HomeMy WebLinkAbout2011-00009 - repair fire damage ,
CITY OF ORONO PERMIT NO.: 2011-00009
' 2750 KELLEY PARKWAY
ORONO, MN 55356- DATE ISSUED: OU12/2011
952 249-4600 FAX: 952 249-4616
ADDRESS : 601 MINNETONKA HGLD LA
PIN : 06-117-23-41-0091
LEGAL DESC : MINNETONKA SUMMIT PARK
: LOT 000 BLOCK 009
PERMIT TYPE : ADDITION/REMODEL/REPAIR
PROPERTY TYPE : RESIDENTIAL
CONSTRUCTION TYPE : ADDN/REMODEL/REPAIR
ACTIVITY : 434-RESIDENTIAL
VALUATION : $ 79,031.17
NOTE: SEPERATE PERMITS REQUIRED: PLUMBING,ELECTRICAL(STATE)
REPAIR FIRE DAMAGE
APPLICANT PERMIT FEE SCHEDULE 906.75
GIERTSEN COMPANY PLAN REVIEW 58939
8385 l OTH AVE N
GOLDEN VALLEY, MN 55427- STATE SURCHARGE(VALUATION) 39.52
(763)546-1300 TOTAL 1,535.66
Minnesota State License#: 1796
OWNER
VANCAMP,NATHAN&WENDY
601 MINNETONKA HGLD LA
LONG LAKE, MN 55356-
AGREEMENT AND SWORN STATEMENT
The work for which this permit is issued shall be performed according to
the approved plans and specifications,applicable City approvals,and the
State Building Code. This permit is for only the work described and does
not grant permission for additional or related work which requires separate
permits. All provisions of laws and ordinances governing this type of work
shall be compied with whether or not specified herein.This permit will
expire and become null and void if consuuction authorized is not
commenced within 180 days of the date of issuance,or if construction is
suspended for a period of 180 days at any time after work has commenced.
The applicant is responsible for assuring all required inspections are
requested in conform with the State Building Code.This permit may be
revoked at any ti for dUe cause.
�` l /Zl /f � l /aZ� /
pplican ee Signature Date I s d By igna ure Date
SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE.
• � � ��, � �b���
�� ,
�
--�,�' '�'
City of Orono
Building Permit Application
for New Structures or Additions
Mailing Address: Permit number: �D� - b���
Qv�,� PO Box 66
� � � Crystal Bay, MN 55323-0066 Date received: � -j- � �
��`��'�'�"' Received by:
a �7 :�` s. Street Address'
�' �� '� '�`�� ti 2750 Kelle Parkwa �
� p Y Y Plan review�e:
L9kESHOg� Orono, MN 55356 g��
- Total Fee:}�U j ,����j�
Main: 952-249-4600 Fax: 952-249-4616 www.ci.orono.mn.us /
This application form must be completed in full and all required information must be submitted.
Incomplete applications will be returned. (P/ease print)
GENERAL INFORMATION:
Job Site Address: Q/ � � % , ,� �� �C�v2 �-l�t lL—�
Will this be a Parade of Homes, Remodelers Showcase Ho e or other Display Home? ❑ Yes o
lf yes,a special event permit is required with Police Department and City Council approval 60 days prior to the event. Shuttle bus service w�ll be
required unless applicant demonstrates su/ficient on-site parking is available. Non-permitted events will not be allowed.
CONTRACTOR/APPLICANT INFORMATION:
Name: �i Pr t3tVl �'r�. Of /�.�n�
State License# � Expiration Date: '�--3/ -/Z.
Phone: �� �,.- ��[c (office) (o/Z- '7C?3- �S`3/ (cell)
Mailing Address: ��g�� /��� ��� ^/ City:� !rf �/a/fLh ZIP: 5,5's�Z7
Contact Person: gC V/J� �/f-p� Applicant is: oniractor' / Ho eowner (CircleOne)
Email and/or Fax: hc V��h r= Gi%G�'f3Cr� O . GD�
PROPERTY OWNER INFORMATION: /�
Name: ,/��Q �CI`; �h C..Q,rr�,p
Phone(day): 2/ - "8- z '
Address: p Cit : �/CG ZIP: ,s$",��
Email and/or Fax
ARCHITECT/ENGINEER INFORMATION:
Name:
Phone(day):
Address: Cit : ZIP:
Email and/or Fax:
PROJECT INFORMATION:
1.Type of Project 2. Proposed Use 3.Structure Type 4.Sewage Disposal&
Water Supply
❑ New Construction �]Single Family with �Residence
❑Addition attached garage ❑ Garage/Accessory Bldg. ❑ Public Sewer
❑Accessory Building ❑ Single Family with ❑ Deck
❑ Relocation I / detached garage ❑Office/Commercial ❑ Private Sewer
�Other:(specify) [�l+�l,G1 �G� ❑Multiple Family/Condo ❑Warehouse
❑ Public ❑ Storage ❑ Public Water
**Any earth movement may require ❑Commercial ❑ Other(specify)
MCWD review&permits. ❑ Industrial
❑ Private Well
Minnehaha Creek Watershed District(MCWD) ❑Other:(specify)
18202 Minnetonka Blvd
Deephaven,MN 55391
Phone: 952-471-0590
Fax: 952-471-0682
www.minnehahacreek.or
Estimated Construction Valuation(excluding land) $ �� `
Last Updated: 12/21/2010
- 19-
STRUCTURE INFORMATION:
1. Structure Dimensions 1. Structure Dimensions(continued) 2.Type of Construction
a. Length(ft.)= Number of bedrooms= ❑Wood/Frame
❑ Masonry
b.Width(ft.)= Number of garage stalls: ❑Metal
Attached= ❑ Pole Bidg.
Areas in square feet Detached= ❑ ICF
❑On-site Prefab
c. Basement= ❑Off-site Prefab
d. 151 Story = ❑Other(please specify):
e.2nd StOry=
f. YZ Story =
g.Total Area=
REQUIRED SUBMITTALS:
All of the information must be submitted in order for your application to be processed:
Not
Enclosed A licable
❑ ❑ Permit A lication
❑ ❑ Pro osed Buildin Plans
❑ ❑ MN State Ener Code Calculations and Mechanical Code Re uirements Form
❑ ❑ Surve meetin all re uirements
❑ ❑ Stormwater Pollution Prevention Plan
❑ ❑ Hardcover Calculation s
❑ ❑ Se tic S stem Site Evaluation Re ort
❑ ❑ Access Permit
❑ ❑ Wetland Buffer Im rovement Plan
❑ ❑ En ineered Plans for Retainin Walls 4 feet or above
❑ ❑ Plan Review Fee
• ❑ ❑ Other .
APPLICANT ACKNOWLEDGEMENT:
• Agrees to provide all information required or requested by the Building Department;
• Agrees to pay the City of Orono for engineering consultant review costs in excess of$500;
• Certifies that the information supplied is true and correct to the best of his/her knowledge. The applicant recognizes that they
are solely responsible for submitting a complete application being aware that upon failure to do so, the staff has no alternative
but to reject it until it is complete;
• Acknowledges the Escrow Agreement is completed and signed;
• Some or all of the information that you are asked to provide on this application is classified by State law as either private or
confidential. Private data is information which generally cannot be given to the public but can be given to the subject of the data.
Confidential data is information which generally cannot be given to either the public or the subject of the data. Our purpose and
intended use of this information is to annually update our records and records of other governmental agencies required by law.
If you refuse to supply the information,the application may not be issued.
