Loading...
HomeMy WebLinkAbout2000-P03019 - new septic PERMIT G{I T�t` O F O RO N O Permit Number: 2750 Kelley Parkway - PO Box 66 P03019 Crystal Bay, Minnesota 55323 Permit Type: sept�� (612) 249-4600 Date Issued: 9i26i2oo SITE ADDRESS: 1250 Lyman Ave WAYZATA,MN 55391 PID: 35-118-23-34-0015 DESCRIPTION: Proposed Use: Residential Permit Class: General Permit Type: Septic Permit Sub-type(s): New Septic System DETAILS: Approved per resolution#: Separate permits required: NOTICES/REMARKS: FEE SUMMARY: Permit Fee: $ 100.00 Valuation: $ 0.00 State Surcharge Fee: $ 0.50 TOTAL FEE: $ 100.50 APPLICANT: CLOVER HILL COMPANY OWNER: G MARC WHITEHEAD ET AL 314 SHAKOPEE AVE E 38 ADDRESS UNASSIGNED SHAKOPEE,MN 55379 MN 00000 THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE THE REAL IMPROVEMENTS SPECIFIED AND AGREES TO DO ALL WORK IN STRICT COMPLIANCE WITH ALL CITY OF ORONO ORDINANCES AND STATE OF MINNESOTA BUILDING CODE REQUIREMENTS. 1 � , 7EI�1l�G�./ � � � ,, � APPLI ANT PERMITEE IGNATURE UED B -SIGNATURE Copies: City,Applicant,Assessor, Finance Page 1 � . CITY OF ORONO � SEP'TIC SYSTEM PERNIIT APPLICATION Box 66(2750 Kelley Parkway) Crystal Bay,Mn 55323 ���'NccK (,!/Uv c.i S JOB SITE ADDRESS �o'"� .Z /3/�c lc iL �25� `5/�YIl+F`I /�-V�, Occupancy Type: Residential�_ Commercial Other Permit Type: New or Replacement System $100.00 # jOD . �d Repair Eaisting System $ 50.00 (Tanks or Drainfield) $0.50 State surcharge added to above fees * See fee schedule for non-residential permit fees Owner's Name: LQ Uev- �7 dvvte S, ��� Phone Number• Mailing Address: City: Zip: Contractor's Name: �v Z�- ��// �, Phone Number: 6/2-��S�- y� �/� �� Mailing Address: ?�Y .Sk��,��P l�ve E City: S� � �c Zip: S'��3 ?cl *** DO NOT MAII�PAYMENT`ti'ITH THIS APPLICATION*** GENERAL INSTRUCTIONS 1. Applications for septic system permits may be mailed or submitted in person at the City Offices; however, permits will not be mailed out. The permit must be picked up in person at the City Offices and work must not begin unless the permit card is on the job site. 2. Permits will be issued only to contractors holding a Minnesota Pollution Control Agency(MPCA) Septic System Installers License. 3. All work must be done in accordance with the approved septic system design. Design reports are not considered approved unless accompanied by the "City of Orono Septic System Approval" cover sheet signed by the City Inspector. 4. The following inspections will be required for all septic systems: A Pre-installation site inspection to include inspector, installer, an�l general contractor. B. Tank installation prior to covering. C. Drainfield trench installation prior to covering. For mounds, inspection is required after rough up but prior to sand placement(sand will be jaz tested for silt content), and again during pressure distribution pipin� installation in the rock bed. D. Final inspection to verify proper final cover depths and to verify that all pump stations (where required) components are functional and comply with codes. 5. Individual holding�IPCA Installers License shall be present during all inspections. A 24-hour notice is required for all inspections. ti NOTE: Applicant must initial all spaces. Fill in all appropriate blanks and check all appropriate boxes. 1. I have received a copy of the system design including the City of Orono Septic System Approval Cover Sheet. 2. I will be installing the following: ���-w�1�► A. Tanks: '� Precast Concrete Other Manufacturer �rcc�s�` Tank Capacities: 1) / �� al. 2) t 3 �� gal 3) ► 3 uv gal B. Pump Sta.tion(if required) Pump make&model Jtite��-s �t E `�v (attach pump curve& literature); system desi�requires �/� gpm at /S' feet of head. High water alarm make&model �;-�G�:. . Outside electrical work to be completed by installer�_electrician other. C. Treatment System: Trenches: s.f. �_ Mound Depth of rock below pipe " Rock bed dimensions /U ' x�' Drop Boxes Sand bed d'unensions�' x��' Distribution Box Pressure Dist. Pipe Diam. I`�Z " Manifold Pipe Diam. 2 " " D. Final Cover/Topsoil to be: � borrowed from site (show location on site plan) trucked in The undersigned hereby applies to the City of Orono for issuance of a septic system installation permit, agrees to do all work in strict accordance with ordinances of the City and the regulations of the State of Minnesota,and certifies that all statements made on this application are complete,true and correct. Signature of Applicant U���-� I` v�"- Date: 9'2-6 " GY� MPCA License No. �-� Stat�'Review: Approval Denial t ��� Reviewer: Date• < '�6 Reason for Denial: T �� ,� � � SEPTIC SYSTEM APPROVAL ' O - , '�ISPECTOR'S C�pY INSPECTOR'S COPY � � � Q �`'s�r-�.� ,� � � , � CITY of ORONO �`�x°R,��.�py �r Municipal Offices �� . ' G~ Street Address: Mailin Address: e9 4�,�' S �= -�ESI;�-�'� 2750 Kelley Parkway P.O. Box 66� - --''� Orono, MN 55356 Crystal Bay, MN 55323-0066 Owner�.�l+�t/� 7-�c�s, �1 h�, Phone (Home) (Work) Address J�25C� Ly;�rw� I?Ver�u�., City L�/'�y 2.�f� State /n� Zip 55��'� I Site Evaluatar --P �1�Psf�� State License #� Phone# y97-•35 E�(; Type of Establishment: Single Family SC Multi Family Commercial /�,��,'� Garbage Disposal Yes�_ No No. Potential Bedrooms � Est. Gallons Per Day b�� Water Meter Required: Yes No� Soil Sizing Factor . $3 � ,�{S x� F't�� Perc Rates P-121,� P-2 3� ] P-3 15� 1 P-4 y:9 P-5� P-6 j�',5 -7!