coat 4.00 EA 0.00 14.41 57.64 urethane (per side) Totals: Master Bed 2,058.01 ANCAMP-STR UCTURE 12/13/2010 Page:5 �D� r��Q ��y�� Giertsen Company of Minnesota 8385 ]0'�Avenue North �.� Golden Valley,MN 55427 763-546-1300 Lic# 1796 Middle Bedroom LxWxH 11'10"x 9`2"x 8' j_ 336.00 SF Walls 108.47 SF Ceiling � � � � 444.47 SF Walls&Ceiling 108.47 SF Floor 12.05 SY Flooring 42.00 LF Floor Perimeter 94.67 SF Long Wall 73.33 SF Short Wall 42.Q0 LF Ceil.Pecimeter � Subroom I: Closet 1 LxWxH 4'S"x 2'2"x 8' 105.33 SF Walls 9.57 SF Ceiling 114.90 SF Walls&Ceiling 9.57 SF Floor 1.06 SY Flooring 13.17 LF Floor Perimeter 35.33 SF Long Wall 17.33 SF Short Wall 13.17 LF Ceil.Perimeter � Subroom 2: Closet 2 LxWxH 4'S"x 2'2"x 8' 105.33 SF Walls 9.57 SF Ceiling %'� 114.90 SF Walls&Ceiling 9.57 SF Floor 1.06 SY Flooring 13.17 LF Floor Peri�eter • . � 35.33 SF Long Wall • � 17.33 SF Short Wall 13.I7 LF Ceil_Perimeter DESCRIPTION QNTY REMOVE REPLACE TOTAL Stru�Below Ceiling 34. Seal&paint acoustic ceiling(popcorn) 127.61 SF 0.00 0.75 95.71 texture 35. Maslc wall-piastic,paper,tape(per LF) 68.33 LF 0.00 0.85 58.08 36. Detach&Reset Light fixture 1.00 EA 0.00 0.00 50.36 Walls 37. Seal then paint the wa1Ls(2 coats) 546.67 SF 0.00 0.57 311.60 38. R&R Window blind-double cell-7_1 Z.00 EA 8.63 1Z5.37 268.00 to 14 SF Floor 39. Remove Cacpet 1Z7.61 SF 0.23 0.00 29.35 40. Carpet 146.75 SF 0.00 2.98 437.32 15 %waste added for Carpe� ANCAMP-STRUCTURE 12/13/2010 Page:6 �D/ �Za�-`'�. � ���-- �� Giertsen Company of Minnesota � 8385 10`h Avenue North Golden Valley, MN 55427 763-546-1300 Lic# 1796 CONTINUED-MIddle Bedroom DESCRIPTION QNTY REMOVE REPLACE TOTAL 41. R&R Carpet pad 127.61 SF 0.10 0.61 90.60 Itel samples not sent in ye� 42. Finish baseboard- (coat urethane 68.33 LF 0.00 0.64 43.73 43. Finish casing- 1 coat urethane 74.00 LF 0.00 0.63 46.62 44. Finish door slab only- 1 coat urethane- 2.00 EA 0.00_ Z0.99 41.98 ext(per side) 45. Finish door/win trim&jamb- 1 coat 2.00 EA 0.00 14.41 28.g2 urethane (per side) Totals: Middle Bedroom 1,502.17 Bath up LxWxH 7'3"x 5'10"x 8' � 169.33 SF Walls 42.29 SF Ceiling =' 211.63 SF Walls&Ceilin S 42.29 SF Floor 4.70 SY Flooring 21.17 LF Floor P�imeter . 58.00 SF Long Wall 46.67 SF Shoct Wall ' Z1.17 LF Ceil.Perimeter ' Mlssing Wall: 1- 5'X 8' Openc into Exterior Goes to Floor/Ceiling Sub�om 1: Offset LxWxH 5'x 3'x 8' • 128.00 SF Walls 15.00 SF Ceiling �l �• 143.00 SF Walls&CeiIin '' S 15.00 SF Floor 1.67 SY Flooring 16.00 LF Flnor Perimeter 40.00 SF Long Wall 24.00 SF Short Wall 16.00 LF Ceil.Perimeter DESCRIPTZON QNTY REMpVE REpLACE TOTAL Struct�u e Below Ce�l�ng 46. Seal&paint acoustic ceiling(popcorn) 57.29 SF 0.00 0.75 42.97 texture 47. Mask wall-plastic,paper,tape(per L.F) 37.17 LF 0.00 0.85 31.59 48. Detach&Reset Light fixture 2.Q0 EA Q.00 0.00 100.72 ANCAMP-STRUCTURE 12l13/2010 Page:7 �p�/ iG��cc� ,��� ��� Giertsen Company of Minnesota 8385 10`�Avenue North t�� Golden Valley,MN 55427 763-546-1300 Lic# 1796 CONTINUED-Bath up ' DESCRIPTION QNTY REMOVE REPLACE TOTAL Walls 49. Seal then paint the walls(2 caats) 297.33 SF 0.00 0.57 169.48 50. Detach&Reset Mirror- 1/4"plate glass 12.00 SF 0.00 O.QO 65.52 Floor 51. Mask the floor per square foot-plastic 57.Z9 SF 0.00 0.17 9.7q and tape-4 mil 52. Finish baseboard- 1 coat urethane 12.00 LF 0.00 0.64 7.6g 53. Finish