HomeMy WebLinkAbout2012-00636 - single family deetached CITY OF ORONO * Z 0 1 2 - 0 0 6 3 6 *
� 2750 KELLEY PARKWAY DATE ISSUED: 07/16/2012
�_ ORONO, MN 55356-
(952) 249-4600 FAX: (952) 249-4616
ADDRESS : 1595 MAPLE PL
PIN : 08-117-23-33-0035
LEGAL DESC : CRYSTAL BAY VIEW
: LOT 013 BLOCK 006
PERMIT TYPE : NEW STRUCTURE
PROPERTY TYPE : RESIDENT[AL
CONSTRUCTION TYPE : SINGLE FAM[LY
ACTIVITY : 101-SINGLE FAMILY HOUSES, DETACHED
VALUAT[ON : $ 328,689.86
NOTE: SEPERATE PERMITS REQUIRED: PLUMBING, MECHANICAL,FIREPLACE,WATER CONNECTION, SEWER CONNECTION,
LAWN IRRIGATION,ELECTRICAL(STATE)
NOTE: AS BUILT SURVEY REQUIRED PRIOR TO CERTIF[CATE OF OCCUPANCY [SSUANCE. INITIAL:
NOTE: BE AWARE,IN THE EVENT WEATHER OR OTHER CONDITIONS PREVENT THE COMPLETION OF AN AS-BUILT SURVEY AT
THE TIME THE CERTIFICATE OF OCCUPANCY IS REQUESTED,A TEMPORARY CERTIFICATE OF OCCUPANCY MAY BE ISSUED
UPON RECEIPT OF A$10,000 ESCROW TO ENSURE COMPLETION OF THE AS-BUILT SURVEY AND ALL SITE IMPROVEMENTS.
INITIAL:
ADV PLAN REVIEW COLLECTED 2012-00635$1,006.69 BASED ON VALUATION OF$181,900,VALUAT[ON CHANGED AND
DIFFERENCE WILL HAVE TO BE PAID
APPLICANT PERMIT FEE SCHEDULE 2,430J5
DEAN JOHNSON HOMES, INC. PLAN REVIEW 573.30
4700 CTY ROAD 19
MEDINA, MN 55357- STATE SURCHARGE(VALUATION) 164.35
(763)479-4820 S.A.C. 2,365.00
Minnesota State License#: 20639439 TOTAL 5,533.40
OWNER
Maple Place LLC
550 25TH AVE N
ST. CLOUD,MN 56303-
AGREEMENT AND SWORIY STATEMENT
The work for which this permit is issued shall be performed according to
the approved plans and specifications,applicable Ciry approvals,and the
State Building Codc. This permit is for only the work described and does
not grant permission for additional or related work which requires separate
permits. All provisions of laws and ordinances governing this type of work
shall be compied with whether or not specified herein.This permit will
expire and become null and void if construction authorized is not
commenced within 180 days of the date of issuance,or if construction is
suspended for a period of 180 days at any time after work has commenced.
The applicant is responsible for assuring all required inspections are
reques[ed in conformance with the State Building Code.This permit may be
revoked at any time for due cause. ���
����...�LQ___----_ l /(. ��G r ` �� _C ! — j L` � �
7 z j�..:�� l. �`�-'Yl C� �`? l l
Applicant Permitee Signature Date [ssued By Signature Date
SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE.
�
C��i�ty of Orora
2750 Kelley Parkway
Drono MI 55356 952-249-4604
l�ceipt No: 3.0072�1 Jul 16, 2012
Dean Johnson Hoses, Inc.
Previous Balarice: .04
Per�it5
2012-OOb36 1595 Maple 2,430.75
Place
101-32510
Building Per�its
Persits
�012-OOb36 1595 Maple 573.30
Place - pdditior�l �t
iQ1-34410
Plan Check/Site Exa� Fees
Per�its
z012-00636 1595 Maple 1b4.35
Place
101-2084P
Due to gavts-State
Per�it�
P012-00636 1595 Maple 2,365.00
Place
101-20809
�C Charges due to M�ArCC
Total: 5,�'•�
��k No: 4401 5,533.40
Payor:
Dean JohnSon Ho�es, Inc.
Total t�plied: 5,533.40
Change Tendered: � .00
07/15l2Q12 11:4bAM
l ur►��� � n ��. �p � � ca-t i��
Vt��.,�,�-d a-f
� ( � I � 00 c° ;
�l a�� ��-v i �� �d 1 , � L�C� . (�9
�SQ-cl c�� Gc��U� Va� uai i�
i� "%
��L��e -���������1 '�1��c7._��:��-h �
� � ' __ ____ _
_ _.
� � �a� � �� g� __,�
� � �
. .___�
____ __
� � , � �o -
��
��s�
�i�r c��� � � � � y � � �
�'
l.� � f-F �f }�Ic�r'� � 5��"� � . ��
��� v � c��� '�
j 5 �t� `��i -- l, ���1� - �`G - �
C:�O
� a � � � �
�� �
-�
� C� � � � 3 � . ��
►�' �� J'-�' �
��rn ��,
�i��S
City of Orono
Building Permit Application
for New Structures or Additions
Mailrng Address: Permit number: a���-�d 6 3
��,Q„Q��\ PO Box 66 -1 - 3_ �Z
�' �`Y Crystal Bay,MN 55323-0066 Date received:
', _ �4�: .r, � Received b :
`� �'���p,_;i�- �,� Streef Address:' __--::"._._.._..._Y-----
� �i� titi/ 2750 Kelley Parkway Plan reviewfee: o2��a����3 �
�rR���o4,�yG Orono, MN 55356 �QD(v.(�/
`,-`---,/ -- ,--�.__
Main: 952-249-11600 Fax: 952-249-4616 www.ci.orono.mn.us � �� Y� �� ��� ">� � y��
This application form must be completed in full and all required information must be submitted.
