From: Miriam Eason <meason@minnehahacreek.org>
Sent: Monday, November 09, 2015 3:14 PM
To: Melanie Curtis; Christine Mattson
Cc: jhsmith3102@aol.com
Subject: Amendment to MCWD permit 15-459 (1100 Miliston Rd, Orono) approved
Good afternoon,
Barbara Burwell has MCWD permission to add 137 linear feet of rip-rap to the shoreline of 1100 Millston Road in the
City of Orono.This work is added as an amendment to MCWD permit 15-459 and it is in conformance with MCWD rules.
Thanks,
MIRIAM EASON
District Representative
Minnehaha Creek Watershed District
952-641-4586
http://minnehahacreek.or�/
���
MINNEMANA CRE6K
WATER$NED Di$FR9GF
1
1
f
�' //`,,�- �%:-, ' �;� f /',.�/
Melanie Curtis ' -
From: Dale [dalegus@earthlink.net]
Sent: Thursday, December 04, 2014 11:00 AM
To: Melanie Curtis
Subject: Re: Burwell
Attachments: Burwell Shore Plan 12414.pdf; Burwell Stairs 12-4-14.pdf; Zoning Permit Application 2014
complete.pdf
Melanie,
I hope you had a good Thanksgiving and you are ready for a great Christmas.
Well,there are always surprises. Just last week Barbra approved the contract for making the stairs out of wood instead of steel. The
plan is very much like the one you have seen before,but we have changed the landings a little and jogged the separate sections of
steps to snake between the trees so as to not harm them. The four landings are only 27 square feet,and they jog just one foot at a
time.
Attached are pdfs of the closeup of the steps,and a copy of the shareline plan along with a partially complete application. What else
would you like me to submit?
I thought you might want my contact information because the first approval had that on it. I could do it for Concept Landscape if that
would be better.
Dale
On Nov 6,2014,at 12:11 PM, Melanie Curtis wrote:
> I know how you feel. I am so exhausted when I leave here everyday that I completely zone out for my entire drive home...
>
>You just need a zoning permit(administrative&it's attached),plans and if you can provide planting/screening detail that would be
great.
>
>
>
>Melanie Curtis 952.249.4627 mcurtis�,ci.orono.mn.us
>
>
>-----Original Message-----
>From: Dale [mailto:dalegi$(a�earthlink.net]
> Sent: Thursday,November 06,2014 11:43 AM
>To: Melanie Curtis
> Subject: Re: Burwell
>
>Melanie,
>
> Sorry I missed that. It does not surprise me that I missed your response,yesterday was a blur until I finished up about l Opm.
>
>OK,with the two options left, do we need to submit any additional detail beside the detail of the step construction? Do you want a
planting plan to show how we screen them?
>
>Do we need to go back to the Planning Commission, or the Board,or is it just staff approval? There is consideration of building it
this winter.
>
1
� >Dale
>
>
>On Nov 6,2014,at 10:58 AM, Melanie Curtis wrote:
>
»I did respond yesterday. I'll resend when I return to my desk.
»
»Sent from my iPhone.
»
»On Nov 6,2014, at 10:53,Dale<dalegus(a�earthlink.net>wrote:
»
»Melanie,
»
»Any time to look at the Burwell steps. If you have questions, I am in my office.
»
»
»Thanks,
»
»Dale
>
><Zoning Permit Application 2014.pdfl
2
Christine Mattson
From: Melanie Curtis
Sent: Thursday, October 24, 2013 8:39 AM
To: Tom Potter
Cc: Christine Mattson
Subject: FW: 20131024 1100 Millston Rd -#13-01076
Tom
Please see below. We can get this permit issued pretty quickly but we need the survey to be updated...
Melanie Curtis � 952.249.4627 I� mcurtis@ci.orono.mn.us
From: Jesse Struve
Sent: Thursday, October 24, 2013 8:34 AM
To: Melanie Curtis
Cc: Christine Mattson
Subject: 20131024 1100 Millston Rd - #13-01076
Melanie,
I reviewed the permit application for the detached garage at 1100 Millston Rd but it is incomplete. The application has
what appears to be a blown up version of an old survey with the location of the proposed garage hand drawn on.
Unfortunately this needs to be on a signed survey.
Jesse Struve, PE
Director of Public Works/City Engineer
City of Orono
(952) 249-4661 - Direct
(952) 249-4616- Fax
www.ci.orono.mn.us
1
Jesse Struve
From: Jesse Struve
Sent: Thursday, October 24, 2013 8:34 AM
To: Melanie Curtis
Cc: Christine Mattson
Subject: 20131024 1100 Millston Rd -#13-01076
Melanie,
I reviewed the permit application for the detached garage at 1100 Millston Rd but it is incomplete. The application has
what appears to be a blown up version of an old survey with the location of the proposed garage hand drawn on.
Unfortunately this needs to be on a signed survey.