casing- 1 coat urethane 74.00 LF 0.00 0.63 46.62 54. Finish door slab only-1 coat urethane- 2.00 EA 0.00 20.99 41.98 ext (per side) TotaLs: Bath up 516.30 � �up I.xWxH15'7"x2'9"xg' � 271.33 SF Walls 42.85 SF Ceiling %"' ''� . • 314.19 SF Walls&Ceiling , 42.85 SF Floor 4.76 SY Ftooring 33.92 LF Flooc Ferimeter 124.67 SF Long WaII 22.00 SF Shoct Wall 33.92 LF CeiL Perimeter Missing Wall: 1- 2'9"X 8' Openc into Exterior Goes to Floor/Ceiling Subroom 1: Closet 1 IxWsH 2'8"x 2'x 8' 74.67 SF Walls 5.33 SF Ceiling � ' � . 80.00 SF Walls&Ceiling 5.33 SF Floor 0.59 SY Flooring 9.33 LF Floor-Perimeter 21.33 SF Long Wall 16.00 SF Short Wall 9.33 LF Ceil.Perimeter ANCAMP-STRUCTURE 12/13f2010 Page:8 Ca0/ �%��1� ��9� ��`I� Giertsen Company of Minnesota ;`� 8385 ]0'"Avenue North ` Golden Valley,MN 55427 763-546-1300 Lic# 1796 CONTINUED-Hall up Subrnom 2: Closet 2 LxWxH 2'3"x 2'x 8' > 68.00 SF Walls 4.50 SF Ceiling ` ^ "' 72.50 SF Walls&Ceiling 4.50 SF Floor 0.50 SY Flooring 8.50 I.F Floor Perimeter 18.00 SF Long Wall 16.00 SF Short Wall 8.50 LF Ceil.Perimeter DESCRIPTION QNTY REMpVE REpLACE TOTAL Structure Below Ce�7ing 55. Seal&paint acoustic ceiling(popcorn) 52.69 SF 0.00 0.75 39.52 texture 56. Mask wall-plastic,paper,tape(per LF) 5I.75 LF 0.00 0.85 43.99 57. Detach&Reset Light fixttu�e 1.00 EA 0.00 0.00 50.36 Q58. R&R Smoke detector 1.00 EA BID ITEM 59. R&R Reducer strip-for wood flooring 3.00 LF 0.33 5.04 16.11 WaILs 60. Seal then paint the walls (2 cx�ts) • 414.00 SF 0.00 . 0.57 ' 235.98 Floor 61. Remove Carpet 52.69 SF 0.23 0.00 12.12 62. Carpet 60.59 SF 0.00 2.98 180.56 15%waste added for Ca�pet 63. R&R Cacpet pad 52.69 SF 0.10 0.61 37.41 Itel samples not sent in yeG 64. Finish baseboard- 1 coat urethane 51.75 LF 0.00 0.64 33.12 65. Finish casing- 1 coat urethane 204.00 LF 0.00 0.63 128.52 66. Finish door slab only- 1 coat urethane- 12.00 EA 0.00 20.99 251.88 ext(per side) TotaLs: Hall up 1,029.57 AIVCAMP-STRUCTURE 12/13/2010 Page:9 lvD/ ��q�Q° ���� Giertsen Company of Minnesota ; 8385 10�'Avenue North `--_.-� Golden Valley,MN 55427 763-546-(300 Lic# 1796 Dining Room Formula Sloped Ceiling I1'S"x 11'1"x 9'10" 141.00 SF Walls 128.16 SF Ceiling 269.16 SF Walls&Ceiling 126.53 SF Ftoor ��•. 14.06 SY Flooring 16.50 LF Floor Perimeter 22.79 LF Ceil.Perimeter Missing Wall: 1- 11'1"X 9'10" Opens into Exterior Goes to Floor/Ceiling M��g W�: 1- 6'X 6'6" Opens into Fxterior Goes to Floor Missing Wall: 1- 11'S"X 9'10" Opens into F.rterior Goes to Floor/Celling DESCR�PTION QNTy REMpVE REpL,pCE TOTAL � 67. RBcR 5/8"drywall-hung,taped, 128.16 SF 0.36 1.54 243_51 floated,ready for paint 68. Seal floor or ceiling joist•sys. (white 128.16 SF 0.00 0.74 94.84 pigmented shellac) � 69. R&R Batt insulation-S"-R25 128.16 SF 0.39 0.86 160.20 70. R&R Visqueen vapor barrier . 128.16 SF 0.07 0.25 41.01 71. Detach&Reset Chandelier 1.00 EA BID TTEM . 72. Seal then paint the ceiling(Z coats) . 