�I, , �t:8'� t 5.,5� Restricting Layer Depth B-11� B-2 (b" B-3� B-4� B-5 �" B-6� Type of Treatment System: �A!�' Z�41?`= ,�:� i'�" �{,, ltir� s.� C�" Standard X. Experimental Alternative Pressurized Mound System x At-Grade System Gravity Trenches System Pressurized Trench System Gravity Trenches W/Lift Pressurized Bed System Holding Tank W/Alarm Septic Tank Size 1 Q e� # of Tanks � Lift Tank Size (��� Pump Brand -- GPM �{p Head i$ ' Treatment System: Minimum (�o'XS's`� 4?�f g�7` Square Feet with�inches of rock below pipe Type of covering Fabric X Other THIS IS NOT A PERMIT. This is a design approval form which must accompany the site plan. A permit must be issued to a licensed septic contractor prior to installation. NOTICE TO INSTALLERS: Any changes to the approved plans must have prior approval of the inspector (249-4600) Call for inspection 24 hours in advance. ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain in place until final site grading. Approval to pour footings will not be granted until the Inspections Department has verified the primary and alternate sites are protected. NO VEHICULAR TRAFFIC OF ANY HIND is allowed within 20' of tested drainfield sites ever. ACCEPTED � DENIED By the City of Orono subject to existing regulations and thefollowingconditions: LtSc-` �n;,�;mu�n o�' �c� `` W�snec� s�wu� d-elO�J Ga�l .L Pdq.�, F ro G`. !11�-t v�+r�� 2 c.'�' S F r�a-ck f o ( �� �-�� l�`��s. �— By: �� ' -a�-� '�t��iS'i D�GMED f0l( Chris Pence, On-Site Systems Manager .,�.,�o�oo�. �nr nuc�asf n��uMs� �e�rowov�s��s tHrs�s� `�����-o� --� ����,-1 I��� 3 — 13�-� ���� ( f����kS �0 3019 �q��`�oo� � �G 1� C'�o i�' Telephone(612)249-4600 • Fax(612)249-4616 �`e i I P��� ��2- ��o-,�r�v �io<<- � �3�lrt��) . , � � ,, �� c�� � f _x�7�P TES TIMG� I�C. Steven B. Schirmers • MPCA Cert.No. 627 951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 FAX (612)-497-5011 State License#394 September 5, 2000 Lauer Homes, Inc. Lot 2, Block 1 Lyman Woods Orono, Henn. Co., MN This site was originally tested in November of 1990. The sites were re-evaluated and the mottled soil depths were verified in the soil borings by compieting soii probings at the original soil boring locations. Two additional soil borings were completed #5 &6 due to the lot line changing since the original design. This on-site sewage treatment system is designed for a Type 1, four bedroom home, in accordance with the Minnesota Poilution Control Agency Chapter 7080 and I�al ordinances. The soils on this site are SCS soils mapped - EnC - Erin loam. The seasonally saturated soils were located at 12" to 18" (redox features). Due to the seasonally saturated soils, a Pressurized Mound System will need to be installed to treat septic effluent. The bottom of the rock must be tocated at least 3' above the saturated soils. The soils at a depth of 12" have a percolation rate of 21.8 mpi. A pumping chamber will need to be instalted to lift the eifluent to the treatment area. The power supply and switches must be located outside the manhole and pumping chamber in a weather proof enclosure. A waming device must be installed with a light and sound device, this is in case of a pump failure. 1 ' . . �. r � The manifold and supply line pipe must have back drainage to the pumping chamber. The distribution pipes shall have their ends capped. Be sure the rock and sand fill material are clean. The sod layer below the entire mounded area must be tumed over, just break up the sod, be sure not to over work. All neighboring wells are located greater than 100' away from the proposed treatment area. Keep all heavy equipment off of the proposed treatment area before and after construction. The treatment area shoutd be marked off before constru�#ion. This Design is not valid & the system will need to be relocated if failure to protect the areas proposed for On-Site Sewage Treatment occurs. With proper installation and maintenance, this system should have no problem in treating septic effluent effectively. Nothing other than human waste, toilet tissue, laundry, showers, water softener etc. should be disposed of into the septic tanks. !ron filters must be diverted out of the system. Garbage disposa�s are not recommended, due to adding more solids 8�fine solids passing through to the system. Excessive amounts of soaps, anti-bacteriat soaps, cleaning agents & ch{orine agents may kil!the bacteria needed to treat septic effluent. Additives are not rec�ommended. Recommend to pump &clean your tanks through the manhole by a certified pumper every 2 years. Check with your pumper to set up a schedule. C�""—�• � Steven B. Schirmers 2 - �^ '— �;� �:is� � 1')�J� 55'� RcLI�- R�p y� _ — � �. 1 i (7 j Z,� - c, � a ,1 -3.7 -CoQ oF_sRuv '-1,a' F\�-�. 9_ °t 9,a � � /,'� S z}�o QLA1..� �/1'�� c�aj� I ��� _� SET- BACKS �� . i o a� � HOUSE Sysiem must be� Tank $o� from property lines x - S��-��d� 6��S�� w�oT�_, �. '�s'�- � , .�' from wells ����`�n�'� 3� from b!dgs. , .r���.� � ����� - uu Treatment orea = from lokes , .�. s+reems Treotment oreo a�� from property lines NOTE�Power supply ond switches must be locoted in o MA�NF�Dc.ES +.