�
ApplicanYs Signature: Date: /— �� < �
Last Updated: 12/21/2010
-20-
f
' `
Plan_Review Checkiist for New $tructures / Additions
Address/ PID/Legal: (�O 1 ►'Y\ 1 VJ�L"-TDNI�r4 I'��bl`l lhvv./JS C�V`1L�
Description of work: _ l—t i2,V (� Y�v,1,� e �2.�,�/��(Z
Septic review by: _ N/1/� Date Approved:
Zoning review by: Date Approved:
Building review by: Date Approved: / - i�- ?�O� �
Grading review by: Date Approved:
Zoning File#: Resolution#: Resolution Date:
Zonin District Fire De artment Post Office School ' trict
Zoning: Lot Area: SF/AC Width: D th:
Survey Submitt : � Yes � No Date of Survey:
Pro osed Setbacks.
Front(Lake) ar(Street) ( N S E W ) ( N S E W ) Other Buildings Wetfand
Side Side
Building Defined Height: Building Peak H ght:
FOR A BUILDING WITH A BASEMENT OR CRA L SPACE: F R A BUILDING ON A SLAB FOUNDATION:
START the distance between the b ement floor/ START the distance between the slab and the
WITH crawl space floor and the high st roof peak, WITH highest roof peak, the top of the cornice
the top of the cornice of a flat ro the dec of a flat roof, the deck line of a mansard
line of a mansard roof, or the uppe os roof, or the uppermost point on a round or
oint on a round or other arch-t e r other arch-t e roof
SUBTRACT half the distance between the high t SUBTRACT half the distance between the highest
window and highest roof peak o pitche window and highest roof peak of a
roof itched roof
SUBTRACT the distance between the sement floor/ ADD the distance between the slab and the
crawl space floor and t highest existing highest existing grade within the
grade within the fou tion or 10 feet, foundation
whichever is less. E ALS Defined buildin hei ht
EQUALS Defined buildin ei ht
Lot Coverage: SF %
Shoreland Dis ct MCWD Permit Received Avera e Lake ore Setback Bluff
� Yes � No 0 Yes � No 0 N/A p Yes 0 No � N/A � Yes 0 No
Permit Number: Setback:
Hard ver Zones Existin P�oposed Variance Re uired CUP Re uired
0-75' � Yes ❑ No Yes 0 No
75-250' Type�s�: Typ S�:
250-500'
500-1000'
REMARKS (in-house): (� C1-� lr
Updated: 07/01/2009
z:\forms�plan review checklist.docx
Fees to be Cha ed �!ES NO �
� � ��r�, rx a ��.1.�. ., x-,.k,,, , �
����'::�' ._.+...��:`� t !z'.:Y kW`_S � f . � .
� -.. .. - ,.. .. ..: . ._' ...,,. .. . .�_ . . .-
... .. . . ... .. _ . �..
Plan Review �/
i�ra`�e�a � .; _ g
. .. , .
Investi ation Fee '
��1�����'be���9►��'its _ -:�t�:. : ,
�
.. _ _ < :. _.
Sewer Connection
�a���ie���� ,� ' t. '�. � � -;x
:� �:
...._ .. .. . ,.. ,� �. _... ,
Park Fee
�te�r] ieiC�';i� �;�� ,x _ ,
,�
Other(s eci
�15�@���1[0'?B�S`�i@�'�a�� �� ""' ` -
_ a' - '�
. . .. . ,. . ... ._ ....
Calculated B :
UBC: Construction Type:
S uare Foota e $ er S uare Foota e
Basement x = $
1 Floor X = $
2" Fi00r X = $
Gara e X = $
Estimated Construction Value: $ '?�1, b31 . l�
Orono Inspections Reauired Work Reauirina Separate Permits Reauired State Permits
� Site Plumbing � Grading / Filling � Well
0 Hardcover Removal � Mechanical � Fire ,0'Electrical
� Footing � Septic ❑ Water Connection
0 Foundation Survey � Fireplace 0 Sewer Connection
J�'Framing 0 Masonry � Lawn Irrigation
�Insulation 0 Mfg. .
0 Wall Board 0 Other(specify)
0 As-Built Survey
�Final
G Other s eci
REMARKS (in-house):
Other Review: Reviewed by: Date Approved:
Access:Existing: 0 YES 0 NO New: 0 YES 0 NO
REMARKS (TO BE NOTED ON PERMIT AND INITIALLED BY PERSON PULLING PERM(T)
Updated: 07/01/2009
z:\forms�plan review checklist.docx
,
� .
Giertsen Company of Minnesota
F�� 8385 10"'Avenue North
��,� Golden Valley, MN 55427
763-546-1300
Lic# 1796
ClienC Nattian Vancamp Home: (218} 348-2309
Property: 601 Minnetonka Highlands Drive
Long Lake, MN 55356
Operator Info:
Operator_ OWNER
Estimator_ Leon Olmschenk Business: (612) 280-8355
Type of Es[imate: Fire ,
Date Entered: 12/13/20I0 Date Assigned:
Price LisC MNMN7X_NOV10
Labor Efficiency: Restoration/Service/Remodel
Estimate: VANCAMP-STRUCTURE ����
��q�
�r�
� _ - '
GIYY OF ORONO '
'�iJlLUI�VG PER I P N RE1l1EW
iNSPECTCFi �rNt..� ,_
DA?E���• �..01�_ PE:'r1+:�1T P10.
' . .�f�t'�iL'��L'L+tl.i':�.'!1'r�I� �i.ii
Ci AS�PR�.;',�:'�;';°i;, U�;;`:�:"^T:._�:,iS A,S��l�TED
�i ��.4T ��,:;�;•,-,,::;�-- `' � , - ,•, T
f1. �Le ��t .,ui:�)I
'f1E;: nrr,;��ar�,:, .`<..J 1:i�.,.. .�:'aW��l. hJl:,•U;K S�'..:!1)2 f�Jfl9
!1 fi'1+ .J�1 t' tti,:.�� ,.� <-.f ��':.%i...�d .:II(�Ilt� ?.fiC i:ui'I�i'y'ltJG�A.
+1BG:Yl�?Ci1C�Ti3 7i1U'..i�l',��I!ISI�1' `S��' ,.iti.i±ID�li'�:.�;: �'fF�l3 i9:'18'N.
KEEP THtS ri�����;��'i����C P11 A..,TI{hES
SPE�[AL 1�IIOTE
SEE ATT,clCF-�E� �HEET
FOR t��r sr�,w�cr.�c.r�.c�o�
COd?E ���°��"::;���:.'.�.�rtC=�T� �
........_.�..._._�,..._.�.._.
�D/ %2�,� �l� �� e�
, � �
Giertsen Company of Minnesota
8385 lOm Avenue North
��� Golden Valley,MN 55427
763-546-1300
Lic# 1796
VANCAMP-STRUCTURE
Upper Level
N�y IxWxH 12'S"x 9'9"x g�
322.17 SF Walls 121.06 SF Ceiling
- '�. 443.23 SF Walls&Ceiling 121.06 SF Floor
13.45 SY Flooring 39.33 LF Floor Perimeter
99.33 SF Long Wall 78.00 SF Short Wall
44.33 LF Ceil,Perimeter
Missing Wall: 1- 5'X 6'6" Opens into Excerior Goes to Floor
Subroom 1: Closet LxWxH 6'2"x 2'1"x 8'
i 132.00 SF Walls 12.85 SF Ceiling
"� - 144.85 SF Walls&Ceiling 12.85 SF Floor
1.43 SY Flooring 16.50 LF Floor Perimeter
'Y� 49.33 SF Long Wall 16.67 SF Short Wall
� 16.50 LF CeII.Perimeter
DESCRIPTION • QNTY REMOVE REPLACE ' TOTAL
Structure Below
Ceiling
1. SeaI&paint acoustic ceiling(popcom) 133.91 SF 0.00 0.75 100.43
texture
2. Mask wall-plastic,paper,tape(per LF) 60.83 LF 0.00 0.85 51.71
3. Detach&Reset Light fixture 1.00 EA 0.00 0.00 50.36
WalLs
4. Seal then paint the wa1Ls(2 coats) 454.I7 SF 0.00 0.57 258.88
5. R&R Window blind-double cell-7.1 to 3.00 EA 8.63 125.37 402.00
14 SF
Floor
6. Remove Carpet 133.91 SF 0.23 0.00 30.80
�• C�t 154.00 SF 0.00 2.98 458.92
15%waste added for Carpet
8. R&R Carpet pad 133.91 SF 0.10 0.61 95.08
Itel samples not sent in yet�
9. Finish baseboard- 1 coat urethane 55.83 LF 0.00 0.64 35.73
ANCAMP-SfRUCTURE 12/13/2010 Page:2
lP0/ /2��lca t�y�oL-
. +
Giertsen Company of Minnesota
8385 10'�Avenue North
�:;;,� Golden Valley,MN 55427
763-546-1300
Lic# 1796
CONTINUED-Nursey
DESCRIPTION QNTy REMOVE REPLACE TOTAL
10. Finish casing- 1 caat urethane 74.00 LF 0.00 0.63 46.62
11. Finish door slab only- 1 coat urethane- 2.00 EA 0.00 20.99 41.98
ext (per side)
12. Finish door/win him&jamb- 1 coat 2.00 EA 0.00 14.41 28.g2
urethane (per side)
Totals: Nursey 1,601.33
.