128.1�SF 0.00 037 73.05 Walls 73. Seal then paint the walls(2 coats) 141.00 SF ' 0.00 0.57 80.37 Floor 74. R&R Engineered wood flooring I26.53 SF 2.01 8.46 1,324.77 75. SeaUprime the floor-one coat 126.53 SF 0.00 0.32 40.49 76. R&R Baseboard-3 1/4'hardwood 16.50 LF 0.39 3.49 64.03 77. Stain&finish baseboard 16.50 LF 0.00 0.95 15.68 78. R&R Base shce 16.50 LF 0.14 1.14 21.12 79. Stain&finish base shce or quarter 16.50 LF 0.00 0.77 12.71 round 80. Finish baseboard- 1 coat urethane 10.50 LF 0.00 0.64 s.y2 81. Finish casing- 1 �at urethane 20.00 LF 0.00 0.63 12.60 Totals: Dining Room 2.191.10 ANCAMP-STRtJCTURE 12/13/2010 Page: 10 l�a/ ���� ��`� L�� Giertsen Company of Minnesota 8385 10`�Avenue North i'� Golden Valley,MN 55427 �" 763-546-1300 Lic# 1796 Kitchen Formula Sloped Ceiling 11'S"x 10'6"x 9' 10" 192.58 SF Walls 121.41 SF Ceiling 313.99 SF Walls&Ceiling 119.88 SF Floor --------------' 13.32 SY Floori � 32.42 LF Floor Perimeter 32.71 LF Ceil.Perimeter Missing Wall: 1- 11'S"X 9`10" Opens into Exterior Goes to Floor/Ceiling Missing Wall: 2- 10'6"X 2' Openc into Exterior Goes to neither Floor/Ceiling Missing Wall: 2- 11'X 2' Opens into Fxterior Goes to neither Floor/CeiL'ng DESCRIPTION QNTy REMpVE REpLACE TOTAL �� 82. Seal then paint the ceiling(2 coats) 121_41 SF 0.00 0.57 69.20 83. Recessed light fixture-Detach&reset 4.00 EA 0.00 4.02 16.08 trim only 84. Detach&Reset Light 6xture 2.pp EA BID ITEM (� Walls �..J 85. Seal then paint the walls(2 coats) 192.58 SF 0.00 0.57 109.77 Floor 86.�R&R Engineered wood flooring ' 119.88 SF . Z.O1 8.46 � 1.255.14 . 87. R&R Baseboard-3 1/4"hardwood 32.42 LF 0.39 3.49 125.79 88. Stain&finish baseboard 32.42 LF 0.00 0.95 30.80 89. R&R Base shoe 32.42 LF 0.14 1.14 41.50 90. Stain&fmish base shce or quarter 32.42 LF 0.00 0.77 24.96 round 91. Refrig_water line-Disconnect& 1.00 EA 0.00 61.44 61.44 reconnect-with repaits 92. Refrigerator-Remove&reset 1.00 EA 0.00 35.04 ' 35.04 93. Dishwasher-Detact�&mset 1.00 EA 0.00 204.71 204.71 94. Finish baseboard- 1 coat urethane 10.00 LF 0.00 0.64 6.40 95. Finish casing- I coat urethane 12.00 LF 0.00 0.63 7.56 96. Finish doorfwin trim&jamb- 1 coat 1.00 EA 0.00 14.41 14.41 urethane(per side) 97. Tile/stone sealer 119.88 SF 0.00 0.90 107.89 Totais: Kitchen 2,110.69 ANCAMP-STRUCTURE 12/1 3/ZO10 Page: ll ��� ��� ��� Giertsen Company of Minnesota � 8385 10'"Avenue North f Golden Valiey,MN 55427 763-546-1300 Lic# 1796 Living Room Formula Slopecl Ceiling 16'6"x 14'6"x 9' 10" 106.09 SF Walls 241.15 SF Ceiling 347.25 SF Walls&Ceiting 239.25 SF Flaor --------------' 26.58 SY Floorin b 19.58 LF Floor Perimeter 26.31 LF Ceil.Perimeter Missing Wa1[: 1- 8'3"X 4'3" Opens into Exterior Goes to neither FloorlCei7ing M➢ssing Wall: 1- 6'6"X 9' Opens into Exterior Goes to Floor Missing Wall: 1- 11'1"X 9'10" Opens into F.xterior Gocs to FIoor/Ceiling Missing Wall: 1- 13'6"X 9'10" Opens into Fxterior Goes to Floor/Ceiling 1�'Iissing Wall: 1- 4'3"X 9' 10" Opens into Exterior Goes to Floor/Ceiling Missing Wall: 1- 7' 1"X 9'1Q" Opens into Facterior Goes to Floor/Ceiling Subroom 1: Offset Formula Sloped Cejling?'1"x 4'3"x 9'10" � 217.22 SF Walls 30.31 SF Ceiling 247.53 SF Walls&Ceiling 30.10 SF Floor ---------------' 3.34 SY Flooring 22.67 LF Floor Perimeter 22.73 LF Ceil.Perimeter DESCRIPTION . QNTY REMOVE REPLACE TOTAL Ceiling 98. R&R 5/8"drywall-hung,taped, 271.47 SF U_36 1.54 515.79 floated,ready for paint 99. Seal floor or ceiling joist sys. (white 271.47 SF 0.00 0.74 200.89 pigmented shellac) 100. R&R Visqueen vapor barrier 271.47 SF 0.07 0.25 86.87 101. Seal then paint the ceiling(Z coats) 271.47 SF 0.00 0.57 154.74 102. Detach&Reset Recessed light fixture 6A0 EA BID ITEM Fixture replacement open pending cleaning and inspection Walls 103. R&R 2'x 6" lumber(1 BF per LF� 64.00 LF 0.51 1.98 159.36 104. Carpenter-Genecai Framer-per hour 8.00 HR 0.00 61.58 492.64 labor to repair framir►g 105. R&R 2"x 12"lumber(Z BF per LF) IZ.00 LF 0.94 2.95 46.68 106. R&R Stud wall-2x6-treated (per BF, 1.00 BF 0.18 1.95 2.13 ANCAMP-STRUCTURE LZ/13/2010 Page: 12 l�0/ %�a�� ����% �`� Giertsen Company of Minnesota � 8385 10�'Avenue North ' ...