Loading...
HomeMy WebLinkAboutRe: addition/need for permit � o� - o ,, o ��,��� cITY of oRONo �_� � ,� !��;;�`--.�. �., � �1�� '`'�=�' �, tiiunicipal Offices �'' s�, � �,L�+I�,; �.�i ,`� ��' Street Address: Mailing Address: `9kESKpg' 2750 Kelley Parkway P.O. Box 66 Orono, MN 55356 Crystal Bay, MN 55323-0066 December 21, 1993 James F. Mittelstaedt, III 3468 Lyric Avenue Wayzata, MN 55391 RE: Work Without Building Permit Dear Mr. Mittelstaedt: It has come to the attention of this department that you have recently constructed an addition to the rear of your gara�e and did some remodeling on your house at 3468 Lyric Avenue. This letter is to notify you of the requirement of a �uilding permit for this work. Therefore the City must require you to remove the improvements or to provide a building permit application with the required submittals for review before January 10, 1994. If this deadline is not met, the City may initiate legal action. If you have any questions or if I can assist you in any way, please feel free to contact me at my office. � Sincerely, � � LyI Oman Building Official ' LO/lsv cc: Jeanne A. Mabusth, Building & Zoning Administrator Bruce L. Vang, Fieid Inspector Telephone (612) 473-7357 • FAX 473-�10 � °� ,�_ �o �� /� O�'� ' ������� `����.`�. � C ITY of ORONO I � �'� ,"'� Municipal Offices \ � ���,�� �`�� �' � �'� r'�Y, ���' G~ Street Address: Mailing Address: ��9x s��4� 2750 Kelley Parkway P.O. Box 66 Orono, MN 55356 Crystal Bay, MN 55323�0066 March 2, 1994 Mr. James Mittelstaedt, III 3468 Lyric Avenue Wayzata, Minnesota 55391 Re: Work without Building Permit Dear Mr. Mittelstaedt: On December 21, 1993 this office notified you of building permit requirements for a garage addition and remodeling on your home at 3468 Lyric Avenue. You attempted to contact me and I attempted to return your calls. As of this date, we have not made contact and a building permit application has not been filed. 'This letter is to require you to remove the improvements or file a building permit application with building plans and a survey before March 16, 1994. If this deadline is not met, the City will initiate legal action. If you have any questions, feel free to contact me at my office. Sincerely, � � l�i�w`� � � Lyle Oman Building Official LO/ch Enc. Building Permit Application cc: Jeanne A. Mabusth, Building & Zoning Adm. Bruce L. Vang, Field Inspector Telephone (612) 473-7357 • FAX 473-0510 .� o.� ��=��.� � �`�,� C ITY of ORONO �-�.:a-� , ������—' p,� Nlunicipal O�ces � � ��1 � `"`� ti .� ��� 1� �� C�~ Street Address: Mailing Address: L'��'�:�`���� 2 7 5 0 Kelle y Parkway P.O. Box 66 `9kES�g Orono, MN 55356 Crystal Bay, MN 55323 0060 March 23, 1994 Jay Mittelstaedt 3468 Lyric Avenue Wayzata, MN 55391 RE: Garage Addition Dear Mr. Mittelstaedt: The City has completed a review of your after-e�t t application for your garage addition. Two problems prevent issuance of the buildmg p 1, 10' setback required to rear property line. The existing garage is 19.1' from rear which would allow for a 9.1' addition. Your addition is 11' 4" wide. 2. 10' setback required between structures. The existing storage shed is withi.n a few feet of addition. Please contact me and inform me of how I°�ust�rel uire an answer before April 5, 1994 e �e dealing with an after-the-fact application, q Sincerely, � `X/`r"`o'— L e Oman Building O�cial LO/lsv cc: Jeanne A. Mabusth, Building & Zoning Administrator Bruce L. Vang, Field Inspector Enc: Copy of Survey � Telephone (612) 473-7357 • FAX 473-0510 �o� o�:., o � � ,T , CITY of ORONO ,� ;r�°�r�:� �►,' a�� ti , M��,� ot��� � �:: .-- �� � � �.��.��� ti ' �-'!r � Street Add�ess: a �,„������ G Maiiin Address: 't � '�°�;,� � P.O. Box 66 9x���� 2150 Kelley Parkway Orono, MN 55356 Crystal Bay, MN 55323•0066 August 31, 1995 James M' 3468 Lyric Avenue Wayzata, 1 55391 , RE: Building Permit Application Dear Mr. Mittelstaedt: On June 1, 1994 this office issued an after-the-fact building permit for an addition to your garage. As you may recall, the addition was too close to the property line and was required to meet a 10' setback. As of this date, an inspection to verify this correction has not been requested by you. This letter is to notify you that the review of your recent application for a deck will not be completed until corrections are made on the previous building permit. If you have any questions, feel free to contact me at my office. Sincerely, .��— Lyle Oman Building Official LO/lsv cc: Jeanne A. Mabusth, Building & Zoning Administrator Bruce L. Vang, Field Inspector Telephone (612) 473-7357 • FAX 4'73-0510