Incomplete applications will be returned. (Please print)
GENERAL INFORMATION: ,��
Job Site Address: � � �
Will this be a Parade of Homes, Remodeler Showcase H�me •r�ther Display Home? ❑ Yes No
!f yes,a specra!eveni permrt is required with Police Department and City Counci!approval 60 days prior to the event. Shuttle bus service will e
required unless applrcant demonstrates sufficient on-site parking rs available. Non-permitted events will not be allowed.
CONTRACTOR/APPLICANT INFORMATION:
Name: � �� � �
State License# Z...O �S 4- Expiration Date: 313 i � 3
Phone: "z 3— ' - 'Z..c� office �Z(a 4'Z.� 1 3� � cell
Mailing Address: 4-�c�o '� ► �1 yCit � v� � .��-- ZIP: r'a 5 3�.�
C o n t a c t P e r s o n: c�o.,"� c�-- Applicant is: ontrac o / Homeowner (Circle One)
Email and/or Fax: ,, c,� v�s� ' `� L 1
PROPERTY OWNER INFOR�TION: :
Name: �.
Phone (day):
Address: City: ZIP:
Email and/or Fax
ARCHITECT/ENGINE�Ej� It��ORMATION:
Name: __!S,�
Phone (day):
Address: City: ZI P: .
Email and/or Fax: .
PROJECT INFORMATION:
1.Type of Project 2. Proposed Use 3.Structure Type 4.Sewage Disposal&
Water Supply
�New Construction �..Single Family with Residence �
❑Addition attached garage �Garage/Accessory Bldg. �Public Sewer ,
❑Accessory Building ❑ Single Family with ❑ Deck
❑ Relocation detached garage ❑Office/Commercial ❑ Private Sewer
❑Other: (specify) ❑ Multiple Family/Condo ❑Warehouse
❑ Public ❑ Storage ❑ Public Water
**Any earth movement may require ❑Commercial ❑Other(specify) .
MC1NC�review&permits. ❑ lndustrial ❑Private Well
Minnehaha Creek Watershed District(MCWD) ❑Other: (Specify)
13202 tYtinnetonka Blvd
Ceephaven, MN 55391
Phone: 952-471-0590
Fax: 952-471-0682
wv��w sminneliahacreek.or
Estimated Construction Valuation (excluding land} $ j � C� p V ��
:-'�,,���,�� .�, 3 ;.�:SS � �� � ' �'�
� i ��
ti
� .
� •
STRUCTURE INFORMATION:
1.Structure Dimensions 1.Structure Dimensions(continued) 2.Type of Construction
a. Length(ft.)= l04' Number of bedrooms= �J �Wood/Frame
Masonry
b.Width(ft.)= � Number of garage stalls: ❑Metal
Attached= Z— ❑Pole Bldg.
Areas in sauare feet Detached= ❑ICF
� ❑On-site Prefab
c. Basement= 1 �(oS ❑Off-site Prefab
d. 1'`Story = 1 O'1 Z� ❑Other(please specify):
e.2nd Story= � i 3� �
f. %Story =
g.Total Area= �ZQ-4-�
REQUIRED SUBMITTALS:
All of the information must be submitted in order for our application to be processed:
Not
Enclosed A Iicable
❑ Permit A lication
❑ Pro osed Buildin Plans
1� ❑ MN State Ene Code Calculations and Mechanical Code Re uirements Form
�i� ❑ Surve meetin all re uirements
❑ ❑ Stormwater Pollution Prevention Plan
❑ Hardcover Calculation s
❑ ❑ Se tic S stem Site Evaluation Re ort
❑ ❑ Access Permit
❑ ❑ Wetland Buffer Im rovement Plan
❑ ❑ En ineered Plans for Retainin Walls 4 feet or above
❑ ❑ Plan Review Fee
❑ ❑ Other
APPLICANT ACKNOWLEDGEMENT:
• Agrees to provide all information required or requested by the Building Department;
• Agrees to pay the City of Orono for engineering consultant review costs in excess of$500;
• Certifies that the information supplied is true and correct to the best of his/her knowledge. The applicant recognizes that they
�re solely responsible for submitting a complete application being aware that upon failure to do so, the staff has no alternative
but to reject it until it is complete;
• Acknowledges the Escrow Agreement is completed and signed;
�
• Understands some or all of the information that you are asked to provide on this application is classified by State law as either
private or confidential. Private data is information which generally cannot be given to the public but can be given to the subject
of the data. Confidential data is information which generally cannot be given to either the public or the subject of the data. Our
purpose and intended use of this information is to annually update our records and records of other governmental agencies
'required by law. If you refuse to supply the information,the application may not be issued.
. Agrees that in the event that weather or other conditions prevent the completion of an as-buitt survey at the time the
Certificate of Occupancy is requested, a temporary Certificate of Occupancy may be issued upon receipt of a$10,000
escrow to ensure completion of the as-built survey and all site improvements.