++.�.� ►�." oo �from we!Is`��'�-�"'�-' W�ther proof encbwre outside the pumping chamber and manhole � tiacrF,« t--, ���.xso ;; � ao �from bidgs. �� � [� from trees � SOIL BORIhG ELEVATIONS � t� � ' - I��� '11-}_"�-�1'��.� �c�min. � ' � a 1 l�`I A- q��•�I - ,� - • TH. I EL.--���,.3 -r�•a� _ q��,.� . � a dia.su 1 � 9�e s a�o TH. 2 EL.-�:��.� �IN�3A - ���.y Tank � Tonk � �O �s TH'�3EL.-��� �U ��- ��".' Orop to Tank I PRESSURE DISTRIBUTION MOUND 5YSTEM -�N'"5A: ���'�r,c Th"4 E�- �°� '� �� � L-f��+-�'�'✓s�- ��A�,�'v�..v. a ,.. Min. I io S '�p�mp��9 TH. 5 EL.-��= Max.l��to4� � ��P S'�R�-1�S SH�A�L.oc�J Chamber El.n/AT10V ot PRO�OSED PtlMPING 4�to 6��dia.pipe CHAMBER-�����=Y�,��,�,�- �°��.o t''�Fe'ScS*:�.-� �(b'P D'� "C3Wt�1L-J�/L•S SYSTEM DESIGN -MOUND � Y�o�os��.:= �ow�s-t sLon� -- ioo�.S TYPE-�, � BEDROOM , Ave�oge percolotion rate a�•� min./inch (design.83sq.ft treatment orea pergol, of doily sewage flow) ' 0o gal./day x.83sq.ft.�gal. `��`d sq.ft.of treatment urea +10%= s`�� sq.fi. (.= IOff.width= 55 ft.lenqth of bed area+side slope run�.to t x `�_� height= �fi.x�ft.larm•area needed)���- Clean rock needed- �2_sq.ft.treatment area x �•�s� depthof rock= s�` cu.ft=27=�Lcu.yds.(3/4��fo 21��dia. ,includes 2��of rock above pipe) �a�ti. s�rs,o ��� �,.o ��`'� Cleon sond fill below rock needed�.�cu.yds. approx. , sa bam bock fill a-'� ppro ,, p � Cu.yd._'P"�f-oMM'�T'�Q_'f0_Flvv. `l0°70 -fo -foQso,L `�S G�.�vs -W�SN,� ndy a.yds.a x to soil 6��_� , Number of tanks required�—, Ist tonk /000 gol. ,2ndtonk ��o gal.minirrxms pWs P�-1mP►N�..� �-1i'►amp�R-- _ _ ___ _ _ _ _.�t.�,"_�oas�f�t�= t�" �i.t-t_�.� Pumping chamber capocity- 25% of daily sewage flow of ��o gol.= � � gal.+reserve slorage of 15 Oc�],/B��s2 gal.+pipe bock droinage— PROPERTY CF: �-�v ""� '--��T'�`> >}' of�_gol./IOOlin.ft.of�Mdio. supply pipe, lin.ft.needed �� , �gal.+ manrfold1�gal./IOOlinftof a��dia.pipe,ln.ftneeded=� , � gol. ,�o,� a .���� � T,,�,�t �N���S ; total capocity needed�gal.(Plus area for pump) �S� rn,r,. IaSO gal.caP. �-.�:��.s :_ ���� `.��; �`;:�. , �'_�� . � - � Distribution pipe �.��da. , �_lin.ff., ��._�dia. perforations '�> ��aporf ; Pump size ��� hp. (pumpable capacityl�Lgol. 4cycles/day) �,�s�� IS � H�fao Pg.�ss ���5e_�I�°a-U� y D aa1 ) rr„n. S—P TEST/NG /NC. Note � When corulrucling bed �- , this areo shoutd be shaped Note= Distonce trom treohnent areo to neighborinq weus— � Desi ned 9 `'� �'"� '`'! - '� io divert run-off from entering treotment orea. �-�����'��= �'�1�-1a--� i r�o ' i 9 y� � � ' � � Dote��!/"_�/"_ , PH. 612-497-3566 . T y.,,�.. ,. ^� .�y .:�?�r � � ' ���� ,�n�� ' �- �•-o,; - `�`7y•'� ���5-, \ ``_`_�� -y .( �1�l 1� . , ` �,'�'\l-V J ��. . . �y ��_.,� � /., '_ ��,y �,. .�,� �. � .'.. .n��y.\a- T .0 .�� , �� >. `e �\� 7' /[ d�S� �.- ��'� Y'�t�"Yo S'G'C� -�'2�f 1'�r�M��t rt' �. �'".`r}'' \' '°��� � , � , P�'� c��,, ��.�,'\\\ % ��+3 4 y,� o %� 1� q�i �� �'� �� ���s, 5°�5.9 �y� � ���� 1-�"� �*a� .�� � � � 1 5�1��,1 ��� r i9,. � �;.� � . � y,99�.0 J �, �\� , Pvti<<te�.� '9}��. �,�n,7' , . a r�'4'>-va =s a5�c`Goo.� � 7 '�- ,=F`��_ . r/�\ '`�ti;.�"-� _ =-J ", � , $3' �i�- a�'— �',, r5 � , � . �� �'���cK.h"v f- � 9^,a.�*� � % \� r� ' -c a l - _ _ __ R��.'1'9)�V �'�i � y`�=,.�� 9;-�.� 1 ��� _�--�'�`'--=--- - �.l�laml;�'e._• 7� . . �.�� 7-,-.. /%s "----�— i-t�_;o�o,�. � i»�.'� �� ' b�, �� W � � i� � � Si _ x\__3�� I 7- \ c'7�•L ,9 8.3,r�8.g � _� lA h ��\�. � �/ Y I i'1;.0 \ . ��B' 'F- i � � "./��� ' / ` \\ � I � '1�. " ' � � . 5��,��� . i�l�, / \ � � .�y p� � /' f 1 � - 5rj,� / � /' � \ �; � F+ �5 t.: � _ � .._ j - � ,� � __� _ i' �� . , <z x � �-_p� ,� F"<���,�� � ,�; ,,� � `+�..; \ �' ^ . . � � S � - • ��>.'_ , ��;, ,�, . / %uoan�� y �t }11�� , , x �Y at�,� � �y�� / 1'>a'�--�, i �,,, ,. �-)_ : h 9 / x • j/ � �'TF e'4o s3 r� ;,� _'� = �. _ � �' � No�15�_ __--- � � -� � � \_ ��� � � ,� � . � �� �, �� � � ��` ����`. �� -� � � � �.,�c t..��- " , , �' / � '� ; � , � _._ - ' " ; , _ � - —..............�_ao�,�� � ' _ I , --__.. ; _ � ,_ ,/ _ __ C�'F�'_O����ONO I SFPTIC �q ' ,> ,,,. � � -_; �t, ; �:.:� ---,����-����f�FCTOR R C-+awJPLAN-R�YIEW 1� / `�- loo P�ERrY CF: ' - .°�• �c,--�� . ,�.; ' �� �`,. �'E C�� :x � -, ��_� --�—•.�..��lotion Tests Scole� � � , , L s = s�-4� '�`��a� PERMIT NQ � =� �� _ }`'-i r�r�, � .;�_: . ,� �5�oi1 Borings - - _c:.�;'7�} - �,s . , 3 S� "�11`� �- �,-' APPROVFD AS SUBMtTTED g�tienCt: MOfk �.- +�, , � �.1.� y �. ,c ,, ' - � APPROVEp WITH CORRECTIOK�� ` `' ' �� -�9 i 1 S f � NOT APPROVEU.C'ORR Thcsc camments�for y p y r��U8A11�Note� This system is to be constructed to meet in fuil compliance w�ith d1 ������M lhe MinnesO�a Poliulion Confroi AgenCy � s-P rEs riNc in�c. Rcquirementsincludiniite�ps�o�ot�e����tAg�� Chapter 7080 & Local Ordinance KGEP THJS PLAN S$ ON S!T ��catlY uoted i�Wis ne�rip. Designed By: _ . > , , F Note : Check all un�ergr��r�'��lities po;o //,_/�_, �_6t2-497-3566 ' ,. ,, MOUND DfiSIGN WORKSHEET . . (For Flows up to 1200 gpd) A. FLOW �•a s.,�.�o,��,a,u«���� Estimated�$pd �d. "'« �°' �v°n �cy�m � or measured=x 1.5 �_. ANK LI UID VOLLTIv�S 4 � � �� �` B. SEPTIC T Q s �so ,�o zs, k , a -� o 0o gallosts . � � � rmio �° � : I tzoo an +oa � G SOILS (refer to site evaluation) ��"a,3,s�� 1. Depth to restricting layer a ��`+"_iztches_feet �� �...