- Golden Valley,MN 55427 763-546-1300 Lic# 1796 CONTIlVUED-LIving Room DESCRIPTION QNTY REMpVE REpLACE TOTAL framing repairs open pending demo and code enforcement 107. R&R 1/2"drywall-hung,taped, 128.00 SF 0.36 1.40 225,2g floated,ready for paint 108. Seal stud wall for odor control(white 141.00 SF 0.00 0.55 77.55 pigmented shellac) 109. Seal then paint the walls(2 coats) 323.31 SF 0.00 0.57 184.29 110. R&R Window blind-single cell-7.1 2_00 EA 8.63 111.37 240.00 to 14 SF 111. R&R Firepiace mar�kel_stain grade or 1.00 EA 45.91 1,176.71 1,222.62 hardwood-custom 112. Stain&finish wood fireplace mantel 24.00 LF 0.00 4.55 109.20 Floor 113. R&R Engineered wood flooring 269.35 SF Z.O1 8.46 2,820.09 114. Seal/prime part of the floor-one coat 134.68 SF 0.00 0.32 43.10 �"""� 115. R&R Baseboard-31/4"hardwood 42.25 LF 0.39 3.49 163.93 �J 116. Stain&finish baseboard 42.25 LF 0.00 0.95 40.14 117. R&R Base shce 42.25 LF 0.14 1.14 54.09 118. Stain&finish base shce or quarter 42_25 LF 0.00 0.77 - 32.53 round 119. R&R Underlayment-3/4"BC 134.68 SF 1.08 2.02 417.50 P1Y�'� 120. Finish baseboard- 1 coat urethane 42.25 LF . 0.00 0.64 27.04 121. Finish casing- 1 coat uretttane 26.00 LF 0.00 0.63 16.38 122. Finish door/win trim&jamb- 1 coat 2.00 EA 0.00 14.41 28,g2 urethane(per side) Totals: Living Room 7.361.66 Total:Upper Level 18,800.54 ANCAMP-STRUCTLTRE 12/13/2010 Page: 13 �Q/ ,;d�l� r�L�L�Z�J Giertsen Company of Minnesota n-�.�''� 8385 10`�Avenue North Golden Valley, MN 55427 763-546-1300 Lic# 1796 Stairwell LxWxH 9'6"x 6'8"x 17'6" ��. 371.75 SF Walls 63.33 SF Ceiling � 435.08 SF Walls&Ceiling 63.33 SF Floor 7.04 SY Flooring 10.17 LF Floor Pe�imeter 166.25 SF Long Wall 116.67 SF Short Wall 32.33 LF Ceil.Perimeter Missing Wall: 1- 9'6"X 9'10" Opens into Exterior Goes to Floor A'tissing Wall: 1- 6`8"X 9'3" Opens into Exterior Goes to Floor Missing Wall: 1- 6`X 6'6" Opens into Exterior Goes to Floor DESCRIPTION QNTy ItEMpVE REpI,pCE TOTAL 123. Seal then paint the walls and ceiiing(2 435.08 SF 0.00 0.57 248.00 coats) 124. R&R Laminate flr simulated wood- 13.00 LF 1.42 21.07 2g2_37 step charge (tread and ris�) �'"°O, 125. Stain&finish stair tread-per side- 39.00 LF 0.00 3.71 144.69 �.,,,,,I per LF 126. Finish balustrade- 1 caat urethane 18.0�LF 0.00 10.43 187.74 TotaLs: Stairwell ' . � • 872_80 Lower Level Family Room IxWxH 25`4"x 16'3"x 8' �.:. 544.39 SF Walls 411.67 SF Ceiling %' 956.06 SF Walls&Ceiling 4I 1.67 SF Floor 45.74 SY Flooring 70.17 LF Floor Perimeter 202.67 SF Long Wall 130.00 SF Short Wall 76.67 LF Ceil.Perimeter Missing Wall: 1- 6'6"X 6' Opens into Exterior Goes to Floor Missing Wall: 1- 6'6"X 8' Opens into Fxterior Goes to Floor/Celling Missing Wa11: 1- 8`2"X 3`8" Opens into Exterior Goes to nelther Ftoor/Ceiling DESCRIPTION QNTy REMpVE REpI,qCE TOTAL Ceiling VANCAMP-STRUCTURE 12/13/2010 Page: l4 ��/ %2'��.'