Master Bath LxWxH 6'x 5'2"x 8'
�s•-
154.75 SF Walls 31.00 SF Ceiling
� '
�� 185.75 SF Walls&Ceiling 31.00 SF Floor
3.44 SY Flooring 18.92 LF Floor Perimeter
� 48.00 SF Long Wall 41.33 SF Short Wall
22.33 LF Ceil.Perimeter
. Missing Wall: 1- 3'S"X 7' Opens Iinto Exterior Goes to Floor .
Subroom 1: Offset LxWacH 3'S"x 2'10"x?'
�;..
87.50 SF Walls 9.68 SF Ceiling
` 97.18 SF Walls&Ceiling 9.68 SF Floor
� 1.08 SY Flooring 12.50 LF Floor Perimeter
23.92 SF Long Wall I9.83 SF Shoct Wall
12.50 LF Ceil.Ferimeter
DESCRIPTION QNTY REMOVE REPLACE TOTAL
Structure Below
Ceil�n
13. Seal&paint acoustic ceiling(popcorn) 40.68 SF 0.00 0.75 30.51
texture
14. Mask waIl-plasCic,paper,tape(per I.F� 34.83 LF 0.00 0.85 29.61
15. Detach&Reset Light fixture 1.00 EA 0.00 0.00 50.36
Walls
16. Seal then paint the wa1Ls(Z coats) 242.25 SF O.UO 0.57 138.08
17. Detach&Reset Mirror-1/4"plate glass 12.00 SF 0.00 0.00 65.52
VANCAMP-STRUCTURE 12/13/ZO10 Page:3
�Q� i��� �y�-°
' � ___.__
Giertsen Company of Minnesota
� 8385 10'"Avenue North
s°' Golden Valley,MN 55427
763-546-1300
Lic# 1796
CONTINUED-Master Bath
DESCRIPTION QNTY REMOVE REPLACE TOTAL
Floor
18. Mask the floor pe�square foot-plastic 40.68 SF 0.00 0.17 6.92
and tape-4 mil
19. Finish baseboard- 1 coat urethane 31.42 LF 0.00 0.64 20.11
20. Finish casing- 1 caat urethane 74.00 LF 0.00 0.63 46.62
21. Finish door siab only- 1 coat urethane- Z_00 EA 0.00 20.99 41.98
ext(per side)
Totals: Master Bath 429.71
Master Bed LxWxH 12'10"x 11'8"x 8'
366.00 SF Walls 149.72 SF Ceiling
("",1 %'f ^ �• 515.72 SF Walis&CeiIing 149.72 SF Floor
�`������'� 16.64 SY Flooring 45.75 I.F Floor Perimeter
102.67 SF Long Wall 93.33 SF Shod Wall
45.75 LF Ceil.Pecitneter
Missing Wall: 1- 3'3"X 8' Opens into Exterior Goes to Floor/Ceiling
Subroam 1: Closet 1 LxWxH 4`4"x 2'2"x 8'
104.00 SF Walls 9.39 SF Ceiling
' '`- 113.39 SF Walls&Ceiling 9.39 SF Floor
1.04 SY Flooring 13.00 LF Floor Perimeter
34.67 SF Long WaII 17.33 SF Short Walt
13.00 LF Ceil.Perimeter
Subroom 2: Clacet 2 IxWxH 4'4"x 2'2"x 8'
� 104.00 SF Walls 9.39 SF Ceiling
� ~ �• 113.39 SF Walls&Ceiling 9.39 SF Floor
1.04 SY Flooring 13.00 LF Floor Perimeter
34.67 SF Long Wall 17.33 SF Short Wall
13.� LF CeiI.Perimeter
ANCAMP-STRUCTURE 12/13/2 1
0 0 Page:4
�D/ ����� t���-' .C��-z�
Giertsen Company of Minnesota
� 8385 10�'Avenue North
{ Golden Valley,MN 55427
`` 763-546-1300
Lic# I796
CONTINUED-Master Bed
Subroom 3: Offset LxWxH 3'3"x 2' 7"x 8'
�;._''_, , 93.33 SF Walls 8.40 SF Ceiling
� ' 101.73 SF Walls&Ceiling 8.40 SF Floor
0.93 SY Flooring 11.67 LF Floor P�imeter
26.00 SF Long Wall 20.67 SF Short Wall
11.67 LF Ceil.Perimeter
DESCRIPTION QNTy REMpVE REpI,qCE TOTAL
Structure Below
Ce�luig
ZZ. Seal&paint acoustic ceiling(popcocn) 176.90 SF 0.00 0.75 132.68
texture
23. Mask wall-plastic.paper.tape(per L� 83.42 LF 0.00 0.85 70.91
24. Detach&Reset Light fixture 1.00 EA 0.00 0.00 50.36
� Walls
25. Seal dien paint the walls (Z coats) 667.33 SF 0.00 0.57 380.38
26. R&R Window blind-double cell- 7.1 3.00 EA 8.63 125.37 402.00
to 14 SF
' Floor � - � •
27. Remove Carpet 176.90 SF 0.23 0.00 40.69
Z8' Ca`pet 203.43 SF 0.00 2.98 606.22
15%waste added for Carpet�
29. R&R Carpet pad 176.90 SF 0.10 0.61 125.60
Itel samples not sent in yet.