� «,.,,,«a `=�".� 2. Depth of percolatlon tests=_ �=�nches M«-- °�, �.•.�.r ��""" 3. Texture ��� �"'� Percolation rate a�•� mpi '�"' �� '� � 4. LAIld slope 5�� `���/o ��o �.-1 1�s�.d�, r.�«� �000 �000 � D. R .D 1. Multiply flow rate by 0.83 to obtain required area of rock layer: A x 0.83 = c�_oo_.gpd x 0.83 sq. ft./gpd = '-,.,,�� sq. h.-►-����o=sy� �, 2 Select width of rock layer(max 10' if<120 mpi ntax 5') = i=ft. 3, L,ength of rock layer=azea+width a � � � $q• � 1-- � , • � � + o ft. = S ft, . . Width• �=ft . � <120mpi<10' un s� fr E. ROCK VOLUMfi >120mpi <S' 1. Multiply rock area by rocic depth to get cubic feet of rock;�sq. ft. x ���s' ft._�cu. ft. 2. Divide cu. ft.by 27 cu. ft/cu. yd. to get cubic yards; �,cu.ft. +27�, a � cu. yd. 3. Multiply cubic yards by 1.4 to get weight of rock in tons; �•� cu. yd. x 1.4 ton/cu.yd. � tons. F. ABSORPTZON WIDTH Abeepdaa VYldta Slsin�Zlb1e 1. Percolation rate in top 12 inches of soil is ���, , mpi ��;�� ��,��. �,� �� Texture u��r u,�a-v�. c��i �•� ure� �.��e..o,i cx.�+.a.va iso i.00 a�a s s..a �.to i.00 ,2, Select allowable soil loadin rate from table; a�p s �� a•� �� � g • i�»'�o =�i,e.m�0"" o so ioo . �.�_ gpd/ft� �ab0 �t� 0,�3 167 3. Calculate adsorptton width ratio by dividing rock layer ��''"�120 � '° `:0 loading rate of 1.20 gpd/ft2;by allowable soil loadiag rate; 1.20:gpd/f�+j`��.:gpd/fts= � a.� � . 9:. � Multiply adsorption width z�atio by rock layer width to get � zequired adsoiptlon width; -�,c� x_��_,_ft=�,2�t ' .. ,� � G. �OWNSLOPE BERM WIDTH �'°��- �°"�'' 1. If landslope is 1% or more, ,. subtract rock layer width from adsorption width '' ��.' . �N,� .-. 4 • �� � �ROG�C 1 J to obtain m�n;mum downslope berm toe a�s�,a � + �d.�► ft-�ft=��feet an�so;i -�s�� E-- � 6,r��� s o s o�;_ 2. Calculate Minimum mound Size a. Determine depth of clean sand fill at U���wa�n �`"rdr� upslope edge of rock layer: o d� Absocpaon wdrh Separation 3' - i. 3 ft= J • � feet `�' b. Add depth of clean sand for separation (2a) at upslope edge, depth of rock layer (1 foot) to depth of cover (1 foot) to find the mound height at the upslope edge of rock layer; l.� ft+'lft+ lft=�.?feet _ � '_ c. Enter table with landslope and upslope berm �. up��w�ac� ratio. Select berm multiplier of 3•�3 � ;, ��,�,, Upslope wdth �a..e'..�a��"i K� ?a.�aYQ,:a Ups� �dth d. Multiply berm multiplier by upslope mound � 11 .��� ��A�< w,arn o �4 Q�Q�,bw; _� height to find upslope berm width: ya : � ;: �o�d'- � �' d••a�'v��'^a; ` �4 � � � �r u . 3 .o S x 3.� _ / � feet 8� � " '" ' � ��.,• .� . :� � . 4. e. Multiply rock layer width by „ : `. � . �.. � .., landslope to determine drop in elevation; �° ' �����a� �c�x r %+ 100 = - � feet � _,: ,. ... ; ; .,:.:.: .: ; .:�.� : f. Add depth of clean sand for slope ro����Z difference (2e)at downslope edge,to the mound height at the upslope edge of rock layer (2b) to find the downslope height; ; .� ft+ :5'� ft= y.2 feet g. Enter table with landslope and downslope berm ratio. Select berm multiplier of 5.o ' h. Multiply berm multiplier by downslope mound height to get downslope berm width: �_x '- .z = a ► feet B�si.orE Mvi.��s i. Compare the values of step G.1 1 '� and Step G.2h a 1 �d e��p�r�No� n�m� pa�°%.�� Select the greater of the two values as the �� ���htl� n�:��ti� downslope berm width; � 1 feet j. Total mound width is the sum of � � s� � � � � � � '� � upslope berm (G.2d) 0 3.o a.o s.o 6.0 �.o s.o a.o s.o b.o �.o s.o 1 3.09 4.17 5.26 6.38 7.53 2.91 3.85 4.76 5.66 6.54 7.4I width plus rock layer width (D.2� 2 3.t9 4.35 5.56 6.82 8.14 2.83 3.70 4.54 5.36 6.I4 6.90 plus downslope berm width(G.21�; 3 3.30 4.54 5.88 7.32 8.86 2.75 3.57 435 5.08 5.79 6.45 �_ft+�cZ ft+�_ft= -Z � feet 4 3.41 4.76 6.25 7.89 9.72 2.68 3.45 4.1� 4.84 5.46 6.06 iC. Total mound length is the sum of upslope 5 3.53 L5.�607 6.67 8.57 L0.77 2.61 3.33 4.00 4.62 5.19 5.71 berm width(G.2d) plus rock layer length(D.3) 6 3.66 s.26 �.ia 9.38 is.m Z.sa 3.� 3.ss a.ai 4.93 s.ai plus upslope berm width (G.ZC��; 7 3.80 5.56 7.69 10.34 13.73 2.48 3.12 3.70 4.23 4.70 5.13 1 I ft + SS ft+�_ft= �� feet $ 3.95 s.ss 8.33 ii.sa is.9i Z.az �3;os�� s.s� a.os a.a9 a.sa a � „C S � � �j� 9 4.11 6.25 9.09 13.04 18.92 236 2.94 3.45 3.90 4.30 4.65 !0 4.29 6.67 10.00 15.00 2333 2.31 2.86 333 3.75 4.t2 4.44 Fina1 Dunensions. 11 4.48 7.14 ll.11 17.65 30.43 2.26 2.78 3.23 3.61 3.95 4.26 12 4.69 7.69 1230 21.43 43.75 2.21 2.70 3.12 3.49 3.80 4.08 ya X �� AJ�= , � PUMP SELECTION PROCEDURE A. Determine pump capacity: Gravity Distribution 1. Minimum suggested is 20 gpm 2. MaXiIIltlm SuggeStEG�i5 45 gpII1 perforaHon Disehuges in GPM Head Perforation diameter ' Pressure Distibution p� ��� 3. a. Select number of perforated laterals =S �/s2 �/4 b. Select perforadon spacing= -�� fee� �.oa o.56� 0.74 c. Subtract 2 ft.from the rocic layer length. 1.5 0.69 o.w . 20b 0.80 1.04 ,�����,,-2 ft.= S,_� feet. • d. Determine the number of spaces between perforations. a Use 1.0 foot single homes. Lellgth Pezf.spSCiri$_,��ft.+ �,ft._�spaces b Use 20 feet for anything else. e. �spaces+1 =�perforationa/lateral f. Multiply perforations per lateral by number of laterals to �1 y �r get total number of perforations. � x ��= 5�� perforations. g. � x��y =.