ApplicanYs Signature: s) �— Date: (v Z' � �
. � �'��� ������ ��C������f f�� ���,� ��r€�������� � �.���€c���
Address J PID/ Legal: _ � S� JJ �� ��� (, �� �£�
Description of wrork: �� La-�� (��5��
Septic rediew bY� � Date ApRrov�d: � ' " i
, Zor�f�g review by: � Date Approved: ��� �
Builcfing review by: Date Approved: � —'� � "'?�1 �
Geadinc� revi�w by: V/�<�� r�..� Date Approved: / ��
Zoning File#: Resolution#: Resolution Date:
Zcr�En District Fire De artev�enf Post Office School Dis�rict
. �
Zoning: Lot Area '� � �AC Width:__� Depth: �
Survey Submitted: .�es L� No Date of Survey: � "�tp�s��---
Pro osed Sefbacks:
Front(L E�e�r( et) (�4s�'- . E 1�► j ( tV �S ' f �il ) Other Buitc6ings l'�e�#l�ncE
Side 'Sid�
�`. �' �o�
..y' ;
Building Defined Height:� ► Building Peak Height: #of Stories Ok?: E:
EQR A BUILDIP[G WITH A BASEIk�E1dT OR CRAWL SPl�CE: FOR A$UILDtNG ON A SLAB FOUPlDATIOPt: �/� `�
START WITH the distance belween the basement flooN crawl START the distance befween the s�ab and the highe
' �C� space floor and the highesf roof peak,the top of WITH roof peak,the top of#he comice o#a flat rooi
4S the comice of a flat roof,the deck line of a the deck line of a mansard roof,or the
mansard roo#;or the uppermost poin#on a round uppertnost poinY on a round or:other arch-ty�
or other arch- roof roof
�j,�2 E SUB�CT half the distance between the highest window and SUBT.RACT half the distance betweeh the highest windo�
, � hi hest roof -ak of a itched roof
�L and hi hest roof eak of a itched roof
;�"�'�` SUBTRACT the distance between the basement floor/crawl ADD the distance between the slab and the highe
��� space floor and the highest existing grade within existin- cede within the foundatio�
the foundation or 10 feet,whiehever is less. EQUALS 'Defined bui�din _hei fit
EQU Defined buildin .hei ht
� ! , t
Lot Cover ge; t.�4,��, Sf °fo
; Shoreiar�c! District �C1f�D P�rmit Received �v�ra e Lakeshore Sefback Bfuff
� Yes Q No 0 N/A 0 Yes Nc
�es I� I�o Q Yes � I�o N/A
, Permit Number. � 5etback:
, FEarcicov r Zones Existir� ` Pro osec� 1�ariance Re u�r CUF Re uire
0- 5' CI'Yes No � Yes No
7 - 50' ; ,, � TYPe(S)� Type(s):
250 0'
500- , �
4 �
REMARKS (in-house): ' � � �' •�� ��� �`�
Updated: 09/11/2009
z:lforms\plan review checklist.docx
Fees to �i� Char �a YES ��Q
�er�r�fi
Plart R�viev�
S�te S�arc#�ar��
irtvestigation Fee
SAC-N�amt�ee cs#��G ll��s
�e�er Connectioe� '
�V�f�er Cor�a�ectiar�
Park Fee
'Site tc�spec�tion :
Other(sp�ciiy)
N�i�csilaneous E�e�
Calcufated By:
S uare Foota e $ er S u�re Foota e
Basement �=p ,� X �� .�� _ $ � �i.`�-�'�.�Y7
1�'Floor � Ca e i�, X r�: , - � � b 73. �
2"d Floor l� t�G', "i X <� �� _ $ ��� �"��° ,�1
�
Garage '��' X ��,,�.� ' � 0`�o�'�7.i�lU
Estimated Construction Value: $��'�C�t�e.��
� Ordno InsRectio�s Requieed �dork Rec�uiring Separate �errrEits Required State Perrnits
C1 Site Plumbing �t Grading/ Filling � Weil
� Hardcover Removal Mechanical E3 Fire Electrical
,�'Footing C� Septic ,J�'Water Connection
Poured Wall �ireplace .��,�wer Connection
Fouredation Sunrey O Masonry �Lawn Irrigation
Radon Rock Bed ,1� Mfg.
Framing �! Other(specify)
� insula#ion
as-Buiit sun►�jr
Final
F Q Other(specify)
REMARKS (in-house):
Oth�r Review: Review�ed by: Date Appraved:
Access:Existing: Ei YES � NO New� � YES t� NO
l�EM�RKS(TO �E !�O'fED Q�E PERhA{T A�D IhEiTt�►LLE� �Y PEt2S01� Pl!l.LiPtG PER�fIT)
Updated: 09/11/2009
z:\forms\plan review checklist.doac
ti
i
� � � -I r� �-
o - � e � �
� � � � �
� �— � � � . �n �
��-- � o . �_.._
�,: � � � �
�� a � �
� � � , �
� � ^ � �
..... ..- �- �. C�
,. _ , � , ,,
� �� �
� � � . � �
�. �....._ �
� ' .'� ��� .
r ��
-�1 - . �',:.: ,p, �?
� � 6' � �' .
��_..
T S �, �' _ � .
`, � p � �.,
� -P`
U, � • �
� (1� � ..;,
�.
1.�
. . ; �
>�-__..�
� � �
� ,
�===_.
�
. � . �h:
� �
� �
� � �-
� �'
' �F,��v Ta.�/��1'G�cJ .S�4nl CS
�.:��es�: �S�S MAPCC PL�cE .L4�'�,j Ql` s��, CRy,1�TAL B+IY L/'eFGv Date: 6 26-�2
?ra�arac by: GR orvB ./c � r �!',!'Q C'!�l TF1'� i.�/� .
HARDCOVER CALCULATION WORKSHEET
SETBACK ZONE: (CIRCLE ONE) 0-75' 75-250 250-500 500-1000'
EXISTING HARDCOVER IN ZONE
A. House x = S.F.
Length Width
x = S.F.
x = S.F.
B. Garage x = S.F,
C. Driveway x = S.F.
x = S.F,
D. Sidewaik x = S.F.
x = S.F.
E. Patio/Deck x = S.F.
x = S.F.
F. Landscape x = S.F.
Underlain x = S.F.
By Plastic x = S.F.
