Dear Mr.Oman:
On Apri126,200�,I inspected the ponding area at 2655 Mapleridge Lane and found it to be in
conformance with the Stormwater Management Plans dated January 5,200�.
Variations from the plans include the following:
• The constructed pond does not contain wet detention. Wet detention was not criteria set
by the city and has no impact on rate control.
• The tile lines containing roof drainage were reduced from 6 inch to 4 inch as required,but
not outlet into the upper pond. The tile lines outlet into the crushed rock near the lower
dry pond. The roof drainage area is actually minimal with a ioo year flood of only o.5 cfs,
therefore,the asbuilt conditions are acceptable in regards to stormwater management.
However,the tile lines should be monitored for plugging as they begin to collect gutter
debris. If plugging becomes a problem,outletting the 6 inch tile lines into the upper dry
pond should resolve any issues.
Variations from the plans were allowed,provided necessary storage volumes were met. I believe
the dry detention ponds as constructed meet the criteria as set forth by the city.
If you wish to discuss this further,please contact me.
Sincerely,
KALLIO ENGINEERING INC.
�c�.�.t ���2-��'"
Curt Kallio,P.E.
Fax: 952-400-8492 � www.kallicenqineerinp.com � Phone: 952-448-5725
Page 2 of 3
Sent: Friday, April 27, 2007 8:40 AM
To: Kellogg, Tom P
Subject: RE: 2655 Mapleridge
Tom, We would like Lance to inspect the site. Thank you, Lyle oman
From: Kellogg, Tom P [mailto:Tom.Kellogg@bonestroo.com]
Sent: Friday, April 27, 2007 7:53 AM
To: Hoff, Lance R.
Cc: Lyle Oman; Bruce Vang
Subject: FW: 2655 Mapleridge
Lance,
This letter pertains to the pond that was constructed on this site. You previously reviewed their
plans. Lyle and Bruce may want you to inspect this site to see if you concur with Kallio.
Lyle and Bruce,
Let Lance know if you want him to inspect this site or if you are satisfied with Kallio's letter.
Thanks,
To m
Tom Kellogg, PE
Associate
Tel 651-604-4863
Cell 651-775-5637
tom.kellogg@bonestroo.com
� Ba�estroo
From: Curt Kallio [mailto:curtkallio@kallioengineering.com]
Sent: Friday, April 27, 2007 6:18 AM
To: Steve Longman
Cc: Kellogg, Tom P
Subject: 2655 Mapleridge
Steve,
Attached is my letter accepting the pond at 2666 Mapleridge. I don't have Lyle's email, so I am assuming you will
get him a copy of the letter.
Please call with questions.
Thanks,
Curt Kallio
Kallio Engineering Inc.
10775 Poppitz Lane
Chaska, MN 55318
Ph: 952-448-5725
Fax: 952-400-8492
5/15/2007
Page 1 of 3
Lyle Oman
From: Hoff, Lance R. [Lance.Hoff@bonestroo.com]
Sent: Monday, May 14, 2007 4:37 PM
To: Lyle Oman
Cc: Bruce Vang; Kellogg, Tom P
Subject: RE: 2655 Mapleridge
Lyle,
At the contractor's request, I made another site visit to the 2665 Maple Ridge site to inspect the
pond. They have addressed my comments and satisfied the City rate control requirement. They
added a 4" draintile outlet to the upper cell, then bermed and riprapped over it to create the
designed overflow. They also exposed the new and existing outlet pipes and cleaned out the new
P�Pe•
They should be good-to-go from a drainage perspective.
Let me know if you have any questions! �
Lance Hoff, PE
Tel 651-604-4755
Cetl 612-802-9486
lance.hoff@ bonestroo.com
�gonestroo
From: Kellogg,Tom P •
Sent: Friday, April 27, 2007 8:44 AM
To: Hoff, Lance R.
Cc: 'loman@ci.orono.mn.us'; 'bvang@ci.orono.mn.us'
Subject: FW: 2655 Mapleridge
Lance,
As noted in Lyle's email please schedule a time to visit the site to inspect the ponding
improvements. You should let Lyle or Bruce know when you plan to visit the site and then provide
them with a written memo summarizing your findings.
Thanks,
Tom
Tom Kellogg, PE
Associate
Tel 651-604-4863
Cell 651-775-5637