�-�gpm. SELECT'ED PUMP CAPACTTY. LI O gpm B.Determine head requirements: 1. Elevation difference between p p and point of discharge. �feet 2. If pumping to a pressure distribution system,five feet for pressure ������+�Sr�� required at manifold if gravity system,zero. a��.�o� �;�,_, � feet ����+aen 3. Friction loss � a. Enter friction loss table with gpm and pipe diameter. ��,����tt Read friction loss in feet per 100 feet from table(F-14). �'�` ------- -- - F.L._�ft/100 ft of PiPe . .__. �.,�-,_, ..-------- , , � b. Determule total pipe length from pump to dischazge --------------------------- point Estimate by adding 25 percent to pipe length for fitting loss,or use a fitting loss chart(F-15 feet). Equivalent pipe length-1.25 times pipe length= s� x 1.25= (o:� feet Friction Loss in Plastic Pi e c. Calculate total friction loss by multiplying Nominal P friction loss in ft/100 ft by equivalent pipe length. pipe dia. Total friction Ioss= �•lo� x�_+100=_�feet �oW�� 4. Total head required is the sum of elevation difference, �� 1.5" 2" 3" special head requirements,and total friction loss. 20 2.47 0.73 0.11 �--+ r +�- 25 3.73 1.11 0.16 ' (1) (2) (3c) 30 5.23 1.55 0.23 35 6.96 206 0.30 TOTAL HEAD �.�feet `� 8.91 264 0.39 45 11.07 3.28 0.48 50 13.46 3.99 0.58 C. Pump selection 60 5.60 0.82 � 65 6.48 0.95 70 7.44 1.09 1. A pump must be selected to deliver at least � � gpm (Step A) with at least �s feet of total hea�i (Step B). L-lj � , CERT,�FICATION � 00627 Logs of Soil Borinqs Location or Project Mar . wri h _ad. 1220 Lyman Ave. Lot 3l Orono � Bori:zgs made ,by S�-P Testinrg, Inc. Steve Schirmers _ Date 11-8-90 Classifiction System: AASHU ; USDA-SCS X ; Unified ; Other • Auger used (check two) : Hand X , or Power , Flight , or Bucket X Depth, Boring number 1 Depth, Boring number 2 in in feet Surface e.3evation 995. 3 feet Surface elevation 996 . 9 0 - 0 - Topsoil dark brown loam Topsoil dark brown 0 - 8" � _ 10„ loam 1 - Gray brown loam 1 - Brown clay loam 8" - 1 ' 4"-MOTTLING 10" - 1 ' 4"-MOTTLING Rusty olivz brown clay loam 2 _ Rusty olive brown 2 _ 1' 4" - 2 ' clay •loam strong 1 ' 4" - 2-1/2 ' Rusty olive gray clay loam strong 3 - Rusty olive gray 3 - 2 � 3 � clay .laarn strong Rusty olive gray 2-1/2 - 3 8 3 ' - 3 ' 10" loam 4 _ Rusty olive gray 4 _ loam Rusty olive gray 3 � 8�� _ 4 � 8�► loam 3 ' 10" - 5 ' 5 HIT ROCK 5 HIT ROCK 6 - 6 - 7 - 7 - g - -- g _ . rnd of boring at 4 ' 8" feet. End of boring at 5 ' fe�t. Standinq water table: Standing water table : present at feet of depth, present at feet of depth, hours •after boring. hours after boring. Not present in hole X Not present in hole X � . Mottled soil : Mottled soil : Observed at 1 � 4�� �eet of depth. Observed at 1 � 4° feet of depth. Not present in hole Not present in hole Comments : Comments : L-13 ' . CERT.ZFICATION � 00627 Logs of Soil Borinqs Location or Prqject Marc Whitehead, 1220 Lyman Ave. , LO� � Orono � Borings made by S-P Testinq, Inc. Steve Schirmers Date 11•-8-90 ' Classifiction System: AASHU ; USDA-SCS X ; Unified ; Other Auger used (check two) : Hand X , or Power , Flight , or Bucket X Depth, Boring number 3 Depth, Boring number 4 in 995 . 8 ln 995 . 3 feet Surface e.3evation feet Surface elevation 0 - p - Topsoil dark brown loam Topsoil dark brown loam 0 - 8" � _ 8�� 1 - Gray brown loam 1 _ Brown clay loam 8" - 1-1/2 ' -MOTTLING 8" - 1-1/2 ' -MOTTLING 2 - Rusty olive brown 2 _ Rusty olive brown clay loam clay loam strong 3 - 1-1/2 ' - 3 ' 3 _ 1-1/2 ' - 3 ` Rusty olive brown Rusty olive brown loam clay loam 4 - 3 � 4 � 4 - 3 ' - 4 ' 2° HIT ROCK HIT ROCK 5 - 5 - 6 - 6 - 7 - 7 - g - -- g _ . End of boring at 4 � feet. End of boring at 4 � 2�� fe�t. Standing water table: Standing water table : present at feet of depth, present at feet of depth, hours �after boring. hours after boring. Not present in hole X Not present in hole X , ' Mottled soil : Mottled soil : Observed at 1_1/2 �feet of depth. Observed at1 -1 /? ' feet of depth. Not present in hole Not present in hole Comm�nts : Comments : , , �7�P TESTING� ��C. Steven B. Schirmers • MPCA Cert.No. 627 951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 FAX• (612) 497-5011 State License#394 LOGS OF SOIL BORINGS Lauer Homes, Inc. Lot 2, Biock 1 Lyman Woods Orono, Henn. Co., MN Borings completed on 8-29-00, with a hand bucket auger. BORING NUMBER 5- Elev.998.6 - MOTTLED SOfL AT 16" - no standing water present in boring. 0 - 8" Topsoil dark brown loam 10YR 3/2 8" - 10" Gray brown loam 10YR 4/2 10" - 16" Brown clay loam 10YR 5/6 16" - 32" Rusty brown ciay loam strong 10YR 5/6 - mottles 7/1,618 32" - 40" Rusty gray silty loam 10YR 6/2 - motties 7/1,6/8 40" - 48" Rusty gray brown loam 10YR 6/3 - mottles 7/1,6/8 BORING NUMBER 6- Elev.997.6 - MOTTLED SOIL AT 18" - no standing water present in the boring. 0 - 6" Topsoil dark brown loam 10YR 3/2 6" - 10" Gray brown loam 10YR 4/2 10" - 18" Brown clay loam 10YR 5/4 18" - 26" Rusty brown clay loam 10YR 5/6 - mottles 7/1,6/8 26" - 38" Rusty gray brown clay loam 10YR 6/3 - mottles 7/1, 6/8 38" - 48" Rusty gray brown loam 10YR 613 - mottles 7/1,6l8 L-1� � ,GERfi��IC11TI0N ;k 00627 Logs of Soil Borings Location or Project __ Marc Whitehead, 1220 Lvman Ave. ro 2 Orono =IIorir�gs made by S-p Testinq, Inc . Steve Schirmers Date 11-9-90 Classifiction System: AASHU ; USDA-SCS X ; Unified ; . Other Auger used , (check two) : Hand X , or Power , Fli ht g , or Bucket X Depth, Boring number la Depth, Boring number 2 � in 978 .4 ln 979 . 