G. Retaining Wails x = S.F.
H. Other x = S.F.
TOTAL HARDCOVER IN ZONE - S.F. A
TOTAL PROPERTY AREA IN ZONE - S.F. B
q + B x 100 = %
PROPOSED HARDCOVER IN�ZONE (including existing hardcover to be retained)
A. House x = /`�// S.F.
Length W idth
x = S.F.
C'v1�'f�F'� ,f'Tc�c�+.a S x N_ 6'7 = 2 3 S,F.
B. Garage x - = S.F.
C. Driveway x = Y2 S.F.
x = S.F.
D. Sidewalk 2-2-5 x 2 = `f$ S.F.
x = S,F.
E.-�Pet�eFBeck 06'CK�I�►/�t x = �S.F.
x = S.F.
F. Landscape x = S.F.
Underiain x = S.F.
By Plastic x = S.F.
G. Retaining Walls x = S.F.
H. Other E G�f1'/' ui�.t.U�i� lNFu, x = Z� S.F.
TOTAL HARDCOVER IN ZONE - �S9B S.F. A
TOTAL PROPERTY AREA IN ZONE - ?�2 S S.F. B
q /S98 = g 7/LS x100 = Z2. Y3 %
-21 -
, D EAiV ,T✓h/�til'G�t./ /�'d��S
� �c�-as�: /595 M�v�� ��,rc� . �o, rl�, BCo�k 6', C�fY�'�'.Pt e9�4Y d//6� ' Date: 6-Z6-12
=�c�a�zc ��: GRo.ve E�G .� .+rfvc•�+ jcr, �Nc,.
HARDCOVER CALCULATION WORKSHEET
SETBACK ZONE: (CIRCLE ONE) 0-75' 75-250'250-500' S00-1000'
EXISTING HARDCOVER IN ZONE
A. House x = S.F.
Length Width
x = S.F.
x = S.F.
B. Garage x = S.F,
C. Driveway x = S.F.
x = S.F.
D. Side�.�alk x = S.F.
x = S.F.
E. Patie;Deck x = S.F.
x = S.F.
r. �andscape x = S.F.
Underlain x = S.F.
By Plastic x = S.F.
G. Retaining Walls x = S.F.
N. Other x = S.F.
TOTAL HARDCOVER I,N ZONE - S.F. A
TOTAL PROPERTY AREA IN ZONE - S.F. B
A + B x 100 = %
PROPOSED HARDCOVER IN�ZONE (inctuding existing hardcover to be retained)
A. House x = 6 S.F.
Length Width
x = S.F,
x = S,F.
B. Garage x - = S.F.
C. Driveway x ' _ �f8'� S.F.
x = S.F.
D. Sidewalk !/ x Z = 2 Z S.F.
x = S.F.
E. Patio/Deck x = S.F.
x = S.F.
F. Land.scape x = S.F.
Underiain x = S.F.
By Plastic x = S.F.
G. Retaining Waiis x = S.F.
H. Other x = S.F.
TOTAL HARDCOVER IN ZONE - Si2 S.F. A
TOTAL PROPERTY AREA IN ZONE - l875 S.F. B
A S�2 -i- B /�75 x100 = L�.3/ %
-21 -
.
► .0 E/,+� ..TG/✓�-'J'�i,.� h'�,�(�.�'
� ���-ess: iS95 �i�ncF P�•rcE . �oT i�, B�aPQc(,, CB�I7./G �A,'o''P/t�C.�.�' ' Date: �-26'/2
=-e�a,-z� �y: G,e a�v�Fae f Al'l'n c�.�rF./'�.�ru'e.
HARDCOVER CALCULATION WORKSHEET r��'�� ���' r�''''''��f
� �
EXISTING HARDCOVER IN ZONE
.�. House x = S.F.
Length Width
X = S.F.
x = S.F.
6. Garage x = S.F,
C. Drivevaay x = S.F.
x = S.F.
C. SiderrclK x = S.F.
X = S.F.
E. PatioiDeck x = S.F.
x = S.F.
-. 'andscape x = S.F.
underlain x = S.F.
By Piastic x = S.F.
;:. Retaining Walis x = S.F.
, .. Q;her x = S.F.
TOTAL HARDCOV•ER W ZONE - S.F. A
TOTAL PROPERTY AREA IN ZONE - S.F. B
A + B x 100 = %
PROPOSED HARDCOVER IN'ZONE (including existing hardcover to be retained)
A. House x = /�/7 S.F.
Length Width
x = S.F.
Cai/E,cFo ✓7-co p S x Y- 6'7 = 2 3 S,F.
B. Garage x = S.F.
C. Driveway x = S 2 6 S.F.
x = S.F.
D. Sidewalk x = 6 7 S.F.
x = S.F.
E. -R�ie/Deck f J`�'��R S X = S 7 S.F.
x = S.F.
F. Landscape x = S.F.
Underlain x = S.F.
By Plastic x = S.F.
G. Retaining Walls x = S.F.
H. Other E�"�Fr!' !.✓�.LOGG� l.vE�L x = 2 O S.F.
TOTAL HARDCOVER IN ZONE - 2// o S.F. A
TOTAL PROPERTY AREA IN ZONE�u''�'✓atE !or'J - 9aD o S.F. B
A 2// p T B 4'�r/D x 100 = 2.�. 'yY %
-21 - �
S`�� DATE TIME �
CITY OF ORONO CALLED IN� 7��
INSPECTION NOTICE SCHEDULED �2-- ���°ti
PERMIT N0. aDl� -Od��COMPLETED
ADDRESS �595 /Ll��e Go
OWNER TELEPHONE NO. ��L ��� 973�
CONTRACTOR �� �����N �� ���
� DESCRIPTION
�'���'1�J—�/P�/k��r� �r�—
� ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING
Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORFJWETLANDS
y ❑ FRAMING ❑ MECHANICAL FINAL
Q ❑ TREE REMOVAL
Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
� ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
� ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
i ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL
Z OWNERICONTRACTOR TO MEET YOU:_YES_NO
v�, COMMENTS:
�
W
a
�
J
O
�
�
O
�
W
k
Q
�
Z
W
�
W
�
�
d
� RK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
� ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
W
0 ❑CORRECT WORK,CALL FOR REiNSPECTION TEMPORARY
V BEFORECa/ERING PERMANENT
❑CORRECTUNSAFECONDITIONWITHIN HOURS. p pHOTOTAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR �CITATION ISSUED
❑INSPECTION RE�UIRED.CALL TO ARRANGE ACCESS.