� ��'�� �� Giertsen Company of Minnesota �� 8385 ]0�'Avenue North Golden Valley,MN 55427 763-546-1300 Lic# 1796 CONTINUED-Family Room � DESCRIPTION QNTY REMOVE REPLACE TOTAL 127. R&R 5/8"drywall_hung,taped,ceady 411.67 SF 0.36 1.35 703.95 fortexture 128. Seal floor or ceiling joist sys. (white 411.67 SF 0.00 0.74 304.64 pigmented shellac) 129. SeaUprime the ceiting-one coat 411.67 SF 0.00 0.32 131.73 130. Seal&paint acoustic ceiling(popcorn) 411.67 SF 0.00 0.75 308.75 texture - 131. R&R Recessed light fixture 12.00 EA BID TTEM Walls 132. R&R Cabinetry-full height unit 8.00 LF 7.72 264.11 2.174.64 133. Stain&finish full height cabinetry- 8.00 LF 0.00 49.58 396.64 inside and out 134. R&R 1/2"drywaii-hung,taped, 192.00 SF 0.36 1.40 337.92 floated,ready for paint � 135. R8cR Batt insulation-6" -R21 192.00 SF 0.31 0.76 205.44 136. R&R Visqueen vapor barrier 192.00 SF 0.07 0.25 61.44 137. Seal stud wall for odor oontrol(white 332.fi7 SF 0.00 0.55 182.97 pigmented shellac) • 138. R&R Trim board- 1°x 6"-installed 14.08 LF 0.35 � 5.09 76:16 (hardwood-oak or=) 139. R&R Trim board- 1"x 12^_installed 24.00 LF 0.42 9.37 234.96 (hardwood-oak or=) 140. R&R Trim board- 1"x 2"-installed 38.00 LF 0.30 2.39 102.22 (hardwood-oak or=) 141. R&R T&G paneling-double beaded 272.19 SF 0.33 4.43 1,295.62 vee(unfinished) 142. RBrR Chair raii-oversized-3 1/4" 70.17 LF 0.36 3.69 284.19 stain grade 143. Stain&finish chair rait 70.17 LF 0.00 0.94 65.96 144. Stain&finish panelirig 272.19 SF 0.00 1.02 277.63 145. Stair►&finish trim 76.00 LF 0.00 0.94 71.44 146. R&R Fireplace mantel-stain grade or 1.00 EA 45.91 1.176.71 1.222.62 hardwood-cus[om 147. Stain&finish wood fireplace mantel 24.00 LF 0.00 4.55 109.20 148. R&R 2"x 6"lumber(I BF per LF'� 64.00 LF 0.51 1.98 159.36 149. Carpenter-General Framer-per havr 8.00 HR 0.00 61.58 492.64 labor to repair framing 150. R&R 2"x 12"lumber(2 BF per LF) 12.00 LF 0.94 2.95 46.68 VANCAMP-STRUCTURE 12/13/2010 Page: 15 �D/ �2�� �� ��� Giertsen Company of Minnesota �"'1 8385 10�'Avenue North �,r� Golden Valley,MN 55427 763-546-1300 Lic# 1796 CONTINUED-Family Room DESCRIPTION QNTY REMOVE REPLACE TOTAL 151. R&R Stud wall-2x6-treated (per BFj 1.00 BF 0.18 1.95 2.13 framing repairs open pending demo and code enforcemen� 152. R&R Window blind-single cell-7.1 4.00 EA 8.63 111.37 480.00 to 14 SF 153. R&R Casing-2 1/4" 20.00 LF 0.43 1.56 39.80 154. Stain&finish casing 20.00 LF 0.00 0.94 18_80 155. Reglaze window, 10- 16 sf 1.00 EA 0.00 87.35 87.35 Floor 156. Remove Carpet 411.67 SF 0.23 0.00 94.68 157. Carpet 473.42 SF 0.00 2.98 1,41U.79 15%waste added for Carpet 158. R8cR Carpet pad 411.67 SF 0.10 0.61 292.29 159. SeaUprime part of the floor-one coat 102.92 SF 0.00 0.32 32.93 � 160. R&R Baseboard-3 1/4"hardwood 70.17 LF 0.39 3.4g 272,2g 161. Stain&finish baseboard 70.17 LF 0.00 0.95 66.66 162. Finish casing- 1 caat urethane 74.00 LF 0.00 0.63 46.62 163. Finish door/win trim&jamb- 1 coat � 4.00 EA • 0.00 14.41 � 57.64 ' urethane(per side) Totals: Family Room 12,148.75 I'O�'�'� LxWxH 8'2"x 3`10"x 8' .i, 192.00 SF Walls 31.31 SF Ceiling '� - 223.31 SF Walls&Ceiling 31.31 SF Floor � 3.48 SY Flooring 24.00 LF Floor Perimeter 65.33 SF Long Wall 30.67 SF Short Wall 24.00 LF Ceil.Perimeter ANCAMP-STRUCTURE 12/13/2010 Page: 16 �00/ �Y��� ����--1�� Giertsen Company of Minnesota {`� 8385 10�'Avenue North �-� Golden Valley,MN 55427 763-546-1300 Lic# 1796 CONTINUED-Lower hall Subroom 1: Under steps LxWad-I 9`2" x 6'6"x 4' '' 125.33 SF Walls 59.58 SF Ceiling "`� �'' 184.92 SF Walls&Ceilin g 59.58 SF Floor 6.62 SY Flooring 31.33 LF Floor Perimeter 36.67 SF Long Wall . 