30. Finish baseboard- 1 coat urethane 83.42 LF 0.00 0.64 53.39
31. Finish casing- 1 coat urethane 86.00 I.F 0.00 0.63 54.18
32. Finish door slab only- 1 coat ured�ane- 4.00 EA 0.00 20.99 83.96
ext(per side}
33. Finish doodwin trim&jamb- 1 coat 4.00 EA 0.00 14.41 57.64
urethane (per side)
Totals: Master Bed 2,058.01
ANCAMP-STR
UCTURE 12/13/2010 Page:5
�D� r��Q ��y��
Giertsen Company of Minnesota
8385 ]0'�Avenue North
�.� Golden Valley,MN 55427
763-546-1300
Lic# 1796
Middle Bedroom LxWxH 11'10"x 9`2"x 8'
j_ 336.00 SF Walls 108.47 SF Ceiling
� � � � 444.47 SF Walls&Ceiling 108.47 SF Floor
12.05 SY Flooring 42.00 LF Floor Perimeter
94.67 SF Long Wall 73.33 SF Short Wall
42.Q0 LF Ceil.Pecimeter �
Subroom I: Closet 1 LxWxH 4'S"x 2'2"x 8'
105.33 SF Walls 9.57 SF Ceiling
114.90 SF Walls&Ceiling 9.57 SF Floor
1.06 SY Flooring 13.17 LF Floor Perimeter
35.33 SF Long Wall 17.33 SF Short Wall
13.17 LF Ceil.Perimeter
� Subroom 2: Closet 2 LxWxH 4'S"x 2'2"x 8'
105.33 SF Walls 9.57 SF Ceiling
%'� 114.90 SF Walls&Ceiling 9.57 SF Floor
1.06 SY Flooring 13.17 LF Floor Peri�eter
• . � 35.33 SF Long Wall • � 17.33 SF Short Wall
13.I7 LF Ceil_Perimeter
DESCRIPTION QNTY REMOVE REPLACE TOTAL
Stru�Below
Ceiling
34. Seal&paint acoustic ceiling(popcorn) 127.61 SF 0.00 0.75 95.71
texture
35. Maslc wall-piastic,paper,tape(per LF) 68.33 LF 0.00 0.85 58.08
36. Detach&Reset Light fixture 1.00 EA 0.00 0.00 50.36
Walls
37. Seal then paint the wa1Ls(2 coats) 546.67 SF 0.00 0.57 311.60
38. R&R Window blind-double cell-7_1 Z.00 EA 8.63 1Z5.37 268.00
to 14 SF
Floor
39. Remove Cacpet 1Z7.61 SF 0.23 0.00 29.35
40. Carpet 146.75 SF 0.00 2.98 437.32
15 %waste added for Carpe�
ANCAMP-STRUCTURE 12/13/2010 Page:6
�D/ �Za�-`'�. � ���--
��
Giertsen Company of Minnesota
� 8385 10`h Avenue North
Golden Valley, MN 55427
763-546-1300
Lic# 1796
CONTINUED-MIddle Bedroom
DESCRIPTION QNTY REMOVE REPLACE TOTAL
41. R&R Carpet pad 127.61 SF 0.10 0.61 90.60
Itel samples not sent in ye�
42. Finish baseboard- (coat urethane 68.33 LF 0.00 0.64 43.73
43. Finish casing- 1 coat urethane 74.00 LF 0.00 0.63 46.62
44. Finish door slab only- 1 coat urethane- 2.00 EA 0.00_ Z0.99 41.98
ext(per side)
45. Finish door/win trim&jamb- 1 coat 2.00 EA 0.00 14.41 28.g2
urethane (per side)
Totals: Middle Bedroom 1,502.17
Bath up LxWxH 7'3"x 5'10"x 8'
� 169.33 SF Walls 42.29 SF Ceiling
=' 211.63 SF Walls&Ceilin
S 42.29 SF Floor
4.70 SY Flooring 21.17 LF Floor P�imeter
. 58.00 SF Long Wall 46.67 SF Shoct Wall
' Z1.17 LF Ceil.Perimeter '
Mlssing Wall: 1- 5'X 8' Openc into Exterior Goes to Floor/Ceiling
Sub�om 1: Offset LxWxH 5'x 3'x 8'
• 128.00 SF Walls 15.00 SF Ceiling
�l �• 143.00 SF Walls&CeiIin
'' S 15.00 SF Floor
1.67 SY Flooring 16.00 LF Flnor Perimeter
40.00 SF Long Wall 24.00 SF Short Wall
16.00 LF Ceil.Perimeter
DESCRIPTZON QNTY REMpVE REpLACE TOTAL
Struct�u e Below
Ce�l�ng
46. Seal&paint acoustic ceiling(popcorn) 57.29 SF 0.00 0.75 42.97
texture
47. Mask wall-plastic,paper,tape(per L.F) 37.17 LF 0.00 0.85 31.59
48. Detach&Reset Light fixture 2.Q0 EA Q.00 0.00 100.72
ANCAMP-STRUCTURE 12l13/2010 Page:7
�p�/ iG��cc� ,��� ���
Giertsen Company of Minnesota
8385 10`�Avenue North
t�� Golden Valley,MN 55427
763-546-1300
Lic# 1796
CONTINUED-Bath up '
DESCRIPTION QNTY REMOVE REPLACE TOTAL
Walls
49. Seal then paint the walls(2 caats) 297.33 SF 0.00 0.57 169.48
50. Detach&Reset Mirror- 1/4"plate glass 12.00 SF 0.00 O.QO 65.52
Floor
51. Mask the floor per square foot-plastic 57.Z9 SF 0.00 0.17 9.7q
and tape-4 mil
52. Finish baseboard- 1 coat urethane 12.00 LF 0.00 0.64 7.6g
53. Finish casing- 1 coat urethane 74.00 LF 0.00 0.63 46.62
54. Finish door slab only-1 coat urethane- 2.00 EA 0.00 20.99 41.98
ext (per side)
TotaLs: Bath up 516.30
� �up I.xWxH15'7"x2'9"xg'
� 271.33 SF Walls 42.85 SF Ceiling
%"' ''� . • 314.19 SF Walls&Ceiling , 42.85 SF Floor
4.76 SY Ftooring 33.92 LF Flooc Ferimeter
124.67 SF Long WaII 22.00 SF Shoct Wall
33.92 LF CeiL Perimeter
Missing Wall: 1- 2'9"X 8' Openc into Exterior Goes to Floor/Ceiling
Subroom 1: Closet 1 IxWsH 2'8"x 2'x 8'
74.67 SF Walls 5.33 SF Ceiling
� '
� . 80.00 SF Walls&Ceiling 5.33 SF Floor
0.59 SY Flooring 9.33 LF Floor-Perimeter
21.33 SF Long Wall 16.00 SF Short Wall
9.33 LF Ceil.Perimeter
ANCAMP-STRUCTURE
12/13f2010 Page:8
Ca0/ �%��1� ��9� ��`I�
Giertsen Company of Minnesota
;`� 8385 ]0'"Avenue North
` Golden Valley,MN 55427
763-546-1300
Lic# 1796
CONTINUED-Hall up
Subrnom 2: Closet 2 LxWxH 2'3"x 2'x 8'
> 68.00 SF Walls 4.50 SF Ceiling
` ^ "' 72.50 SF Walls&Ceiling 4.50 SF Floor
0.50 SY Flooring 8.50 I.F Floor Perimeter
18.00 SF Long Wall 16.00 SF Short Wall
8.50 LF Ceil.Perimeter
DESCRIPTION QNTY REMpVE REpLACE TOTAL
Structure Below
Ce�7ing
55. Seal&paint acoustic ceiling(popcorn) 52.69 SF 0.00 0.75 39.52
texture
56. Mask wall-plastic,paper,tape(per LF) 5I.75 LF 0.00 0.85 43.99
57. Detach&Reset Light fixttu�e 1.00 EA 0.00 0.00 50.36
Q58. R&R Smoke detector 1.00 EA BID ITEM
59. R&R Reducer strip-for wood flooring 3.00 LF 0.33 5.04 16.11
WaILs
60. Seal then paint the walls (2 cx�ts) • 414.00 SF 0.00 . 0.57 ' 235.98
Floor
61. Remove Carpet 52.69 SF 0.23 0.00 12.12
62. Carpet 60.59 SF 0.00 2.98 180.56