Ca11 for the next inspection 24 hours in advance. (g52) 249-4600
OwnerlContractor on site:
Inspector. �
White Copyllnspector's File Canary CopylSite Notice
C� D E TIME v
CITY OF ORONO CALLED IN �-�—
INSPECTION OTI SCHEDULED �_
PERMIT NO. ���� co PLETED
ADDRESS ��
OWNER T L PHONE NO 3 ��
CONTRACTOR L� �
a DESCRIPTION 7 �1/�
�
� � FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FiLLING
Q ❑ POURED WALL O MECHANICAL RI ❑ LAKESHORE/WETLANDS
y ❑ FRAMING ❑ MECHANICAL FINAL
Q ❑ TREE REMOVAL
Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
� ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
v ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
i ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
� ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATIOWREMOVAL
� OWNER/CONTRACTOR TO MEET YOU:_YES_NO
y COMMENTS:
�
W
a
J
O
� �t �
O
�
W
�
Q
�
Z
W
�
W
�
� /
� �9iAlORK SATISFACTORY:PROCEED ❑PROJECT COMPLETE
W ❑CORRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
�CORRECTUNSAFECONDITIONWITHIN HOURS. p pHOTOTAKEN
INSPECTOR WILL RETURN ❑CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
❑INSPECTIONREQUIRED.CALLTOARRANCaEACCESS.
Ca11 for the next inspection 2a hours in advance. (g52) 249-4600
Owner/Contractor on ske•
Inspector. '��
v
White Copyllnspector's Flle Canary CopylSfte Notice
�0,"� DAT TIME V
C�TY OF ORONO n��e�iN
INSPECTION NOTICE SCHEDULED -� �
PERMITNO.aDIo"t.-00�03(o COMPLETED
ADDRESS �5 q S /� �Q
OWNER D�-�-� T� TELEPHONENO.��z ZZ� 1�b
CONTRACTOR � `�
_d � �
� DESCRIPTION� u
�
� ❑ FOOTING O PLUMBING FINAL ❑ EXCAV/GRADING/FIWNG
y O POURED WALL ❑ MECHANICAL RI ❑ LAKESHORFJWETLANDS
❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL
Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
� ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
v ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
i O DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
v ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/HEMOVAL
2 OWNERICONTiIACTOR TO MEET Y�OU:_YES_NO
y COMMENTS:
a�
a
j
O
�
O
W
�
Q
�
2
�
W
�
�
J
O
� ❑WORK SATISFACTORIh PROCEED ❑PROJECT COMPLETE
W ❑CORRECT WORK 8 PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY
0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑pHOTO TAKEN
INSPECTOR WILL RETURN ❑CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
O INSPECTION RE(]UIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours i ance � 49-46��
OwnerlContractor on site:
Inspector:
Whfte Copyllnspecto�'s File Canary CopylSite Notics
� � � "` � �'� � C DATE TIME �
CITY OF ORONO �� � � � �
INSPECTION NOTI�C1E���
PERMIT NO. ���'��`� � COMPLETED
ADDRESS I S��S /����c�i�)If� �-�IC�'('C-�
OWNER TELEPHONE NO. ��c2� y�� � �'G�
CONTRACTOR ��(—'C.�`"� .��J .�t�✓i
� DESCRIPTION L.l y�,S i.i l�-�%CY� '"/ �/�c�?��
� ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING �
Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORENVETLANDS
y ❑ FRAMING ❑ MECHANICAL FINAL
Q ❑ TREE REMOVAL
Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
� ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
� ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
_ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
J ❑ PLUMBING RI ❑ SEP I �FINAL ❑ FOUNOATION/REMOVAL
� OWNERICONTR-AC_T�O MEET YOU: YES_NO
� COMMENTS:
�
W
C
� �.: � �-'�� C��
0
a
�
° �� �� �� --1 C>�.�c�S � i �-� �
Q ,�� : }-- � ��d, � cr
Z �� ( � � f� � dr�.�l�
� %� .. � C) < <C
W
�
�
d
W� f�41081CSATISFACTORY:PROCEED ❑ PROJECT COMPLETE
W ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECTUNSAFECONDITIONWITHIN HOURS. � pHOTOTAKEN
INSPECTOR WILL RETURN ❑CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
� INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call forthe next inspection 24 hours in advance. �95Z� Z49-4600
OwnerlContractor on site:
r =�Inspector. % , � ,� (E_
White Copyllnspector's File Canary CopylSite Notice
C � � ' /
� 2�'�2- ,_.1�L�I�IT I� TIME C V
CITY OF ORONO �� c N �
INSPECTION NOTICE �/� sc�
PERMIT NO.��,�. - ��iP� COMPLETED ,�
ADDRESS � ��� cJ �1��� �� �� � (
OWNER TELEPHONE NO�� 3y 3 �3 I ��
CONTRACTOR ����Ctl�t � I'1�nC
>; DESCRIPTION �--
�
� ❑ FOOTING ❑ PLUMBING FINAL �EXCAV/GRADING/FILLING
Q ❑ POURED WALL ❑ MECHANICAL RI ❑ IAKESHORE/WETLANDS
y ❑ FRAMING ❑ MECHANICAL FINAL
O ❑ TREE REMOVAL
Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS
� ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
v ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
? ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL
� OWNER/CONTRACTOR TO MEET YOU:_YES_NO
� COMMENTS:
�
W
C
�
J
O
�
�
O
�
W
�
Q
ti
Z
W
�
W
�
j
d .,,,,�'�
W� �WORKSATISFACTORY:PROCEED ❑ PROJECTCOMPLEfE
W ❑CORRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
�CORRECT UNSAFE CONDITION WITHIN HOURS. � pH0T0 TAKEN
INSPECTOR WILL RETURN ❑CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
❑ INSPECTION REQUIRED.CALLTO ARRANGE ACCESS.