26.00 SF Short Wall 31.33 LF Ceil.Perimeter DESCRIPTION QNTy REMpVE REpI,qCE TOTAL Structure Be1ow Cetltn 164. Seal&paint acoustic ceiling(popcorn) 90.89 SF 0.00 0.75 68.17 textuie 165. Mask wall-plastic,paper,tape(per LF} 55.33 LF 0.00 0.85 47.03 166. Detach&Reset Light fixtore 1.00 EA 0.00 0.00 50.36 � Walls 167. SeaI then paint the walls(2 coats) 317.33 SF 0.00 0.57 180.88 Floor 168. Mask or cover per square foot 90.89 SF . 0.36 0.00 '32,72 169. Finish baseboacd- 1 coat u�ethane 55.33 LF 0.00 0.64 35.41 170. Finish casing- 1 coat urett,arie 51.00 LF 0.00 0.63 32.13 171. Finish door slab only- 1 coat urethane- 5.00 EA 0.00 20.99 104.95 ext(per side) 172. R&R Rigid foam insulation board-2" 32.00 SF 0.28 1.04 42.24 Totals: Lower hall 593.89 ���' . LxWxH 11'S"x 8'x 8' ,}, 310.67 SF Walls 91.33 SF Ceiling �'' ~ 402.00 SF Walls&Ceiling 91.33 SF Floor 10.15 SY Flooring 38.83 LF Floor Perimeter 91.33 SF Long Wall 64.00 SF Short Wall 38.83 LF Ceil.Perimeter DESCRIPTION QNTy REMpVE REpI,qCE TOTAL ANCAMP-STRUCTURE 12/13/2010 page; i7 �D/ �'�ic�� �� ���u� . • Giertsen Company of Minnesota �`� 8385 10�'Avenue North w Golden Valley,MN 55427 763-546-1300 Lic# 1796 CONTINUED-Laundry DESCRIPTION QNTY REMpVE REPLACE TOTAL Structure Below Ce�lm 173. Seal floor or ceiling joist sys. (white 91.33 SF 0.00 0.74 67.58 pigmented shellac) 174. Mask the floor per square foat-plastic 91.33 SF 0.00 0.17 15.53 and tape-4 mil 175. R&R Batt insulation-4" -R13 16.00 SF 0.30 0.51 12.96 Walls 176. Seal then paint the walls(2 coats) 310.67 SF 0.00 0.57 177.08 177. Painter-per hour 4.00 HR 0.00 45.99 183.96 addirional labor for masking and wot�Cing around mechanicals Floor 178. Epoxy finish-lwo coats over concrete 91.33 SF 0.00 3.13 285.86 floor � 179. Washing machine-Remove&reset 1.00 EA 0.00 29.20 29.20 180. Dryer-Remove&reset 1.00 EA 0.00 35.17 35.17 181. (Install)Cabinetry-upper(wall)units 5.00 LF 0.00 27.57 137.85 182. Shelving-Detach&reset - 30.00 LF • 0.00 ' 5.69 170.70 ' 183. Paint wood shelving, 12"-24"width- 30.00 LF 0.00 1.40 42.00 1 coat Tatals: Laundry 1.157.89 Total:Lower Level 13.900.53 Miscellaneaus DESCRIPTION QNTY REMpV.E REPLACE TOTAL 184. PERIvQTS AND FEES 1.00 EA BID TfEM 185. ELECTRICAL 1.00 EA OPEN TTEM 186. Dumpster load-Approx. 20 yards,4 1.00 EA 378.84 0.00 378.84 tons of debris Totals: Mi�ellaneous 378.84 ANCAMP-STRUCTURE 12/13/2010 Page: 18 �o/ ��r�« ���� �'�u-- Giertsen Company of Minnesota f "`1 8385 10'�Avenue North '�,._..� Golden Valley,MN 55427 763-546-1300 Lic# 1796 Garage LxWxH 22'x 22'x 8' _j 592.00 SF Walls 484.00 SF Ceiling - 1.076.00 SF Walls&Ceiling 484.00 SF Floor 53.78 SY Flooring 72.00 LF Floor Perimeter 176.00 SF Long Wall 176.00 SF Short Wall 88.00 LF Ceil.Perimeter MLuing Wall: 1- 16'X 7' Opens into Erterior Goes to Floor DESCRIPTION QNTY REMOVE REPLACE TOTAL �� 187. R&R 5/8"drywall-hung,taped,ready Z56.00 SF 0.36 1.35 437.76 fortexture 188. Seal floor or ceiling joist sys. (white 256.00 SF 0.00 0.74 189.44 pigmented shellac) 189. SeaUprime the ceiling-one caat (white 484.00 SF 0.00 0.35 169.40 � pigmented shellac) 190. Seallprime the wa1Ls-one coat 592.00 SF 0.00 0.32 189.44 191. Mask the floor per square foot-plastic 484.00 SF 0.00 0.17 82.28 and tape-4 mil 192. Acoustic ceiling(popcorn)textuc+e ' 484.00 SF • 0.00 0.74' 358.16 193. R&R Batt insulation- 10"-R30 256.00 SF 0.42 • 0.91 340.48 Totals: Garage 1,766.96 Fireplace DESCRIPTION QNTY REMOVE REPLACE TOTAL 194. MASONRY 1.00 EA 0.00 24,860.00 24,860.00 demo and rebuild of chimney assembly per bid from Paine Masonry. 