Loading...
HomeMy WebLinkAboutzoning disclosure o�'��o �„���,� Principal Dwelling Demolition Permit ���; ,�� ?` '��. ti ZONING DISCLOSURE & DECLARATION � ����� G� ��08� To the property owner: Demolition of the principal dwelling structure on a property may automatically terminate certain rights which may have accrued to the property by virtue of the continued existence of that building. • Rebuilding on a substandard lot of record (i.e. a lot that does not meet the zoning district required lot area or width standards) will, with few exceptions, require variance approval by the City Council, and such approval is not automatic or guaranteed but requires that a hardship be demonstrated. • Additionally, all current zoning standards will have to be met by the new principal dwelling including setbacks, lot coverage by structures, hardcover (impervious surface), height limits, etc. • Where municipal sewer is not available, provision of two (2) sites for a conforming on-site sewage treatment system is mandatory. • Unless specifically approved by the City, all accessory structures must be removed at the time of principal dwelling demolition.This also applies to seasonal and permanent docks,which may not be re- installed until a new principal dwelling has reached the framing stage. The fol lowing information is presented for the purposes of advising the property owner of the implications of removal of the rincipal dwelling on the pro erty: 1. Property Address: 225 Old Crystal Bay Rd. N. PIN# 33-118-23-31-0007 Required Lot Area 2 aC. Required Lot Width 200' 2. Zoning District: RR-1 B Actual Lot Area 5.2 ac. Actual Lot Width 175.61' Lot area variance is is not equired. Lot width variance is/'s not r quired. 3. Required Setbacks: Front 50' Rear 50' Side 30' Side Street Average Lakeshore Setback: must be me is not a licable. 4. Lot Coverage by Structures: limited to 15% of lot area/ oes not a 1 lot area>2 acres 5. Hardcover limitation • are a licable/ re not applicable. 0-75'zone= 0%allowed 75-250'zone=25%allowed 250-500'zone=30%allowed 500-]000'zone=35%allowed 6. Municipal sewer is available. ✓ Municipal sewer is not available; on-site system testing and design must be provided confirming that two conforming drainfield sites are available. 7. ✓ Wetland(s)present on adjacent property. Wetland is classified as"preserve". A 50' buffer from the edge of wetland and a 20' structure setback from the buffer is required. **Talk to Planning Department Staff for additional requirements. The undersigned property owner hereby acknowledges receipt of the above information. Staff Initials �� Property Owner's Signature Date Form ZDD—Revised 5-23-OS (Original: Street File; Copy: Property Owner)