HomeMy WebLinkAboutRe: as-built survey (survey not scanned-too large) C��,l
,
DATE TIME
CITY OF ORONO ZAjS^�� CALLED IN
INSPECTION NOTICE SCHEDULED � "�
PERMIT NO. ZOlS-004 F�5 COMPLETED
ADDRESS ��� �� ��-�- ��
OWNER TELEPHONE NO.
CONTRACTOR �
� DESCRIPTION ���y �� ���Y� �!�V �1�
tu ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL
Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING
O ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL
Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION
Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS
� ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT
Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP
W ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ FOUNDATION/REMOVAL
_
J ❑ DEMO-SITE ❑ SEPTIC INSTALL
� OWNERICONTRACTOR TO MEET YOU:_YES_NO
y COMMENTS:
� j 1'-�l�J
,
o �S�u�/f �,�r v��� r� f�z c� � �;�z� 4, ,��r�l��s
'' r��� �,'fra•�s a-� �/1 �5 -f���
�
0
�
Q _ � V�Q���'� I�Crs �'���1 �t's �a 1��'s ��'�
�
2
W
�
W
�
J
W ❑WORKSATISFACTORY:PROCEED ❑ PROJECT COMPLETE
� ❑CORRECT WORK 8 PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
W
O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN
INSPECTOR WILL RETURN
❑CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (J52� 249-4600
OwnerfContra r on site:
Inspector. � �
White Copyllnspector's File Canary CopylSite Notice
. , ..
Christine Mattson
From: Adam Edwards
Sent: Tuesday, November 29, 2016 8:40 AM
To: Christine Mattson
Subject: RE: 1180 Loma Linda Ave/#2015-00985
Chris,
The as-built appears to conform to the intent of the approved plan.
An inspector should conduct a site visit and confirm the following:
1.The survey accurately depicts conditions on the ground.
2.The site is stabilized to the point the any remaining erosion control can be removed.
Adam
From:Christine Mattson
Sent: Monday, November 21, 201611:25 AM
To:Adam Edwards<aedwards@ci.orono.mn.us>
Subject: 1180 Loma Linda Ave/#2015-00985
Adam,
We received an as-built survey for an in-kind rebuild of a boat house and retaining walls. Please review and provide
comments.
Thank you!
Christine Mattson
Planning Assistant
City of Orono
2750 Kelley Parkway I Orono I MN I 55356(physical addressJ
PO Box 66 ( Crystal Bay I MN � 55323-0066 (mailing address)
'� 952.249.4620 I g 952.249.4616
�cmattson@ci.orono.mn.us � � www.ci.orono.mn.us
Office Hours: Monday-Friday 8 am to 4:30 pm
OUR OFFICE WILL BE CLOSED: Thursday& Friday, November 24&25, 2016
Friday, December 23, 2016
Monday, December 26,2016
Monday,January 2,2017
1
City of Orono
��No Hardcover Calculation Worksheet
� � Property Address:
_ ~ /�/� D �o n�A �/n,�pA
F��Kf5H00.E` Prepared by: Date:
G'kGi✓BE� G ¢ A1'Ia��,�'r� ���� O�-�_J
r � —
Stormwater Quality Overlay District Tier: (Circle one) Tier,1 Tier 2 Tie�3 Tier 4 Tier 5
Step 1: XISTING HARDCOvE131
In the following table identify all items of existing hardcover on the property, keyed by letter to Certificate of
Survey (survey must accompany this form). Use as many lines as necessary to accurately depict existing
hardcover status of the property. For Tier 1 properties, identify any features by letter which are split at the 75'
setback line and calculate hardcover square footage separately for each portion.
Key to Total
Surve Hardcover Item(Describe) Length x Width
S uare Feet
Exam le Gara e 24'x 30' 720 S.F.
A
g , � ? S.F.
� Co 'C. TTc P � S.F.
D �'f"' /`t C'.� '' 2 S.F.
E co S.F.
F �;1� � ,_ S.F.
G �3 S.F.
�` r !�c-r s.F.
H C�rs�C. �'E�°S
� t�4 t.�,:;Jz, > -.- „� u : .� . �} // S.F. �
J `�7 S.F. �
K S.F. S
L S.F.
M S.F.
N S.F.
p S.F.
P S.F.
p S.F.
R S.F.
$ S.F.
T S.F.
U S.F.
V S.F.
W S.F.
X S.F.
Y S.F.
Z S.F.
1 Total Existi Hardcover S.F.
Excludabls Hardcover See Cit Code Sec 78-1684 : S.F.
S.F.
S.F.
S.F.
S.F.
2 Total Excludable Hardcover S.F.
3 Net Existin Hardcover Subtract line 2 from line 1 4 S.F.
4 Total LotArea (EXcc up�,t,/G It r��0 F;�'►�tT S.F.
2a O�f 7 S.F.
Proposed Hardcover Percentage [(3)_(4)] 2 2, Z Z ,�o
(Proposed Hardcover next page)
Subdivision Application-January 2016 This is an information packet regarding Hardcover. Every eflort has been�irrade�O��'"'�"^T�
ensure the accuracy of the information contained herein;however,if any information is
not consistent with provisions of the City Code,the Code provisions will prevail.
Page 18 ��� �1� u(�1��-
Zmy� - 009�5 �- 1�►� -oe1.oL