195. R&R Fireplace face,naturai stone 128.00 SF BID TTEM Included in masonry bid Totals: Fireplace 24,860.00 ANCAMP-STRUCTURE IZ/1 2 3/ O10 Page: 19 s �D/ �2�� ���� ��`� Giertsen Company of Minnesota � 8385 IOm Avenue North Golden Valley,MN 55427 763-546-1300 Lic# 1796 R°°f LxWxH 43'x 43'x 1" 14.33 SF Walls 1.849.00 SF Ceiling 1.863.33 SF Walls&Ceiling 1,849.00 SF Floor 205.44 SY Flooring 172.00 LF Floor Perimeter 3.58 SF Long Wall 3.58 SF Short Wall 172.00 LF Ceil.Perimeter DESCRIPTION QNTY REMOVE REPLACE TOTAL 196. R&R Sheathing-plywood-5/8`CDX 320.00 SF 0.48 1.55 649.60 197. Remove 3 tab-25 yr.-composition 18.49 SQ 46.88 0.00 866.81 shingle roofing-incL felt 198. 3 tab-25 yr.-composition shingle 21.33 SQ 0.00 163.33 3,483.83 roofing-incl. felt 199. Seal/prime the ceiling-one coat 1.849.00 SF 0.00 0.32 591.68 200. Ice&water shield 516.00 SF 0.00 1.25 645.00 ZOI. R8cR Chimney flashing-average(32" 1.00 EA 16.08 205.01 221.09 � x 36") Z02. R&R Furnace vent-double wall,5" 1.00 LF 1.05 24.98 26.03 203. R&R F7ashing-pipe jack 3.00 EA 6.03 23.60 88.8g 204. Detach&Reset Roof vent-turtle type- ,4.00 EA 0,00 0.00 .129.84 Metal ' 205. R&R Fascia- 1"x 6"-#1 pine 43.00 LF 0.29 5.20 236.07 206. Prune&paint exterior fascia-wood. 43.00 LF 0.00 1.21 52.03 6"-8"wide 207. R&R 1"x 6"lumber,Select pine(.5 12.00 LF 0.81 4.04 58.20 BF per LF) sub fascia 208. R&R Drip edge 86.00 LF 0.28 1.52 154.80 209. Detach&Reset Gutter/downspout- 110.00 LF 0.00 0.00 306.90 aluminum-up to 5" 210. R&R Sof�it-box framing- 1' 12.00 LF 1.42 3.97 64.68 overhang 211. Prime&paint exterior soffit-wood 43.00 SF 0.00 1.30 55.90 212. R&R Continuous ridge vent-shingie- 43.00 LF Q.72 6.09 292.83 over style Totals: Roof 7,924.18 VANCAMP-STRUCTURE 12/13/2010 Page:20 ��� /����y�� �y������_ ♦ .' , Giertsen Company of Minnesota ('""'� 8385 10t6 Avenue North �.�.,r� Golden Valley,MN 55427 763-546-1300 Lic# 1796 Exterior DESCRIPTION QNTY REMQVE REPLACE TOTAL 213. R&R Siding-board&batten -cedar 400.00 SF 0.36 4.25 1.844.00 214. Seal&paint wood siding 3,176.00 SF 0.00 0.82 2,604.32 215. R&R Sheatt►ing-plywood- I/Z"CDX 400.00 SF 0.48 1.33 724.00 21fi. Remove Blown-in insulation- 1,232.00 SF 1.34 0.00 1,650.88 Machine removal 217. Blown-in insulation- 14"depth-R38 1.232.00 SF 0.00 0.87 1.071.84 218. Seal attic framing(white pigmented 3.332.00 SF 0.00 0.79 2,632.28 shellac) -up to 5/12 Totals: Fxterior 10.527.32 Line Item Totals:VANCAMP-STRUCTURE 79,031.17 � Grand Total Areas: ..;,. 5.429.12 SF Walls 4.100.33 SF Ceiling 9,529.45 SF Walls and Ceiling 4.095.06 SF Floor 455.01 SY Flooring 837.58 LF Floor P�imeter 1.587.75 SF Long Wall 1.084.08 SF Short Wall 904.04 LF Ceil.Perimeter 0.00 Floor Area 0.00 Total Area 0.00 Interior Wall Area 0.00 Exterior Wall Area 0.00 Extetior Perimeter of Walls 0.00 Surface Area 0.00 Number of Squares 0.00 Total Perimeter Length 0.00 Total Ridge Length 0.00 Total Hip Length VANCAMP-STRUCTURE 12/13/2010 Page:21 ��/ ���'-� ���. � � �7 DAJ TIME CITY OF ORONO CALLED IN P� � INSPECTION NOTI E SCHEDULED – '" �O=6� PERMIT NO.G1�0/�—DO���COMPLETED ADDRESS �� OWNER TEL PHONE N0. 