Cail for the next inspection 24 hours in advance. �952� 249-46QQ
OwnerlContractor on site:
,..!
Inspector.
White Copyllnspector's File Canary CopylSite Notice
C� � D E TIME �
CITY OF ORONO CALLED IN 9' ��
INSPECTION NOTICE SCHEDULED `�� �
PERMIT N0.Q�D/a7 D���. COMPLETED
ADDRESS �SgS _ �G
OWNER T�LEPHONE NO. ��a 3G�a��
CONTRACT�R 4 �i1L L���������0
� DESCRIPTION ^a�' /
� ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FIILING
Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHOREM/ETIANDS
y ❑ FRAMING ❑ MECHANICAL FINAL
❑ TREE REMOVAL
Z ❑ INSULATION � WOOD BURNER/FIREPLACE ❑ SITE INSPECTION
Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PFOGRESS
� ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT
J ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP
_ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL
J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL
Z OWNER/CONTRACTOR TO MEET YOU:_YES_NO
h COMMENTS:
�
W
0.
� �� �-� �� �� r� � �,�
0
�
° �os� _r� �� �� c _ �
Q l���A ► 1 �-P ' e� �1�Qcr�rt7
z ��.�—� �.� �O��' �r�cJ���
W
�
W
�
�
d
W� WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
W ❑ CT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
0 ❑CORRECT WORK,CAII FOR REINSPECTION TEMPORARY
V BEFOREC01/ERING PERMANENT
❑CORRECTUNSAFECONDITIONWITHIN HOURS. p pHOTOTAKEN
INSPECTOR WFLL RETURN ❑CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
❑ INSPECT�ON REQUIRED.CALL TO ARRANGE ACCESS.
Caii for the next inspection 2a hours in advance. (g52) 249-4600
OwnerlContractor on site:
Inspector.
White Copyllnspector's File Canary CopylSite Notice
. •
, • • • •
� • ,
emo
To: Finance Department
From: Christine Mattson, Planning Assistant
CC: Street File
Date: May 27, 2014
G/L: 101-22205
Re: Escrow Refund
Building Permit Application #2012-00636 pertaining to 1529 Maple Place is complete.
Please refund $10,000 to the application, Maple Place, LLC.
The following is attached:
• Escrow refund request
• Original signed escrow agreement
• Copy of cash register receipt showing escrow amount received
Mail to: Maple Place, LLC
550 25�'Ave N
St. Cloud, MN 56303
w:�.street files�bay ridge road�1501�escrow refund 2012-01083.doac
Christine Mattson
From: Melanie Curtis
Sent: Wednesday, May 14, 2014 2:40 PM
To: Christine Mattson
Subject: FW: 1595 Maple Place Escrow
See below
Melanie Curtis � 952.249.4627 � mcurtis@ci.orono.mn.us
_ _ _
From: Jamison Kohout fmailto:jamisonkohoutCa�gmail.com]
Sent: Wednesday, May 14, 2014 2:36 PM
To: ]esse Struve
Cc: Melanie Curtis
Subject: RE: 1595 Maple Place Escrow
Thank you Jesse.
Jamison Kohout 612.282.7053
www.JamisonKohout.com
Premier Real Estate Services
On May 14, 2014 2:21 PM, "Jesse Struve" ystruve_,ci.orono.mn.us>wrote:
Melanie,
The sod is in place along Minnie Ave.
Jesse Struve, PE
Director of Public Works/City Engineer
City of Orono
(952) 249-4661-Direct
(952) 249-4616-Fax
www.ci.orono.mn.us
From: ]amison Kohout [mailto:jamisonkohoutCalgmail�coml
Sent: Wednesday, May 07, 2014 7:37 PM
1
To: Jesse Struve
Subject: 1595 Maple Place Escrow
Jesse,
I forgot to walk you over to 1595 Maple Place the other day. Could you please drive by tomonow and confirm
that the sod issue on Minnie is satisfied? Christine is waiting for this in order to close the escrow.
Thanks,
Jamison Kohout 612.282.7053
www.JamisonKohout.com
Premier Real Estate Services
z
TEMPORARY CERTIFICATE OF OCCUPANCY
ESCROW AGREEMENT
Orono Buiiding Permit#2012-00636
AGREEMENT made this�day of , 20�by and befinreen the CITY OF
ORONO, a Minnesota municipal corporation ("City") and T d Holmers on behalf of Real Assets, LLC
("Owners").
Recitals
1. Construction of the new residence located at 1595 Maple Place the ("Subject Property"),
legally described as Lot 13, Block 6, Crystal Bay vew in Orono, Hennepin County
Minnesota, is the subject of building permit application number 2012-00636 has been
completed.
2. Winter conditions currently prohibit comptetion of exterior improvements, final grading,
and vegetation establishment. An as-built survey cannot be accurately conducted at this
time.
3. Owners request the City issue a temporary certificate of occupancy ("TCO") to the
Owners so that the Owners may occupy the new residence.
