HomeMy WebLinkAboutre: soil/evaluation , �
< , ♦
ITCO ALLIED ENGINEERING CO.
AN ALLIANCE OF INSTANT TESTING COMPANY AND ALLIED TEST DRILLING
Jobsite and Laboratory Testing, Geotechnica/Services, Commercial, Residentia/and Municipal
7125 West 126th Street, Suite#500 - Savage, MN 55378
Telephone: (952)890-7366 Fax: (952)890-5883
June 11, 2014
Atlashomes Phone: 763-425-3333
14450- 117'h Avenue North Fax: 763-390-0039
Dayton, Minnesota 55369 mark@atlashomesmn.com
RE: Lot 8 Block 6, Maple Place
Orono, Hennepin County, Minnesota
As requested, a site visit was made on June 11, 2014 at 11:08 A.M, to evaluate and test soils for
the construction of a full basement single-family residence. At the time of the inspection, an
� excavation with sides collapsed from recent rains and with about 6"of water in the center. The base
of the excavation consisted of approximately 18"of a wet, soft clay on top of a fairly solid Clay
base.
To assess the relative strength of the base soils, a 5/8'h inch diameter smooth probe was used at
random to penetrate the excavation circumference. With full body weight applied, the probes
indicated solid clay base at all points.
The load bearing capacity of the soils were evaluated by a dynamic cone penetrometer test
conducted at the base of the excavation. The dynamic cone penetrometer (DCP), employs a eight
kilogram (17.6 pound) hammer to drive a 20 millimeter diameter conical point into the soil, with the
penetration recorded in millimeters per blow. From the DCP readings, a per blow, penetration
average was recorded and a N-value derived. This N-value is an empirical relationship we have
established to equate the dynamic cone data to the more familiar blows per foot(8PF)standard
penetration soil boring test.
Test#1 — Excavation Base (East side)
DCP Depth Per Blow Avct. / N-Value Estimated Load
158 MM (6.2") 16 MM/ N—20 >4000 PSF
Based upon our observations and tests, it is recommended that all soft clay be excavated from the
building pad, and replaced with a granular engineered fill to proposed footing elevation. This fill
material should be consolidated with a vibratory compaction device at intervals of approximately 8
to 10 inches.
In our opinion, with the noted corrections, the observed and tested sub-grade soils are acceptable,
and would be expected to meet an assumed minimum bearing capacity requi�ement of 2000 PSF,
for the proposed construction. Our observations and subsequent soil evaluation on this date is
limited in scope to soil conditions observed within the completed excavation, and to the depths
achieved by shallow probes and a dynamic cone penetrometer test.
Sincerely,
Itco Allied Engineering Company Reviewed By:
��6'�sG;.G.(I ��� Gp"__"
Ken Schaaf Robert P. Sullentrop, P.E.
Senior Inspector Minnesota Reg. # 17823
CC: City of Orono Building Inspections
701 - 0 / #605— 1 / #610—'/< /#304/(1) DCP / #612—53
. �
� � � �
ITCO ALLIED ENGINEERING CO.
AN ALLIANCE OF INSTANT TESTING COMPANY AND ALLIED TEST DRILLING
Jobsite and Laboratory Testing, Geotechnica/Services, Commercial, Residentia/and
Municipal
7125 West 126th Street, Suite#500 - Savage, MN 55378
Telephone:952-890-7366 • Fax:952-890-5883
Atlashomes
14450-117�h Avenue North
Dayton,Minnesota 55369
Project:
Date Tested:June 12,2014 Reported:June 13,2014
Ordered By:Customer Technician: Tom Warner
Standard Proctor Test Results
Proctor Curve Number: 14-01
Visual Soil Class: Sand
Standard Maximum Dry Density,PCF: 109.2
Optimum Moisture,%: 13.23
Representative Of: Imported Material
Remarks:
Copies to:
, Charge Codes: Standard Proctor #303 - 1
' Sample Preparation #302 - 1
Signed ` _ `"'�r��;-��:��sr.c:_�?�...----
Gordon J.Kopacek,Professionai Engineer—Registration No.7254
• � , ,
ITCO ALLIED ENGINEERING CO.
AN ALLIANCE OF INSTANT TESTING COMPANY AND ALLIED TEST DRILLING
Jobsite and Laboratory Testing, Geotechnical Seivices, Commercial, Residential and Municipal
7125 West 126th Street, Suite#500 - Savage, MN 55378
Telephone: (952)890-7366 Fax: (952)890-5883
DENSITY TEST REPORT
Atlashomes
14450- 117th Avenue North
Dayton, Minnesota 55369
Project: 1565 Maple Place,Orono
Date Sampled: 6-12-2014 @ 10:36 am Reported: 6-13-2013
Ordered By: Bob, Doran Construction Performed By: Ken Schaaf
Inplace Density Results
Test Number: 1 2
Location: 18'South&22' 10'South& 16'
East of NW East of NW
Corner Comer
Depth Below Footing Grade: Footin Grade 2'
Visual Soil Class: Sand Sand
Proctor Curve Number: 14-01 14-01
Percent Moisture: 4.6 7.1
Optimum Moisture: 13.3 13.3
Relative Moisture,Percent: 35 53
Field Density,PCF: 111.4 110.1
Standard Maximum Dry Density,PCF: 109.2 109.2
Relative Density,Percent: 102 101
� Required Minimum: 98 98
Remarks:
Copies To:
Charge Codes: Density Tests 1-2 #601 1
Charge Per Test #306 2
Mileage #612 53
�' _.,.._
,rxc��, : .. ,a'�.�eE'.�'�...._..._.
Signed:
Gordon J.Kopacek,Professional Engineer—Registration No. 7254