Jesse Struve, PE
Director of Public Works/City Engineer
City of Orono
(952) 249-4661 - Direct
(952) 249-4616- Fax
www.ci.orono.mn.us
1
City of Orono
RoNo Hardcover Calculation Worksheet
1 � Property Address: � � 00 (����.LS`�-on �oo� , Q rono , m�
F L
���'fSH��� Prepared by: �ho�� �o.��r Date:
Stormwater Quality Overiay District Tier: (Circie one) -Tier 1 Tier 2 Tier 3 Tier 4 Tier 5
Step 2: PROPOSED HARDCOVER
In the following table, identify all items of proposed hardcover on the property, keyed by letter to Certificate
of Survey (survey must accompany this form). Include all existing hardcover items that are intended to
remain, as well as a(I proposed hardcover items that will be added. Use as many lines as necessary to
accurately depict proposed hardcover status of the property. For Tier 1 properties, identify any features by
letter which are split at the 75' setback line and calculate hardcover square footage separately for each
portion.
Key to Hardcover Item (Describe) Length x Width Total
Surve (Square Feet)
Exam le) (Gara e) t24'x 30') (720 S.F.)
A e � � S.F.
B o mo v S.F.
C ' 'o �t•'i c. o..1�.5 S.F.
p o � � S.F.
E `� rii t 1 �`l S.F.
F ' S.F.
G o S.F.
H a'_i S.F.
I o,.. S.F.
J ri g 5 S.F.
K ive ° S.F.
L S.F.
M ro S.F.
N ' S.F.
O S.F.
P S.F.
Q S.F.
R S.F.
S S.F.
T S.F_
U S.F.
V S.F.
W S.F.
X S.F.
Y S.F.
Z S.F.
1) Total Pro osed Hardcover S.F.
Excludable Hardcover See Ci Code Sec 78-1684 :
S.F.
S.F.
S.F.
S.F.
S.F.
2 Total Excludable Hardcover S.F.
3 Net Pro osed Hardcover Subtract line 2 firom line 1 S.F.
4 Total Lot Area S.F.
Proposed Hardco�2r Percentage [(3)�-(4)] ' a, %
Packet Last Updated: 04/19/2013
Page 15 of 23
City of Orono
�.on�o �arc�cover Calcuiation UUorkshe�#
,y `� Property Address: ` l O O /n i�,..�.S�or1 �oa.d ' � hort0 , � l�l
�qkESHO�E� Pre ared b : Date:
A Y ��-Lo r,nc�.S �o`�l�r
Stormwaier Quality Overlay District Tier: (Circie one Tier 1 Tier 2 TieT 3 Tier 4 Tier 5
Step 1: EXISTiiVG HARDCQVER
In the fo{lowing table identifiy all items of existing hardcover on the property, keyed by letter to Certificate of
Survey (survey must accompany this form). Use as many lines as necessary to accurately depict existing
hardcover status of the property. For Tier 1 properties, identify any features by letter which are split at the
75' setback line and calculate hardcover square footage separately for each portion.
Key to Hardcover Item (Describe) Length x Width Total
Surve Square Feet
(Exampl I {Garage) I {24'x 30') (720 S.F.)
e
A ' S.F.
B r� a. �05 ' an S.F.
C o S.F.
D �.n. ' SF
E � SF
F o
S.F.
G ar.'►� C m S.F_
N �
p S.F.
� F I S.F_
J } 1
K r � '� S.F.
� � p S.F.
9 s.F.
M
S.F.
N
S.F.
O
S.F.
P S.F.
a S.F.
R S.F.
S
S.F.
T
S.F.
U
S.F.
V
S.F.
W
S.F.
X
S.F.
Y
S.F.
Z
S.F.
1 Total Existin Hardcover
a 3 s.F_
Excludable Hardcover See Ci Code Sec 78-1684 :
S.F.
S.F.
S_F.
" S.F.
S.F.
2 Total Excfudable Nardcover g �
3 Net Existin Hardcover Subtract line 2 from line 1 S.F.
4 Total Lot Area
a. �., S.F.
Existing Hardcover Percentage j(3)=(4)] � � %
(Proposed Hardcover next page)
Packet Last Updated: 04/19/2013
Page 14 of 23
Christine Mattson
From: Willie Gibbs
Sent: Friday, August 30, 2013 11:37 AM
To: Christine Mattson
Subject: RE: 1100 Millston Road
It's done
From: Christine Mattson
Sent: Friday, August 30, 2013 10:19 AM
To: Barb Silus; Willie Gibbs
Cc: Melanie Curtis
Subject: 1100 Millston Road
As I am preparing an escrow refund for the Burwell's at 1100 Millston Road, I don't see a final inspection for the cabana
#2011-00983. Will you let me know if it was completed and not entered into PW or if it's an inspection that needs to be
scheduled?
Thank you.