4. The City will issue a TCO only if the Owners establish an escrow to ensure compfetion of
exterior improvements, continuation of erosion control and submittal of an as-built sunrey
to the City.
NOW THEREFORE,THE PARTIES AGREE AS FOLLOWS:
1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow
Agreement, the Owners shall deposit an additional $7,500 for a total of$10,000 with tlie City. All accrued
interest, if any, shall be paid to the City to reimburse the City for its cost in administering the escrow
account.
2. PURPOSE OF ESCROW. The purpose of the escrow is to assure completion of any
exterior improvements, final grading, establishment of vegetation as well as guarantee reimbursement to
the City for all out-of-pocket costs the City has incurred (including planning, engineering, in excess of
$500, or legal consultant review) or will incur in reviewing the plan. Eligible expenses shall be consistent
with expenses the Owners would be responsible for under a building permit application. The escrow will
also guarantee reimbursement to the City for all out-of-pocket costs the City has incurred to assure that
the work is completed in accordance with the Stormwater Pollution Prevention Plan and the provisions of
Orono City Code Chapter 79. The financial security may also be used by the City to eliminate any
hazardous conditions associated with the work and to repair any damage to public property or
infrastructure that is caused by the work (including planning, engineering, or legal consultant review)
associated with building permit #2012-00636 if compfiance with the approved building permit is not
accomplished.
3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will
in turn send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of
the Owners' receipt of bill.
4. DlSBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make
payment to the City within the timeframe outiined in#3 above, shall issue a Stop Work Order until the Owners
pay all expenses invoiced pursuant to#3. The City may draw from the escrow account without further approval
of the Owners to reimburse the City for eligible expenses the City has incurred.
5. CLQSIN� ESCR01h►. The $alance on deposit in the escrow, if any, shall be returned to
the Owners when the review has been compfeted and written notification is received from the Owners
requesting the funds.
155441
6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible
expenses incurred by the City exceed the amount in escrow, the City shall have the right to certify the
unpaid balance to the subject property pursuant to Minn. Stat. §§415.01 and 366.012.
7. ACCESS TO SUBJECT PROPERTY. The Owners hereby grant to the City, its agents,
employees, officers and contractors, the right to enter upon the subject property for the specific purpose
of inspecting and completing any exterior improvements, final grading, establishment of vegetation and
the restoration of the subject property should the Owners not complete the work by the specified dates.
CITY: CITY OF ORONO OWNERS:
�.,
By: �
Its. �'Y].�
155441
C-i-ty of Ororro
C►r7��Kel�leY�a�"�y ,_
95�. 249-46�
Receipt No: 3.OQ8291 Jan 15, 2413
Hol�ers, T�id 1 Real Assets, LLC
Rlanning and Zoning
TCO for I595 lyaple Place 7r�,qp
i41-222pg
Oeferred Rev-Developer Deaosit
Tatal: �7}�.�'
t�eck —'"-"'=
Cherk hb: t108469 7,500.00
Pavor:
Hala�ers Tadd / Real Assets, lLC
Total App�ied: �}�.�
Change Tendered; � -'.�
O1/15l2013 Q4:0��
' CITY OF ORONO * z 0 1 3 — 0 0 0 4 0 *
2750 KELLEY PARKWAY DATE IssUED: OU16/2013
ORONO, MN 55356-
(952) 249-4600 FAX: (952) 249-4616
ADDRESS : 1595 MAPLE PL
PIN : 08-117-23-33-0035
LEGAL DESC : CRYSTAL BAY VIEW
: LOT 013 BLOCK 006
PERMIT TYPE : ESCROW FEE-TIED TO BUILDING PERMIT
PROPERTY TYPE : RESIDENTIAL
CONSTRUCTION TYPE : ESCROW FEE-TIED TO BUILDING PERMIT
NOTE: THIS$7500.00 ESCROW IS TIED TO BUILDING PERMIT#2012-00636-PD CHECK#8469-TODD HOLMERS
APPLICANT ESCROW FEE-BUILDING 7,500.00
Maple Place LLC ESCROW FEE-EROSION CONTROL 0.00
550 25TH AVE N
ST.CLOUD,MN 56303- ESCROW FEE-GRADING 0.00
TOTAL 7,500.00
OWNER
Maple Place LLC
550 25TH AVE N
ST. CLOUD,MN 56303-
AGREEMENT AND SWORN STATEMENT
The work for which this permit is issued shall be performed according to
the approved plans and specifications,applicable City approvals,and the
State Building Code. This permit is for only the work described and does
not grant permission for additional or related work which requires sepazate
permits. All provisions of laws and ordinances governing this type of work
shall be compied with whether or not specified herein.This permit will
expire and become null and void if construction authorized is not
commenced within 180 days of the date of issuance,or if construction is
suspended for a period of 180 days at any time after work has commenced.
7'he applicant is responsible for assuring all required inspections aze
requested in conformance with the State Building Code.This permit may be
revoked at any time for due cause.
/ / / /
Applicant Permitee Signature Date Issued By Signature Date
SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE.
� ..., .•� , . ,�r�,...,�. . i�.cL�
BUILDING PERMIT ESCROVI�AGREEMENT
. Orono Building Permit#2012-00636
AGREEMENT made this ?(c��day of , 201� by and befinreen the CITY OF ORONO,
a Minnesota municipal corporation (`'City")and Map e Place LLC ("Owners").
Recitals
1. A building permit application has been filed for new principal structure located at
1595 Maple Place the ("Subject Property"), legally described as Lot 13, Block 6, Crystal Bay View, Hennepin
County Minnesota.
2. Owners request the City to review this application.
3. The City will commence its review of the application and incur costs associated with said review
only if the Owner establishes an escrow to ensure reimbursement to the City of its costs.