15%waste added for Ca�pet
63. R&R Cacpet pad 52.69 SF 0.10 0.61 37.41
Itel samples not sent in yeG
64. Finish baseboard- 1 coat urethane 51.75 LF 0.00 0.64 33.12
65. Finish casing- 1 coat urethane 204.00 LF 0.00 0.63 128.52
66. Finish door slab only- 1 coat urethane- 12.00 EA 0.00 20.99 251.88
ext(per side)
TotaLs: Hall up 1,029.57
AIVCAMP-STRUCTURE
12/13/2010 Page:9
lvD/ ��q�Q° ����
Giertsen Company of Minnesota
; 8385 10�'Avenue North
`--_.-� Golden Valley,MN 55427
763-546-(300
Lic# 1796
Dining Room Formula Sloped Ceiling I1'S"x 11'1"x 9'10"
141.00 SF Walls 128.16 SF Ceiling
269.16 SF Walls&Ceiling 126.53 SF Ftoor
��•. 14.06 SY Flooring 16.50 LF Floor Perimeter
22.79 LF Ceil.Perimeter
Missing Wall: 1- 11'1"X 9'10" Opens into Exterior Goes to Floor/Ceiling
M��g W�: 1- 6'X 6'6" Opens into Fxterior Goes to Floor
Missing Wall: 1- 11'S"X 9'10" Opens into F.rterior Goes to Floor/Celling
DESCR�PTION QNTy REMpVE REpL,pCE TOTAL
�
67. RBcR 5/8"drywall-hung,taped, 128.16 SF 0.36 1.54 243_51
floated,ready for paint
68. Seal floor or ceiling joist•sys. (white 128.16 SF 0.00 0.74 94.84
pigmented shellac)
� 69. R&R Batt insulation-S"-R25 128.16 SF 0.39 0.86 160.20
70. R&R Visqueen vapor barrier . 128.16 SF 0.07 0.25 41.01
71. Detach&Reset Chandelier 1.00 EA BID TTEM
. 72. Seal then paint the ceiling(Z coats) . 128.1�SF 0.00 037 73.05
Walls
73. Seal then paint the walls(2 coats) 141.00 SF ' 0.00 0.57 80.37
Floor
74. R&R Engineered wood flooring I26.53 SF 2.01 8.46 1,324.77
75. SeaUprime the floor-one coat 126.53 SF 0.00 0.32 40.49
76. R&R Baseboard-3 1/4'hardwood 16.50 LF 0.39 3.49 64.03
77. Stain&finish baseboard 16.50 LF 0.00 0.95 15.68
78. R&R Base shce 16.50 LF 0.14 1.14 21.12
79. Stain&finish base shce or quarter 16.50 LF 0.00 0.77 12.71
round
80. Finish baseboard- 1 coat urethane 10.50 LF 0.00 0.64 s.y2
81. Finish casing- 1 �at urethane 20.00 LF 0.00 0.63 12.60
Totals: Dining Room 2.191.10
ANCAMP-STRtJCTURE
12/13/2010 Page: 10
l�a/ ���� ��`� L��
Giertsen Company of Minnesota
8385 10`�Avenue North
i'� Golden Valley,MN 55427
�" 763-546-1300
Lic# 1796
Kitchen Formula Sloped Ceiling 11'S"x 10'6"x 9' 10"
192.58 SF Walls 121.41 SF Ceiling
313.99 SF Walls&Ceiling 119.88 SF Floor
--------------' 13.32 SY Floori
� 32.42 LF Floor Perimeter
32.71 LF Ceil.Perimeter
Missing Wall: 1- 11'S"X 9`10" Opens into Exterior Goes to Floor/Ceiling
Missing Wall: 2- 10'6"X 2' Openc into Exterior Goes to neither Floor/Ceiling
Missing Wall: 2- 11'X 2' Opens into Fxterior Goes to neither Floor/CeiL'ng
DESCRIPTION QNTy REMpVE REpLACE TOTAL
��
82. Seal then paint the ceiling(2 coats) 121_41 SF 0.00 0.57 69.20
83. Recessed light fixture-Detach&reset 4.00 EA 0.00 4.02 16.08
trim only
84. Detach&Reset Light 6xture 2.pp EA BID ITEM
(� Walls
�..J
85. Seal then paint the walls(2 coats) 192.58 SF 0.00 0.57 109.77
Floor
86.�R&R Engineered wood flooring ' 119.88 SF . Z.O1 8.46 � 1.255.14 .
87. R&R Baseboard-3 1/4"hardwood 32.42 LF 0.39 3.49 125.79
88. Stain&finish baseboard 32.42 LF 0.00 0.95 30.80
89. R&R Base shoe 32.42 LF 0.14 1.14 41.50
90. Stain&fmish base shce or quarter 32.42 LF 0.00 0.77 24.96
round
91. Refrig_water line-Disconnect& 1.00 EA 0.00 61.44 61.44
reconnect-with repaits
92. Refrigerator-Remove&reset 1.00 EA 0.00 35.04 ' 35.04
93. Dishwasher-Detact�&mset 1.00 EA 0.00 204.71 204.71
94. Finish baseboard- 1 coat urethane 10.00 LF 0.00 0.64 6.40
95. Finish casing- I coat urethane 12.00 LF 0.00 0.63 7.56
96. Finish doorfwin trim&jamb- 1 coat 1.00 EA 0.00 14.41 14.41
urethane(per side)
97. Tile/stone sealer 119.88 SF 0.00 0.90 107.89
Totais: Kitchen
2,110.69
ANCAMP-STRUCTURE 12/1
3/ZO10 Page: ll
��� ��� ���
Giertsen Company of Minnesota
� 8385 10'"Avenue North
f Golden Valiey,MN 55427
763-546-1300
Lic# 1796
Living Room Formula Slopecl Ceiling 16'6"x 14'6"x 9' 10"
106.09 SF Walls 241.15 SF Ceiling
347.25 SF Walls&Ceiting 239.25 SF Flaor
--------------' 26.58 SY Floorin
b 19.58 LF Floor Perimeter
26.31 LF Ceil.Perimeter
Missing Wa1[: 1- 8'3"X 4'3" Opens into Exterior Goes to neither FloorlCei7ing
M➢ssing Wall: 1- 6'6"X 9' Opens into Exterior Goes to Floor
Missing Wall: 1- 11'1"X 9'10" Opens into F.xterior Gocs to FIoor/Ceiling
Missing Wall: 1- 13'6"X 9'10" Opens into Fxterior Goes to Floor/Ceiling
1�'Iissing Wall: 1- 4'3"X 9' 10" Opens into Exterior Goes to Floor/Ceiling
Missing Wall: 1- 7' 1"X 9'1Q" Opens into Facterior Goes to Floor/Ceiling
Subroom 1: Offset Formula Sloped Cejling?'1"x 4'3"x 9'10"
� 217.22 SF Walls 30.31 SF Ceiling
247.53 SF Walls&Ceiling 30.10 SF Floor
---------------' 3.34 SY Flooring 22.67 LF Floor Perimeter
22.73 LF Ceil.Perimeter
DESCRIPTION . QNTY REMOVE REPLACE TOTAL
Ceiling
98. R&R 5/8"drywall-hung,taped, 271.47 SF U_36 1.54 515.79
floated,ready for paint
99. Seal floor or ceiling joist sys. (white 271.47 SF 0.00 0.74 200.89
pigmented shellac)
100. R&R Visqueen vapor barrier 271.47 SF 0.07 0.25 86.87
101. Seal then paint the ceiling(Z coats) 271.47 SF 0.00 0.57 154.74
102. Detach&Reset Recessed light fixture 6A0 EA BID ITEM
Fixture replacement open pending cleaning and inspection
Walls
103. R&R 2'x 6" lumber(1 BF per LF� 64.00 LF 0.51 1.98 159.36
