My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: pond
Orono
>
Property Files
>
Street Address
>
M
>
Mapleridge Lane
>
2665 Mapleridge Lane - 21-117-23-21-0004
>
Correspondence
>
Re: pond
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:02:08 PM
Creation date
7/12/2017 2:28:41 PM
Metadata
Fields
Template:
x Address Old
House Number
2665
Street Name
Mapleridge
Street Type
Lane
Address
2665 Mapleridge Lane
Document Type
Correspondence
PIN
2111723210004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KALLIO ENGINEERING INC. <br /> . - - . . - . <br /> 10775 Poppitz Lane <br /> Chaska, MN 55318 <br /> April 26,200� <br /> Lyle Oman,Chief Building Official <br /> City of Orono,MN <br /> RE: 2665 Mapleridge Lane <br /> Orono,MN <br /> Dear Mr.Oman: <br /> On Apri126,200�,I inspected the ponding area at 2655 Mapleridge Lane and found it to be in <br /> conformance with the Stormwater Management Plans dated January 5,200�. <br /> Variations from the plans include the following: <br /> • The constructed pond does not contain wet detention. Wet detention was not criteria set <br /> by the city and has no impact on rate control. <br /> • The tile lines containing roof drainage were reduced from 6 inch to 4 inch as required,but <br /> not outlet into the upper pond. The tile lines outlet into the crushed rock near the lower <br /> dry pond. The roof drainage area is actually minimal with a ioo year flood of only o.5 cfs, <br /> therefore,the asbuilt conditions are acceptable in regards to stormwater management. <br /> However,the tile lines should be monitored for plugging as they begin to collect gutter <br /> debris. If plugging becomes a problem,outletting the 6 inch tile lines into the upper dry <br /> pond should resolve any issues. <br /> Variations from the plans were allowed,provided necessary storage volumes were met. I believe <br /> the dry detention ponds as constructed meet the criteria as set forth by the city. <br /> If you wish to discuss this further,please contact me. <br /> Sincerely, <br /> KALLIO ENGINEERING INC. <br /> �c�.�.t ���2-��'" <br /> Curt Kallio,P.E. <br /> Fax: 952-400-8492 � www.kallicenqineerinp.com � Phone: 952-448-5725 <br />
The URL can be used to link to this page
Your browser does not support the video tag.