NOW THEREFORE,THE PARTIES AGREE AS FOLLOWS:
1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow
Agreement, the Owners shall deposit$2,500 with the City. All accrued interest, if any, shall be paid to the City to
reimburse the City for its cost in administering the escrow account.
2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City
for all out-of-pocket costs the City has incurred (including planning, engineering, in excess of $500, or legal
consultant review) or will incur in reviewing the plan. Eligible expenses shall be consistent with expenses the
Owners would be responsible for under a building permit application. The escrow will also guarantee
reimbursement to the City for all out-of-pocket costs the City has incurred to assure that the work is completed in
accordance with the Stormwater Pollution Prevention Plan and the provisions of Orono City Code Chapter 79.
The financial security may also be used by the City to eliminate any hazardous conditions associated with the
work and to repair any damage to public property or infrastructure that is caused by the work (including planning,
engineering, or legal consultant review) associated with building permit #2012-00636 if compliance with the
approved building permit is not accomplished.
3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will in turn
send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners'
receipt of bill.
4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make payment
to the City within the timeframe outlined in#3 above, shall issue a Stop Work Order until the Owners pay all expenses
invoiced pursuant to #3. The City may draw from the escrow account without further approval of the Owners to
reimburse the City for eligible expenses the City has incurred.
5. CLOSING ESCROW. The Balance on deposit in the escrow, if any, shall be returned to the
Owners when the review has been completed and written notification is received from the Owners requesting the
funds.
6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible expenses
incurred by the City exceed the amount in escrow, the City shall have the right to certify the unpaid balance to the
subject property pursuant to Minn. Stat. §§415.01 and 366.012.
CITY: CITY OF ORONO OWNER:
By: ,��J�, .� /l�� `�-+--__
��.. �
�ts: �y C".�c�
C�_it_y of pro�o
�75� Kelley ParkNay
Drotro MV 553� 95P-249-4600
Aeceipt No: 3.007222 Jal ib� 2012
Dean J�nson Hoses, Iru
Rlanni�n�g ar�d Zonin
2012-OObb9 EscroN �or Ne�► 2.500.Od
Ho�e Pere�it i2012-0063fi
101-�2205
Deferred Rev-Developer Deposit
Total: 2��,Q�
Check -' -
Check No: 4003 2,500.t�
Payor:
Dean J�nSori Flaes, I�
Total Applied: pl�pp,ap
Change Tendered; ,pp
07/16/2412 1i:47(�I
� � � CITY OF ORONO � 0 1 Z — 0 P1 6 6 9 *
, 2750 KELLEY PARKWAY DATE ISSUED: 07/16/2012
� ORONO,MN 55356-
•'" � (952) 249-4600 FAX: (952) 249-4616
ADDRESS : 1595 MAPLE PL
PIN : 08-117-23-33-0035
LEGAL DESC : CRYSTAL BAY VIEW
: LOT 013 BLOCK 006
PERMIT TYPE : ESCROW FEE-TIED TO BUILDING PERMIT
PROPERTY TYPE : RESIDENTIAL
CONSTRUCTION TYPE : ESCROW FEE-TIED TO BUILDING PERMIT
NOTE: ESCROW FEE TIED TO BUILDING PERMIT#2012-00636 FORNEW HOME PERMIT
APPLICANT ESCROW FEE-BUILDING 2,500.00
DEAN JOHNSON HOMES,INC. TOTAL 2,500.00
4700 CTY ROAD 19
MEDINA,MN 55357-
(763)479-4820
Minnesota State License#:20639439
OWNER
Maple Place LLC
550 25TH AVE N
ST. CLOUD,MN 56303-
AGREEMENT AND SWORN STATEMENT
The work for which this permit is issued shail be performed according to
the approved plans and specifications,applicable City approvals,and the
State Building Code. T'his permit is for only the work described and does
not grant permission for additional or related work which requires separate
permits. All provisions of iaws and ordinances goveming this type of work
shall be compied with whether or not specified herein.This permit will
expire and become null and void if construction authorized is not
commenced within 180 days of the date of issuance,or if consuuction is
suspended for a period of 180 days at any time after work has commenced.
The applicant is responsible for assuring all required inspections are
requested in conformance with the State Building Code.This permit may be
revoked at any time for due cause. ,�,N
� ,,p /�'�
��.�—•a,�C�'�____-...— `7 / i G l'Z<=�i� �ll�-`i--'�--e. C��?/YLG�'�/t / �j �k' ' �
Applicant Permitee Signature Date Issued By Signature Date
SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE.
___
�'- Permit �' � �
� i� � ► ►i � � � PI� CI o*N � �+
lJ�daie A.��
Permit#: �1��3�
� i�ain P�N Addres�
RermitAddress: 1595 Maple PI l' Additionai PB�i A�dr���
r Permit Issue � Parcel Issue
General � Fees Inspections(11} �Nat+es � Applicant Qetail � CO Detail �
Seq Inspection Type Inspector �ate Status H Fee Rec
�1 Footing WGIB 7119/2012 P 0
� 2 Poured Wall WGIB 7l20f2012 P Y 0
� 3 Foundation Survey B14 Framing �!
• d Radon Prevention Inspection WGIB 9111/2012 P Y 0 �
� 'S Framing WGIB 9�26f2012 P 0
+ 6 :Insulation WGIB 9l2712012 P Y 0 -- :
� � + : - ' ! �1 •' 1
T 8 Final WGIB '�fi4f2013 F Y 0
� �9 Final REINSPECTION Y 0 '
� 10 Final REINSPECTION 1��1ETD 111012014 Y 0 —�
� i 1 Final REINSPECTION 1�1ETD 2,r27f2014 P Y 0