104. Carpenter-Genecai Framer-per hour 8.00 HR 0.00 61.58 492.64
labor to repair framir►g
105. R&R 2"x 12"lumber(Z BF per LF) IZ.00 LF 0.94 2.95 46.68
106. R&R Stud wall-2x6-treated (per BF, 1.00 BF 0.18 1.95 2.13
ANCAMP-STRUCTURE LZ/13/2010 Page: 12
l�0/ %�a�� ����% �`�
Giertsen Company of Minnesota
� 8385 10�'Avenue North
' ...- Golden Valley,MN 55427
763-546-1300
Lic# 1796
CONTIlVUED-LIving Room
DESCRIPTION QNTY REMpVE REpLACE TOTAL
framing repairs open pending demo and code enforcement
107. R&R 1/2"drywall-hung,taped, 128.00 SF 0.36 1.40 225,2g
floated,ready for paint
108. Seal stud wall for odor control(white 141.00 SF 0.00 0.55 77.55
pigmented shellac)
109. Seal then paint the walls(2 coats) 323.31 SF 0.00 0.57 184.29
110. R&R Window blind-single cell-7.1 2_00 EA 8.63 111.37 240.00
to 14 SF
111. R&R Firepiace mar�kel_stain grade or 1.00 EA 45.91 1,176.71 1,222.62
hardwood-custom
112. Stain&finish wood fireplace mantel 24.00 LF 0.00 4.55 109.20
Floor
113. R&R Engineered wood flooring 269.35 SF Z.O1 8.46 2,820.09
114. Seal/prime part of the floor-one coat 134.68 SF 0.00 0.32 43.10
�"""� 115. R&R Baseboard-31/4"hardwood 42.25 LF 0.39 3.49 163.93
�J 116. Stain&finish baseboard 42.25 LF 0.00 0.95 40.14
117. R&R Base shce 42.25 LF 0.14 1.14 54.09
118. Stain&finish base shce or quarter 42_25 LF 0.00 0.77 - 32.53
round
119. R&R Underlayment-3/4"BC 134.68 SF 1.08 2.02 417.50
P1Y�'�
120. Finish baseboard- 1 coat urethane 42.25 LF . 0.00 0.64 27.04
121. Finish casing- 1 coat uretttane 26.00 LF 0.00 0.63 16.38
122. Finish door/win trim&jamb- 1 coat 2.00 EA 0.00 14.41 28,g2
urethane(per side)
Totals: Living Room 7.361.66
Total:Upper Level 18,800.54
ANCAMP-STRUCTLTRE
12/13/2010 Page: 13
�Q/ ,;d�l� r�L�L�Z�J
Giertsen Company of Minnesota
n-�.�''� 8385 10`�Avenue North
Golden Valley, MN 55427
763-546-1300
Lic# 1796
Stairwell LxWxH 9'6"x 6'8"x 17'6"
��. 371.75 SF Walls 63.33 SF Ceiling
� 435.08 SF Walls&Ceiling 63.33 SF Floor
7.04 SY Flooring 10.17 LF Floor Pe�imeter
166.25 SF Long Wall 116.67 SF Short Wall
32.33 LF Ceil.Perimeter
Missing Wall: 1- 9'6"X 9'10" Opens into Exterior Goes to Floor
A'tissing Wall: 1- 6`8"X 9'3" Opens into Exterior Goes to Floor
Missing Wall: 1- 6`X 6'6" Opens into Exterior Goes to Floor
DESCRIPTION QNTy ItEMpVE REpI,pCE TOTAL
123. Seal then paint the walls and ceiiing(2 435.08 SF 0.00 0.57 248.00
coats)
124. R&R Laminate flr simulated wood- 13.00 LF 1.42 21.07 2g2_37
step charge (tread and ris�)
�'"°O, 125. Stain&finish stair tread-per side- 39.00 LF 0.00 3.71 144.69
�.,,,,,I per LF
126. Finish balustrade- 1 caat urethane 18.0�LF 0.00 10.43 187.74
TotaLs: Stairwell ' . � • 872_80
Lower Level
Family Room IxWxH 25`4"x 16'3"x 8'
�.:. 544.39 SF Walls 411.67 SF Ceiling
%' 956.06 SF Walls&Ceiling 4I 1.67 SF Floor
45.74 SY Flooring 70.17 LF Floor Perimeter
202.67 SF Long Wall 130.00 SF Short Wall
76.67 LF Ceil.Perimeter
Missing Wall: 1- 6'6"X 6' Opens into Exterior Goes to Floor
Missing Wall: 1- 6'6"X 8' Opens into Fxterior Goes to Floor/Celling
Missing Wa11: 1- 8`2"X 3`8" Opens into Exterior Goes to nelther Ftoor/Ceiling
DESCRIPTION QNTy REMpVE REpI,qCE TOTAL
Ceiling
VANCAMP-STRUCTURE
12/13/2010 Page: l4
��/ %2'��.'� ��'�� ��
Giertsen Company of Minnesota
�� 8385 ]0�'Avenue North
Golden Valley,MN 55427
763-546-1300
Lic# 1796
CONTINUED-Family Room
� DESCRIPTION QNTY REMOVE REPLACE TOTAL
127. R&R 5/8"drywall_hung,taped,ceady 411.67 SF 0.36 1.35 703.95
fortexture
128. Seal floor or ceiling joist sys. (white 411.67 SF 0.00 0.74 304.64
pigmented shellac)
129. SeaUprime the ceiting-one coat 411.67 SF 0.00 0.32 131.73
130. Seal&paint acoustic ceiling(popcorn) 411.67 SF 0.00 0.75 308.75
texture -
131. R&R Recessed light fixture 12.00 EA BID TTEM
Walls
132. R&R Cabinetry-full height unit 8.00 LF 7.72 264.11 2.174.64
133. Stain&finish full height cabinetry- 8.00 LF 0.00 49.58 396.64
inside and out
134. R&R 1/2"drywaii-hung,taped, 192.00 SF 0.36 1.40 337.92
floated,ready for paint
� 135. R8cR Batt insulation-6" -R21 192.00 SF 0.31 0.76 205.44
136. R&R Visqueen vapor barrier 192.00 SF 0.07 0.25 61.44
137. Seal stud wall for odor oontrol(white 332.fi7 SF 0.00 0.55 182.97
pigmented shellac)
• 138. R&R Trim board- 1°x 6"-installed 14.08 LF 0.35 � 5.09 76:16
(hardwood-oak or=)
139. R&R Trim board- 1"x 12^_installed 24.00 LF 0.42 9.37 234.96
(hardwood-oak or=)
140. R&R Trim board- 1"x 2"-installed 38.00 LF 0.30 2.39 102.22
(hardwood-oak or=)
141. R&R T&G paneling-double beaded 272.19 SF 0.33 4.43 1,295.62
vee(unfinished)
142. RBrR Chair raii-oversized-3 1/4" 70.17 LF 0.36 3.69 284.19
stain grade
143. Stain&finish chair rait 70.17 LF 0.00 0.94 65.96
144. Stain&finish panelirig 272.19 SF 0.00 1.02 277.63
145. Stair►&finish trim 76.00 LF 0.00 0.94 71.44
146. R&R Fireplace mantel-stain grade or 1.00 EA 45.91 1.176.71 1.222.62
hardwood-cus[om
147. Stain&finish wood fireplace mantel 24.00 LF 0.00 4.55 109.20
148. R&R 2"x 6"lumber(I BF per LF'� 64.00 LF 0.51 1.98 159.36
149. Carpenter-General Framer-per havr 8.00 HR 0.00 61.58 492.64
labor to repair framing
150. R&R 2"x 12"lumber(2 BF per LF) 12.00 LF 0.94 2.95 46.68
VANCAMP-STRUCTURE 12/13/2010 Page: 15
�D/ �2�� �� ���
Giertsen Company of Minnesota