Christine Mattson
Planning Assistant
City of Orono
2750 Kelly Parkway Orono MN 55356 (physical addressJ
PO Box 66 Crystal Bay MN 55323-0066 (mailing addressJ
� 952.249.4620 � 952.249.4616
� cmattson@ci.orono.mn.us � www.ci.orono.mn.us
Summer Office Hours: (Monday, May 20 through Friday,Auqust 30,2013)
Monday-Thursday: 7:30 am to 5 pm
Friday: 7:30 am to 11:30 am
OUR OFFICE WILL BE CLOSED: Monday, September 2, 2013
1
g-��O
C ITY OF ORONO
� � Street Address: I Mailing Address: I Telephone(952)249-4600
��, `'� 2750 Kelley Parkway P.O.Box 66 Fax (952)249-4616
l G Orono,MN 55356 Crystal Bay,MN 55323 www.ci.orono.mn.us
qkFSH���
January 8, 2013
Tom Potter
Tom Potter Construction
6531 Devonshire Drive
Chanhassen, MN 55317
RE: Building Permits 2011-00412 & 2011-00983
1100 Millston Road
Tom,
While closing out permit project files, I noticed that we have not received a final inspection on
the cabana or an as-built survey for the projects at 1100 Millston Road. A requirement of the
permits for the pool and cabana was submittal of an as-built survey. We still hold an escrow of
$5,000 pertaining to the projects. In order to begin the process for the release of the escrow, an
as-built survey must be submitted. Final grading and landscaping must be done prior to
submittal of an as-built survey. Attached is a copy of our survey requirements. Upon our
engineers review and approval of the as-built survey, we can then process the escrow refund.
I can be reached at cmattsonCa�ci.orono.mn.us or at 952-249-4620 if you have any questions.
Sincerely,
CITY OF ORONO
1�
'stine Mattson
Planning Assistant
c Rodney Burwell; 7901 Xerxes Ave S; Bloomington, MN 55431
Attachment: Survey Requirements
� o�
O , O CITY of ORONO
��,y_,, ,, Municipal Offices
�•�, ��;��������4 � Street Address: Mailing Address:
`�+�� �.� ,�, � � ,�, 2750 Kelley Parkway P.O. Box 66
,�f �1,���`l����'����`�'',�G Orono, MN 55356 Crystal Bay,MN 55323-0066
�kES�H�4
25 October 2011
Rodney Burwell
1100 Mil�ston Road
Wayzata, MN 55391
As you may remember because a bathroom was part of the plan for your pool cabana, the City required
your signature on a restrictive covenant in order to issue the permit. On the day you stopped in to sign
the covenant your wife, Barbara, was not available to sign. You and I discussed this and decided to
remove Barbara's name from the signature block. I thought this would be an acceptable solution.
Today I received a notification from our attorney that both you and Barbara must sign the agreement in
order to properly record the document at Hennepin County.
In order to resolve this issue we have drafted a new document for signature. It would be very helpful if
you and Barbara would sign the enclosed, revised, agreement before a notary and submit it to me at
your convenience. I apologize for the misunderstanding and any inconvenience this may have caused.
Additionally, the City currently holds an escrow for the pool, cabana and septic system projects in the
amount of $5000. As soon as the projects have been completed, including completion of the final site
grading and vegetation establishment, an as-built survey should be submitted for our review. Once
verification of compliance with the approved ptans is completed via the as-built survey the escrow can
be released. Please have your contractor contact me regarding as-built survey requirements so this can
be taken care of in a timely manner.
Please feel free to contact me at mcurtis@ci.orono.mn.us or at 952.249.4627 if you have any questions.
Sincerely,
CITY OF ORONO
�
Melanie Curtis
Planning and Zoning Coordinator
Enclosures: Revised declaration of restrictive covenant
c: Kevin Keenan—via email
Telephone (952)249-4600 • Fax(952) 249-4616
www.ci.orono.mn.us
���'��'!s�� '�''� ���`
.,`� � �t< <.
� '� 2335 Highway 36 W
St. Paul, MN 55113
Tel 651-636�600
Fax 651-636-1311
www.bonestroo.com
September 22, 2011 �Bonestroo
Melanie Curtis
Planning and Zoning Coordinator
City of Orono
Post Office Box 66
Crystal Bay, MN 55323
Re: 1100 Millston Road
File No. 000139-11000-2
File No. 2011-00983
Dear Melanie:
We have reviewed the plan for a proposed structure at 1100 Millston Road. The plans are dated
8-25-11. We have the following comments with regards to engineering matters:
• The site and grading plan is acceptable from an engineering standpoint.
• This project will disturb more than 100 CY of material. Sediment and erosion control
information meeting the requirements of Orono's City Code 79-7(c)(2) must be
submitted. The minimum $2000 sediment and erosion control financial security should
be required of the owner for this permit.
If you have any questions, please call me at (651) 604-4894 or send an email to
darren.amundsenCc�bonestroo.com.
Sincerely,
BONESTR00
�_;�=-Z-_=G�____,
Darren Amundsen
Cc: Chris Mattson