5 feet Surface e3.evation _ feet Surface elevation � Topsoil dark brown loam � psoil � _ 4,� dark brown loam 0 - 8" Brown loan Brown clay loam 4" - 1 ' -MOTTLING 1 - 8" - 1 ' 4" 1 Rusty olive brown clay loam 1-1/2 ' -MOTTLING Olive brown 1' - 1-1/2 ' 1' 4" - 1 ' 10"clay loam Rusty olive brown clay 2 2 loam strong Rusty olive brown 1-1/2 ' - 2 ' 8" clay loam strong 3 - 1 ' 10" - 3 ' 2" 3 - Rusty olive brown clay Rusty olive brown clay 2 � g�� - 3 � 4�� loam 3 ' 2" - 3 ' 8" loam 4 - 4 - Rusty olive brown Rusty olive brown loam loam 5 - 5 - 6 - 3 � 8�� _ 6 � 6 ` 3 , 4„ _ 6 , 7 - 7 - 8 - -- 8 - - rnd of boring at 6 ' feet. End of boring at 6 ' feet. Standing water table: Standing water table: prescnt at feet of depth, present at feet of depth, hours �after boring. hours after boring. Not present in hole X Not present in hole X � . Mottled soil : Mottled soil : Observed at 1-1.�2feet of depth. Observed at 1 � feet of depth. Not present in hole Not present in hole Comments : Comments : L-13 • , .CERTIFICATION � 00627 Logs of Soil Borin s Location or Project Marc Whitehead, 1220 Lvman Ave. Lot�_ 2 �rono � Borings made by S-p Testinrg, Inc . Steve Schirmers _ Date 11-9-90 Classifiction Sy,stem; AASHU ; USDA-SC5 X ; Unified ; Other Auger used (check two) : Hand X , or Power , Flight , or Bucket X Depth, Boring number 3 A Depth, Boring number 4 � in in feet Surface e.3evation g77• 4 feet Surface elevation 976 . 3 � Topsoil dark brown loam � - Topsoi ar rown oam 0 - 8" 0 - g" Gray brown loam Gray brown loam 1 - 1 ' 2"-MOTTLING 1 - 1' 4"-MOTTLING 8�� _ 1 � 4�� 8" - 1-1/2 ' Rusty olive brown clay 2 Rusty olive brown � 2 - 1-1/2 ' - 2 ' 4" loam clay loam Rusty olive brown clay loa 2 ' 4" - 2 ' 10" stron 3 - 3 - Rusty olive brown clay 2 ' 10" - 3 ' 4" loam 1' 4" - 3 ' 8" 4 Rusty olive brown - 4 - Rusty olive brown loam loam 5 _ 5 _ 3 ' 4" - 5 ' 3 ' 8" - 5 ' 8" HIT ROCK 6 - HIT ROCK 6 - 7 - 7 - g - -- g _ . �nd of boring at 5 ' 8" feet. End of boring at 5 ' feet. Standing water table: Stancing water table: present at feet of depth, present at feet of depth, hours -after boring. hours after boring. Not present in hole X Not present in hole X � . Mottled soil : Mottled soil : Observed at 1 � 2�� feet of depth. Observed at 1 � 4�� feet of depth. Not present in hole Not present in hole Comments : Comments : L-13 � . .CERTIFICATION � 00627 Logs of Soil Borings Location or Project Marc Whitehead, 1220 Lvman Ave. Lot 2 Orono � � Bor3ngs made by �-P Testinct, Inc. Steve Schirmers Date 11-9-90 Classifiction System: AASHU ; USDA-SCS X ; Unified � ; Qther Auger use�l (check two) : Hand X , or Power , Fli ht • g , or Bucket X Depth, Boring number 5 Depth, Boring number 6 in 978. 3 ln 98Q.0 i feet Surface elevation feet Sur ce elevation � Topsoil dark brown loam � Topsoi dark brown loam 0 - 8" 0 - g�� Gray brown loam Br �oamla�" 1 ' -MOTTLING 1 - 8" - 1 ' 2" 1 - B Wloa�a�' 2'" - 1 ' 8"-MOTTLING , Olive 1 , 8„ _ 2 , bro�n �lay � 2 _ oa 2 _ Rusty oliv brown Rusty olive brown clay clay lo m ;� 2 ' - 2 ' 8" loam / 3 - 3 _ f Rusty olive brown ��� loam w/traces of 1 ' - 3j 10" 4 - sandy loam 4 - � Rusty olive brown 5 _ 5 _ andy loam 2 ' 8" - 6 ' 3 � 1p�� - 6 � 6 - 6 - 7 - 7 - 8 - -- 8 - . End of boring at 6 ' feet. End of boring at 6 ' feet. Standinq water table: Standing water table: present at feet of depth, present at feet of depth, hours �after boring. hours after boring. Not present in hole X Not present in hole X � . Mottled soil : Mottled soil : Observed at 1 ' 8" feet of depth. Observed at 1 ' feet of depth. Not present in hole Not present in hole Comments : Comments : CERT. #00627 � _. . PERCOLATION TEST DATA SHEET • a.m. Percolation test readings made by S—P Testing, Inc. o�11-9-90 starting a� 8 � 21 p.m. 1220 Lyman Ave. , Lot � 1����� 11-8-90 Test hole location , Hole number ,Date hole was prepaze�i Depth of hole bottor„ 12� inches,Diameter of holP 6 inches Soil data from test hole: Depth, inches Soil texture 0 — 8" Topsoil dark brown loam 8" — 12" Gray brown laam Method of scratching sidewall K n i f e Depth of gravel in bottom of hole 2 inches .. 11-8-90 1: 00pm 12 Date and hour of initial water�llin,g ,Depth of initial water fillino , inches above hole bottom Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Au t�ma t i r c i nh nn ,Maximum water depth above hole bottom during test 6 inches Time � Percolation Time interval, Measucement, Drop in water rate, Remarks minutes inches level,inches minutes per inch ' 8 : 10 refill 6 8 : 21 8 : 51 " 1-3 21.8 30 min 8 : 58 9 - 2 " " " � " " 9 : �� �� �� • �� �� _ � Percolation rate = 21• 8 minutes per inch. CERT. #00627 . , .... . PERCOLATION TEST DATA SHEET � S—P Testing, INc. 11-9-90 8 : 22 a•"'• Percolation tcst readings made by o� starting a� .m. Lot a wu«, Test hole location 12 2 0 Lyman Ave. ,Hole number 2 ,Date hole was prepare� 11—8—9 0 Depth of hole bottom 1? inches,Diameter of hole 6 inches Soil data from test hole: Depth, inches Soil texture � — L(�" T��.:sail c�ark hrawn laam 10" — 12" Brown clay loam Method of scra:ching sidewall Knife Depth of gravel in bottom of hole 2 inches _. Date and hour of initial wacer fillin,g 11-8-9 0��ep�►��itial water�lling 12 inches above hole bottom Method used to maintain at least 12 inches of water depth in hole for ai least 4 hours Automat'1C S iphon ,Maximum water depth above hole bottom during tesr 6 inches Time Percolation Time interval, Measurement, Drop in water rate, Remarks minutes inches level,inches minutes per inch � 8 : 10 prefill 6 8 : 22 8 : 37 " 4-1/4 3 .5 15 min 8 : 57 9 : 12 " 4 3 . 