�"'1 8385 10�'Avenue North
�,r� Golden Valley,MN 55427
763-546-1300
Lic# 1796
CONTINUED-Family Room
DESCRIPTION QNTY REMOVE REPLACE TOTAL
151. R&R Stud wall-2x6-treated (per BFj 1.00 BF 0.18 1.95 2.13
framing repairs open pending demo and code enforcemen�
152. R&R Window blind-single cell-7.1 4.00 EA 8.63 111.37 480.00
to 14 SF
153. R&R Casing-2 1/4" 20.00 LF 0.43 1.56 39.80
154. Stain&finish casing 20.00 LF 0.00 0.94 18_80
155. Reglaze window, 10- 16 sf 1.00 EA 0.00 87.35 87.35
Floor
156. Remove Carpet 411.67 SF 0.23 0.00 94.68
157. Carpet 473.42 SF 0.00 2.98 1,41U.79
15%waste added for Carpet
158. R8cR Carpet pad 411.67 SF 0.10 0.61 292.29
159. SeaUprime part of the floor-one coat 102.92 SF 0.00 0.32 32.93
� 160. R&R Baseboard-3 1/4"hardwood 70.17 LF 0.39 3.4g 272,2g
161. Stain&finish baseboard 70.17 LF 0.00 0.95 66.66
162. Finish casing- 1 caat urethane 74.00 LF 0.00 0.63 46.62
163. Finish door/win trim&jamb- 1 coat � 4.00 EA • 0.00 14.41 � 57.64 '
urethane(per side)
Totals: Family Room 12,148.75
I'O�'�'� LxWxH 8'2"x 3`10"x 8'
.i, 192.00 SF Walls 31.31 SF Ceiling
'� - 223.31 SF Walls&Ceiling 31.31 SF Floor
� 3.48 SY Flooring 24.00 LF Floor Perimeter
65.33 SF Long Wall 30.67 SF Short Wall
24.00 LF Ceil.Perimeter
ANCAMP-STRUCTURE
12/13/2010 Page: 16
�00/ �Y��� ����--1��
Giertsen Company of Minnesota
{`� 8385 10�'Avenue North
�-� Golden Valley,MN 55427
763-546-1300
Lic# 1796
CONTINUED-Lower hall
Subroom 1: Under steps LxWad-I 9`2" x 6'6"x 4'
'' 125.33 SF Walls 59.58 SF Ceiling
"`� �'' 184.92 SF Walls&Ceilin
g 59.58 SF Floor
6.62 SY Flooring 31.33 LF Floor Perimeter
36.67 SF Long Wall . 26.00 SF Short Wall
31.33 LF Ceil.Perimeter
DESCRIPTION QNTy REMpVE REpI,qCE TOTAL
Structure Be1ow
Cetltn
164. Seal&paint acoustic ceiling(popcorn) 90.89 SF 0.00 0.75 68.17
textuie
165. Mask wall-plastic,paper,tape(per LF} 55.33 LF 0.00 0.85 47.03
166. Detach&Reset Light fixtore 1.00 EA 0.00 0.00 50.36
� Walls
167. SeaI then paint the walls(2 coats) 317.33 SF 0.00 0.57 180.88
Floor
168. Mask or cover per square foot 90.89 SF . 0.36 0.00 '32,72
169. Finish baseboacd- 1 coat u�ethane 55.33 LF 0.00 0.64 35.41
170. Finish casing- 1 coat urett,arie 51.00 LF 0.00 0.63 32.13
171. Finish door slab only- 1 coat urethane- 5.00 EA 0.00 20.99 104.95
ext(per side)
172. R&R Rigid foam insulation board-2" 32.00 SF 0.28 1.04 42.24
Totals: Lower hall
593.89
���' . LxWxH 11'S"x 8'x 8'
,}, 310.67 SF Walls 91.33 SF Ceiling
�'' ~ 402.00 SF Walls&Ceiling 91.33 SF Floor
10.15 SY Flooring 38.83 LF Floor Perimeter
91.33 SF Long Wall 64.00 SF Short Wall
38.83 LF Ceil.Perimeter
DESCRIPTION QNTy REMpVE REpI,qCE TOTAL
ANCAMP-STRUCTURE
12/13/2010 page; i7
�D/ �'�ic�� �� ���u�
. •
Giertsen Company of Minnesota
�`� 8385 10�'Avenue North
w Golden Valley,MN 55427
763-546-1300
Lic# 1796
CONTINUED-Laundry
DESCRIPTION QNTY REMpVE REPLACE TOTAL
Structure Below
Ce�lm
173. Seal floor or ceiling joist sys. (white 91.33 SF 0.00 0.74 67.58
pigmented shellac)
174. Mask the floor per square foat-plastic 91.33 SF 0.00 0.17 15.53
and tape-4 mil
175. R&R Batt insulation-4" -R13 16.00 SF 0.30 0.51 12.96
Walls
176. Seal then paint the walls(2 coats) 310.67 SF 0.00 0.57 177.08
177. Painter-per hour 4.00 HR 0.00 45.99 183.96
addirional labor for masking and wot�Cing around mechanicals
Floor
178. Epoxy finish-lwo coats over concrete 91.33 SF 0.00 3.13 285.86
floor
� 179. Washing machine-Remove&reset 1.00 EA 0.00 29.20 29.20
180. Dryer-Remove&reset 1.00 EA 0.00 35.17 35.17
181. (Install)Cabinetry-upper(wall)units 5.00 LF 0.00 27.57 137.85
182. Shelving-Detach&reset - 30.00 LF • 0.00 ' 5.69 170.70 '
183. Paint wood shelving, 12"-24"width- 30.00 LF 0.00 1.40 42.00
1 coat
Tatals: Laundry 1.157.89
Total:Lower Level 13.900.53
Miscellaneaus
DESCRIPTION QNTY REMpV.E REPLACE TOTAL
184. PERIvQTS AND FEES 1.00 EA BID TfEM
185. ELECTRICAL 1.00 EA OPEN TTEM
186. Dumpster load-Approx. 20 yards,4 1.00 EA 378.84 0.00 378.84
tons of debris
Totals: Mi�ellaneous 378.84
ANCAMP-STRUCTURE
12/13/2010 Page: 18
�o/ ��r�« ���� �'�u--
Giertsen Company of Minnesota
f "`1 8385 10'�Avenue North
'�,._..� Golden Valley,MN 55427
763-546-1300
Lic# 1796
Garage LxWxH 22'x 22'x 8'
_j 592.00 SF Walls 484.00 SF Ceiling
- 1.076.00 SF Walls&Ceiling 484.00 SF Floor
53.78 SY Flooring 72.00 LF Floor Perimeter
176.00 SF Long Wall 176.00 SF Short Wall
88.00 LF Ceil.Perimeter
MLuing Wall: 1- 16'X 7' Opens into Erterior Goes to Floor
DESCRIPTION QNTY REMOVE REPLACE TOTAL
��
187. R&R 5/8"drywall-hung,taped,ready Z56.00 SF 0.36 1.35 437.76
fortexture
188. Seal floor or ceiling joist sys. (white 256.00 SF 0.00 0.74 189.44
pigmented shellac)
189. SeaUprime the ceiling-one caat (white 484.00 SF 0.00 0.35 169.40
� pigmented shellac)
190. Seallprime the wa1Ls-one coat 592.00 SF 0.00 0.32 189.44
191. Mask the floor per square foot-plastic 484.00 SF 0.00 0.17 82.28
and tape-4 mil
192. Acoustic ceiling(popcorn)textuc+e ' 484.00 SF • 0.00 0.74' 358.16
193. R&R Batt insulation- 10"-R30 256.00 SF 0.42 • 0.91 340.48
Totals: Garage
1,766.96
Fireplace
DESCRIPTION QNTY REMOVE REPLACE TOTAL
194. MASONRY 1.00 EA 0.00 24,860.00 24,860.00
demo and rebuild of chimney assembly per bid from Paine Masonry.