7�3 Z38 �-�7 CONTRACTOR Gl1�.1�'.d_PiY`> �4� >: DESCRIPTION �h � � ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL O ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT J ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL � OWNERICONTRACTOH TO MEET YOU:_YES_NO � COMMENTS: � W a o ', ( � � �� �,.�� ,� (—C ' �. � 0 � W Q � � 1� S � t � �c � � � W / i � W � � O ORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE W ❑CORRECT WORK&PROCEED C ISSUE CERTIFICATE OF OCCUPANCY O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ pH0T0 TAKEN INSPECTOR WILL RETURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑ INSPECTION REQUIRED.CALLTO ARRANGE ACCESS. Cail for the next inspection 24 hours in advance. (J52� 24J-4600 Owner/Contractor on sit : Inspector. White Copyllnspector's File Canary CopylSite Notice �f� E TIME ✓ CITY OF ORONO CALLED IN �� � ===i�� INSPECTION�NnOTI E G� SCHEDULED � PERMIT NO.�l�/���� / COMPLETED ADDRESS OWNER � TELEP E NO.� ✓������ CONTRACTOR � >; DESCRIPTION �Z-�C—r/� � � ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL Q ❑ TREE REMOVAL Z �l INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL � OWNER/CONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: � W � � � O >. � O � W � Q � Z W � W � � d ORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE W ❑CORRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY � ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY � BEFORE COVERING PERMANENT ❑CORRECTUNSAFECONDITIONWITHIN HOURS. � pHOTOTAKEN INSPECTOR WlLL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-460� OwnerlContractor on s'te: /`--- Inspector. White Copyllnspector's File Canary CopylSite Notice � �� ��� D T TIME ✓ CITY OF ORONO �LLED IN Z� � INSPECTION NOTICE SCHEDULED � � PERMIT NO. �0//�0��9 COMPLETED ADDRESS � � OWNER TEL NE NO. g-� 7 CONTRACTOR ��� �" � DESCRIPTION � :��� �`' 7�3-�����' � ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILIING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORENVETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL p TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ S�TE INSPECTION Q ❑ FiADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS � ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT � ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP i ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL � OWNERICONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: � W a o �'ov er v-��,� .e1� F� re i��,4��� � l�k� A � -��1... �J J -�-�w, ° d, �27� — Co�-t. r3�S �-�t3 c� �.� �t-tJ 7 �9 t Q �� �' c.�� � �� — �v � �-�A c�r' z � �'��� : 5 ln fiZ� l,�9-�(. W � � I ��- l � t l tZI�.� � � � ❑WORK SATISFACTORY:PROCEED �F�2RO�JECT �PLETE W ❑CORRECT WORK 8 PROCEED �i3-F35UE CERTIFICATE OF OCCUPANCY 0 ❑CORRECT WORK,CALL FOR REINSPECTION �ORARY V BEFORE C01/ERING PERMANENT D CORRECT UNSAFE CONDITION WiTHIN HOURS. ❑pH0T0 TAKEN INSPECTOR WILL RETURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑INSPECTION REQUIRED.CALLTO ARRANGE ACCESS. Cail for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on site: Inspector. White Copyllnspector's File Canary CopylSite Notice