8 " " 9 : 30 9 : 45 " 3-15/16 3 . 8 � " " Percolation rate = 3 • � minutes per inch. CERT.#00627 � _.. . PERCOLATION TEST DATA SHEET ' S—P Testing, INc. 11-9-90 g ; 23 1;m: Percolation test readings made by o� starting at � r�„�� Test hole location 12 2 0 Lyman Ave.. Lot o'� �yole number 3 , Date hole was prepare� 11—8—9 0 Depth of hole bottom 12� inches,Diameter of holP 6 �nches Soil data from test hole: Depth, inches Suil texture 0 — 8" T��soi1 dark br�wn 1 �am 8" — 12" Gray brown loam Method of scratching sidewall ����e Depth of s;ravel in bottom of hole 2 inches Date and hour of initial water filling 11—8—9 0 ��ept6��initial water filliqg 12 inches above hole bottom Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatic s iphon ,Maximum water depth above hole bottom during tesr 6 inches Time Percolation Time interval, Measurement, Drop in water rate, Remarks minutes inches level,inches minutes per inch n n n n n ' a u Percolation rate = 15' � minutes per inch. CERT. #00627 � � ... . PERCOLATION TEST DATA SHEET Percolation test readings made by S—P Testing, InC . 11-9-9 0 8 : 24 `'�m' o� starting ar ,in. Lot � ��a�r, 1220 Lyman Ave. �. 11-8-90 Test hole location , Hole number ,Date hole was prepare� Depth of h�le bottom 12 inches,Diameter of hole 6 inches Soil data from test hole: Uepth, inches Soil texture 0 — 8" Topsoil dark brown loam 8" — 12" Brown clay loam Method of scratching sidewall KnifQ Depth of gravel in bottom of hole 2 inches . 11-8-90 �:OOp�m, , 12 Uate and hour of initial wa[er filling , epth o initial water filling inches above hole bottom Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Autr�m 1�i �' s irhnn ,Maximum water depth above hole bottom during tesr 6 inches � Time Percolation Time interval, Measurement, Drop in water rate, Remarks minutes inches tevel,inches minutes per inch �� �� �� �� n • n n I Percolation rate = 9 - 9 minutes per irr.'�. . CiRT. #00627 • ' � . PERCOLATION TEST DATA SHEET � a.m. Percolatior;test readings made by �—p R'PGt'lI1T�TI]r'- On 11-� n-an starting at 2• 4.5 p.m. IJnirl . Test hole location 12 2 0 Lyman Ave. Lot 2.��ole number 1�' ,Date hole was prepare� 11—9—9 0 Depth of hole bottom 12 inches,Diameter of hole 6 inches Soil data from test hole: Depth, inches Soil texture 0 — 8" Topsoil dark brown loam 8" - 12" Brown clay loam Method of scratching sidewall Knife Depth of gravel in bottom of hole 2 inches 11-9-90 12: 30pm 12 Date and hour of initial water�llin� ,Depth of initial water filling inches above hole bottom Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatie s iAhon ,Maximum water depth above hole bottom during tesr 6 inches Time Percolation Time interval, Measurement, Drop in water rate, Remarks minutes inches level,inches minutes per inch • 9 : 20 prefill 6 9 : 45 10 : 15 " 13/16 36. 9 30 min 10 : 22 10 : 52 " 3—/4 40 .0 " " 10 : 59 11: 29 " 3/4 40. 0 • " " Percolation rute = 3 9 .0 .,,inutes per inch. ' . � : . CERT. �00627 � , ' .. . PERCOLATION TEST DATA�HEET • ra m Percolation test readings made by �—P Test i nq, Tnc . on 1 1 -1 0-9 0 ctarting ar 9 : 46 ,i p,��, Idurr) Test hole location 12 2 0 Lyman Ave. Lot 2 �Hole number 2'� ,Date hole was prepare� 11—9—9 0 Depth of hole bottom 12 �nches,Diameter of hole 6, inches Soil data from test hole: Depth, inches Soil texture 0 — 4" Topsoil dark brown loam 4" — 12" Brown loam Method of scratching sidewall Knife Depth of gravel in bottom of hole � inches . Date and hour of initia]water filling 11—9—9 0 1V2ep����nitial water fillin,g 12 inches above hole bottom Method used to maintain at least 12 inches of water depth in hole for at least 4 hours Automatie siphon ,Maximum water depth above hole bottom during tesr 6 inches Time Percolation Time interval, Measurement, Drop in water rate, Remarks minutes inches level,inches minutes per inch • 9 : 30 prefill 6 9 : 46 10 : 16 " 1-5/8 18.5 30 min 10 : 2 3 10 : 5 3 " " �� � �� �� 11 : 0 0 11:3 0 " " �� • �� �� Percolation rate = 18'5 minutes per inch. ' . , ,� CERT. #00627 ' , � , ,. . _.. . PERCOLATION TEST DATA SHEET , S—P Testina, INc. a.11�. Percolation test read:ngs made by on 11-10-9 0 starting ar 9 : 4 7 �,4,«� . Test hole location 12 2 0 Lyman Ave. ��t. 2' �Hole number 3 � , Date hole was prepare� 11—9—9 0 Depth of hole bottom 12 inches,Diameter of ho(e 6 inches Soil data from test hole: � Depth, inches Soi!texture 0 — 8" Topsoil dark brown loam 8" — 12" Gray brown loam Method of scratching sidewall Kn.ife Depth of gravel in bottom of hole 2 inches 11-9-90 12 • 3Qpm 12 Date and hour of initial water filliqg ,Depth of itfitial water�lling inches above hole bottom Method used to maintain at least 12 inches of water depth in hole for at least 4 hours AutomatiC s iphon 6 ,Maximum water depth above hole bottom during tesr inches Time Percolation Time interval, Measurement, Drop in water rate, Remarks minutes inches level,inches minutes per inch • 9 : 30 prefill 6 9 : 47 10 : 17 " 2-1/8 14.1 30 min 10 : 24 10 : 54 " 2 15. 