195. R&R Fireplace face,naturai stone 128.00 SF BID TTEM
Included in masonry bid
Totals: Fireplace 24,860.00
ANCAMP-STRUCTURE IZ/1 2
3/ O10 Page: 19
s
�D/ �2�� ���� ��`�
Giertsen Company of Minnesota
� 8385 IOm Avenue North
Golden Valley,MN 55427
763-546-1300
Lic# 1796
R°°f LxWxH 43'x 43'x 1"
14.33 SF Walls 1.849.00 SF Ceiling
1.863.33 SF Walls&Ceiling 1,849.00 SF Floor
205.44 SY Flooring 172.00 LF Floor Perimeter
3.58 SF Long Wall 3.58 SF Short Wall
172.00 LF Ceil.Perimeter
DESCRIPTION QNTY REMOVE REPLACE TOTAL
196. R&R Sheathing-plywood-5/8`CDX 320.00 SF 0.48 1.55 649.60
197. Remove 3 tab-25 yr.-composition 18.49 SQ 46.88 0.00 866.81
shingle roofing-incL felt
198. 3 tab-25 yr.-composition shingle 21.33 SQ 0.00 163.33 3,483.83
roofing-incl. felt
199. Seal/prime the ceiling-one coat 1.849.00 SF 0.00 0.32 591.68
200. Ice&water shield 516.00 SF 0.00 1.25 645.00
ZOI. R8cR Chimney flashing-average(32" 1.00 EA 16.08 205.01 221.09
� x 36")
Z02. R&R Furnace vent-double wall,5" 1.00 LF 1.05 24.98 26.03
203. R&R F7ashing-pipe jack 3.00 EA 6.03 23.60 88.8g
204. Detach&Reset Roof vent-turtle type- ,4.00 EA 0,00 0.00 .129.84
Metal '
205. R&R Fascia- 1"x 6"-#1 pine 43.00 LF 0.29 5.20 236.07
206. Prune&paint exterior fascia-wood. 43.00 LF 0.00 1.21 52.03
6"-8"wide
207. R&R 1"x 6"lumber,Select pine(.5 12.00 LF 0.81 4.04 58.20
BF per LF)
sub fascia
208. R&R Drip edge 86.00 LF 0.28 1.52 154.80
209. Detach&Reset Gutter/downspout- 110.00 LF 0.00 0.00 306.90
aluminum-up to 5"
210. R&R Sof�it-box framing- 1' 12.00 LF 1.42 3.97 64.68
overhang
211. Prime&paint exterior soffit-wood 43.00 SF 0.00 1.30 55.90
212. R&R Continuous ridge vent-shingie- 43.00 LF Q.72 6.09 292.83
over style
Totals: Roof 7,924.18
VANCAMP-STRUCTURE
12/13/2010 Page:20
��� /����y�� �y������_
♦
.' ,
Giertsen Company of Minnesota
('""'� 8385 10t6 Avenue North
�.�.,r� Golden Valley,MN 55427
763-546-1300
Lic# 1796
Exterior
DESCRIPTION QNTY REMQVE REPLACE TOTAL
213. R&R Siding-board&batten -cedar 400.00 SF 0.36 4.25 1.844.00
214. Seal&paint wood siding 3,176.00 SF 0.00 0.82 2,604.32
215. R&R Sheatt►ing-plywood- I/Z"CDX 400.00 SF 0.48 1.33 724.00
21fi. Remove Blown-in insulation- 1,232.00 SF 1.34 0.00 1,650.88
Machine removal
217. Blown-in insulation- 14"depth-R38 1.232.00 SF 0.00 0.87 1.071.84
218. Seal attic framing(white pigmented 3.332.00 SF 0.00 0.79 2,632.28
shellac) -up to 5/12
Totals: Fxterior 10.527.32
Line Item Totals:VANCAMP-STRUCTURE 79,031.17
� Grand Total Areas:
..;,.
5.429.12 SF Walls 4.100.33 SF Ceiling 9,529.45 SF Walls and Ceiling
4.095.06 SF Floor 455.01 SY Flooring 837.58 LF Floor P�imeter
1.587.75 SF Long Wall 1.084.08 SF Short Wall 904.04 LF Ceil.Perimeter
0.00 Floor Area 0.00 Total Area 0.00 Interior Wall Area
0.00 Exterior Wall Area 0.00 Extetior Perimeter of
Walls
0.00 Surface Area 0.00 Number of Squares 0.00 Total Perimeter Length
0.00 Total Ridge Length 0.00 Total Hip Length
VANCAMP-STRUCTURE 12/13/2010 Page:21
��/ ���'-� ���.
� �
�7 DAJ TIME
CITY OF ORONO CALLED IN P� �
INSPECTION NOTI E SCHEDULED – '" �O=6�
PERMIT NO.G1�0/�—DO���COMPLETED
ADDRESS ��
OWNER TEL PHONE N0. 7�3 Z38 �-�7
CONTRACTOR Gl1�.1�'.d_PiY`> �4�
>: DESCRIPTION �h
�
� ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING
Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS
y ❑ FRAMING ❑ MECHANICAL FINAL
O ❑ TREE REMOVAL
Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
� ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
J ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
_ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL
� OWNERICONTRACTOH TO MEET YOU:_YES_NO
� COMMENTS:
�
W
a
o ', ( � � �� �,.�� ,� (—C '
�.
�
0
�
W
Q � � 1� S � t � �c � �
�
W / i
�
W
�
�
O
ORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
W ❑CORRECT WORK&PROCEED C ISSUE CERTIFICATE OF OCCUPANCY
O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ pH0T0 TAKEN
INSPECTOR WILL RETURN ❑CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
❑ INSPECTION REQUIRED.CALLTO ARRANGE ACCESS.
Cail for the next inspection 24 hours in advance. (J52� 24J-4600
Owner/Contractor on sit :
Inspector.
White Copyllnspector's File Canary CopylSite Notice
�f� E TIME ✓
CITY OF ORONO CALLED IN �� � ===i��
INSPECTION�NnOTI E G� SCHEDULED �
PERMIT NO.�l�/���� / COMPLETED
ADDRESS
OWNER � TELEP E NO.� ✓������
CONTRACTOR �
>; DESCRIPTION �Z-�C—r/�
�
� ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING
Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS
y ❑ FRAMING ❑ MECHANICAL FINAL
Q ❑ TREE REMOVAL
Z �l INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
� ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
� ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
_ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL
� OWNER/CONTRACTOR TO MEET YOU:_YES_NO
� COMMENTS:
�
W
�
�
�
O
>.
�
O
�
W
�
Q
�
Z
W
�
W
�
�
d
ORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
W ❑CORRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
� ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
� BEFORE COVERING
PERMANENT
❑CORRECTUNSAFECONDITIONWITHIN HOURS. � pHOTOTAKEN
INSPECTOR WlLL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (952) 249-460�
OwnerlContractor on s'te:
/`---
Inspector.
White Copyllnspector's File Canary CopylSite Notice
� �� ��� D T TIME ✓
CITY OF ORONO �LLED IN Z� �
INSPECTION NOTICE SCHEDULED � �
PERMIT NO. �0//�0��9 COMPLETED
ADDRESS � �
OWNER TEL NE NO. g-� 7
CONTRACTOR ��� �"
� DESCRIPTION �
:��� �`' 7�3-�����'
� ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILIING
Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORENVETLANDS
y ❑ FRAMING ❑ MECHANICAL FINAL p TREE REMOVAL
Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ S�TE INSPECTION
Q ❑ FiADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
� ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
� ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
i ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL
� OWNERICONTRACTOR TO MEET YOU:_YES_NO
� COMMENTS:
�
W
a
o �'ov er v-��,� .e1� F� re i��,4���
� l�k� A � -��1... �J J -�-�w,
° d, �27� — Co�-t. r3�S �-�t3 c� �.� �t-tJ 7 �9 t
Q �� �' c.�� � �� — �v � �-�A c�r'
z � �'��� : 5 ln fiZ� l,�9-�(.
W
�
� I ��- l � t l tZI�.� �
�
� ❑WORK SATISFACTORY:PROCEED �F�2RO�JECT �PLETE
W ❑CORRECT WORK 8 PROCEED �i3-F35UE CERTIFICATE OF OCCUPANCY
0 ❑CORRECT WORK,CALL FOR REINSPECTION �ORARY
V BEFORE C01/ERING PERMANENT
D CORRECT UNSAFE CONDITION WiTHIN HOURS. ❑pH0T0 TAKEN
INSPECTOR WILL RETURN ❑CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
❑INSPECTION REQUIRED.CALLTO ARRANGE ACCESS.
Cail for the next inspection 24 hours in advance. (952) 249-4600
Owner/Contractor on site:
Inspector.
White Copyllnspector's File Canary CopylSite Notice