0 � " " 11 : 01 11: 31 " " " . " " . � Percolation rate = 14� � �inutes per inch. • _ , .. CERT.#00627 ` , �. , , _. . PERCOLATION TEST DATA SHEET ' S-P Testing, Inc. 11-10-90 9 : 48 �':m; Percolation test readings made by o� statting a� ._ . �durrl Test hole location 12 2 0 Lyman Ave. Lot 2 �Hole number 4 p ,Date hole was prepazedll—9—9 0 Depth of hole bottom , 12 inches, Diameter of hole 6 inches Soil data from test hole: Depth, inches Soil texture 0 - 8" Topsoil dark brown loam 8" - 12" Gray brown loam Method of scratching sidewall Kni f e 2 Depth of gravel in bottom of hole inches . 11-9-90 12:30pm 12 Date and hour of initial water filling ,Depth of initial water filling inches above hole bottum Method used to maintain at least 12 inches of water depth in hole for at least 4 hours AutomatiC siphOn ,Maximum waterdepth above hole bottom during tesL 6 inches Time Percolation Time interval, Measurement, Drop in water rate, Remarks minutes inches level,inches minutes per inch • 9 : 30 prefill 6 9 : 48 10 : 18 " 2-5/8 11. 4 30 min 10 : 25 10 : 55 " 2-1/2 12.0 " " 11 : 02 11: 32 " 2-1/2 12.0 � " " - - � . Percolation rate = 11• 8 minutes per inch. DATE TIME CITY OF ORONO CALLED IN i o-b� cD ` O INSPECTION OTICE SCHEDULED If���`� <d�3C� PERMIT NO. �1 _ COMPLETED I C• '�'G C� I C i�'IS ADDRESS �Z�� L�/Y�Ay7 �✓�� OWNER L�4+�C7Z �� CONTR. C��O✓CR f��t`I TELEPHONE N0. � DESCRIPTION /►��k �C� lL 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING � 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS h O 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q OS FINAL 14 SEWER HOOK-UP O6 PROGRESS � 07 DEMO-SITE 27 $ I 21 COMPLAINT J 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP 2 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL � 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL � OWNERICONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: ���� ��`' � 1��� a �l2 X�'7�� .�.�✓J �� .3 a + '/y �����, ���t � Orn i- , �C�L � z,� ��?,��,�� f�l C'r�� �� FP��� 0 � W � � �". p�- Q � z W � W � � d W WORKSATISFACTORY:PROCEED L" PROJECTCOMPLETE � ❑ CORRECT WORK&PROCEED - ISSUE CERTIFICATE OF OCCUPANCY W � ❑ CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑CORRECTUNSAFECONDITIONWITHIN HOURS. pHOTOTAKEN INSPECTOR WILL RETURN ❑ STOP ORDER POSTED.CALL INSPECTOR ' GTATION ISSUED ❑ INSPECTION REQUIRED.CALLTO ARRANGE ACCESS. Call f ne ins ction 24 hours in advance. 249-46�0 OwnerlCon rac r�on it • Inspector. White Copyllnspector's File Canary CopylSite Notice CITY OF ORONO CALLED IN q a 6ATd v p;��ME _� INSPECTION N TICE SCHEDULED �'Z?-� �2 � �� PERMIT NO. '�' � COMPLETED �-�7-ov �;OC� ADDRESS � Z 5 O �.�/y,�� �'1� OWNER �,64-v�(=7C �`�FD�-s CONTR. ��i?�����I� �(� ' TELEPHONE NO. 3�S^`��`�� � DESCRIPTION ��� �"t � � /'� l� 01 FOOTING 1 MECH NICAL RI 18 EXCAV/GRADING/FILLING � 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS � O 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q OS FINAL 14 SEWER HOOK-UP 06 PROGRESS � 07 DEMO-SITE AINT. 21 COMPLAINT Q 07 DEMO-FINAL 15 SEPTIC INSTALL. � 22 FOLLOW-UP = 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL � OWNERICONTRACTOR TO MEET YOU:_YES_NO � COMMENTS: � W a o — /30(� ct u 1�D�l �ARI���i rPC�.s�{ (c1yl C �'�� a � o . � W � Q � Z W � W � � d W� �WORKSATISFACTORY:PROCEED C, PROJECTCOMPLETE W ❑ CORRECT WORK&PROCEED f ISSUE CERTIFICATE OF OCCUPANCY O ❑ CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑ CORRECT UNSAFE CONDITION WITHIN HOURS. pHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR CITATION ISSUED C INSPECTION REQUIRED.CALLTO ARRANGE ACCESS. Call for e ne i spection 24 hours in advance. Z49-46�� OwnerlContr c r on i : Inspector. � White Copyllnspector's File Canary CopylSite Notice i � DATE TIME CITY OF ORONO CALLED IN INSPECTION NOTICE �j SCHEDULED Z-��-Q" ��=c � PERMIT N0. '�O '3O� I COMPLETED '�'�'CZ Il-�� �� ADDRESS I o1S0 Lvr��t� /Q�lc_ OWNER CONTR. �-lo�tr �-1;�� TELEPHONE NO. � DESCRIPTION S�� �.L F-n�� l� Ot FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FiLLING � 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS y O 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP O6 PROGRESS � 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT � 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP = 09 PLUMBING RI 23 EPTIC FINAL 35 HARD COVER REMOVAL � 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL � OWNERICONTRACTOR TO MEET YOU:_YES_ O � COMMENTS: � � � C� a — O�\a('%-� � �--v..,- da1�S � o ' � � 0 � W � Q � z W � W � j � ❑WORKSATISFACTORY:PROCEED ROJECTCOMPLETE W ❑CORRECT WORK&PROCEED ❑ I CERTIFICATE OF OCCUPANCY � ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECTUNSAFECONDITIONWITNIN HOURS. p pHOTOTAKEN INSPECTOR WILL RETURN �CITATION ISSUED ❑STOP OROER POSTED.CALL INSPECTOR ❑ INSPECTION REQUIRED.CALLTO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-460� OwnerlContractor on site: Inspector. �� White Copyllnspector's File Canary Copy/Site Notice